A classic paneled solid wood wardrobe is one of the longest-lead items in a bedroom fit-out, and one of the easiest to get wrong on site. The panels, the mouldings and the scribed reveal all assume that the opening is square, the floor level and the wall finish is complete. When delivery and installation are planned as an afterthought, the result is usually a wardrobe that arrives before the room is ready, sits in a corridor for three weeks, and is finally fitted by someone who never saw the drawings.
The coordination problem is not difficult, but it has to be solved on paper before production starts. This guide walks through the sequence we follow on classic paneled solid wood wardrobe projects, from the first site survey to handover, and shows where the schedule dependencies actually sit.
Why Paneled Solid Wood Wardrobes Are Scheduled Differently
Our built-in furniture is made to measure for each project, and a solid wood wardrobe with applied mouldings and a raised or recessed panel front adds three things that flat-pack or modular systems do not:
- A timber movement allowance. Solid wood responds to the humidity of the room it lives in. Panels are built with construction that allows for seasonal movement, which means the finish spec and the site environment have to be agreed before the carcass is assembled, not after.
- A fixed opening tolerance. Once the carcass dimensions are cut to a survey, they cannot be trimmed on site the way a sheet-based unit can. The wall, floor and ceiling finishes must be at their final position when the wardrobe goes in.
- A finish that has to be protected. Mouldings, edges and stained or painted surfaces are the parts most likely to be damaged by other trades working in the same room afterwards.
Because of this, wardrobe delivery is not a "last item on the list" decision. It sits in the middle of the fit-out programme, and it has predecessors.
Step 1 — Confirm the Survey Before Anything Is Cut
Every wardrobe order should be released against a survey taken after the room's wet work is finished, not from architectural drawings alone. The four measurements that decide whether installation goes smoothly are:
- Floor-to-ceiling height at the back wall, measured at both ends of the run, to reveal any slope or settlement.
- Wall-to-wall width at the top, middle and bottom of the opening.
- Plumb and square of the side walls, including whether the corner is a true 90 degrees.
- The finished floor level relative to the threshold, skirting line and any adjacent door opening.
For a villa or apartment project being fitted out by several contractors, this survey is worth doing jointly with the site builder and recording in writing. Where an arched or moulded elevation is involved, the arch radius and the panel layout should be confirmed on a shop drawing before production, because those elements cannot be adjusted later.
Step 2 — Fix the Finish Specification at the Same Time as the Layout
Configuration of our solid wood wardrobes is specified per project: sizing, material and finish options, and a layout tailored to the space. In practice, the finish decision belongs in the delivery conversation, because it determines packaging, lead time and how the unit is handled on site.
Two points matter here. First, if the wardrobe is supplied pre-finished, the finish has to be matched against the flooring, skirting and wall colour already chosen for the room — that comparison should happen before shipping, not in the bedroom. Second, if a site-applied finish or on-site touch-in of the scribed reveal is planned, the paint or lacquer being used on site should be confirmed in advance so it is compatible with what was factory-finished.
The same applies to interior fittings. Shelves, drawers, hanging rails and any lighting are specified at order stage; retrofitting them after installation means removing doors and panels.
Step 3 — Sequence the Wardrobe Against the Room's Other Work
The most common cause of a delayed wardrobe installation is not the factory; it is the room not being ready. The table below sets out the dependencies we work to.
| Predecessor on site | Why it must be complete first |
|---|---|
| Plastering, painting and wall finish | The reveal is scribed to the finished wall face. Painting after installation leaves overspray on mouldings and glass. |
| Final floor covering laid | Carcass height is calculated from finished floor level. Carpet or timber laid afterwards cannot pass under the frame. |
| Skirting and architrave installed | The side panel meets the skirting line; if skirting comes later, the joint has to be filled on site. |
| Electrical first fix complete | Interior lighting and any mirrored or lit panel need cabling routed before the carcass closes the wall. |
| Site access route cleared | Full-height panels and doors move through corridors, lifts and stairwells. Measure the widest item against the narrowest point on the route. |
Where a project includes matching joinery from the same collection, those items usually follow the same sequence and can share one delivery window — which reduces handling damage and the amount of crated stock sitting on site.
Step 4 — Plan the Delivery Window, Not Just the Delivery Date
For an international project, the shipping date is only one of three dates that have to line up. Our furniture logistics and door-to-door delivery service covers freight forwarding by sea, air and rail, customs paperwork, packaging and container loading, shipment tracking and delivery to site — but the goods still need someone to receive them at the right moment.
- Packaging is specified for the item, not the room. Full-height solid wood panels are crated so the face is protected and the crate can stand upright. Confirm whether the site allows upright unloading and whether a lift or hoist is available.
- Customs clearance sits between vessel arrival and site delivery. Commercial invoices, packing lists and certificates of origin should be prepared with the shipment documents rather than chased afterwards.
- The receiving window needs labour in it. A wardrobe delivered to a site with no crew on the day is a wardrobe that gets moved twice. Every extra handling step is where panel damage occurs.
Step 5 — Installation Day: What Should Be Checked Before Fixing
Under our furniture installation and after-sales support service, on-site installation is followed by inspection and snagging. On the day itself, four checks take five minutes and prevent most call-backs:
- Level and plumb. The carcass is levelled on the floor first; adjusting the doors afterwards cannot correct a leaning frame.
- Door reveal. With paneled and moulded fronts, an uneven gap between adjacent doors reads as a fault even when the unit is sound. Set the reveal with the hinges before tightening fixings.
- Wall fixing substrate. Confirm what is behind the wall at the fixing line. Partition systems need the correct anchor type; fixing into the wrong substrate is the most common structural issue on site.
- Interior fittings and drawer runners. Operate every drawer and rail with weight in it, not empty.
A joint snag list signed by the site contractor and the installer at handover is worth more than a photograph. It records what was accepted and what remains, which matters when the same crew later fits other joinery in the property.
How a Single Supplier Reduces the Coordination Load
When the wardrobe, the matching cabinetry and the internal doors come from different sources, each supplier protects their own tolerances and the joints between them become the site contractor's problem. Under turnkey villa furnishing, we handle design consultation and space planning, material selection and product specification, manufacturing and quality control, project management with site coordination, then final installation and handover — which means one party is accountable for the interface details between fitted items.
The cooperation sequence we work to is straightforward: a project brief and design proposal, then quotation and detail confirmation, then production, shipment and follow-up. The wardrobe shop drawing sits inside that second stage, so the survey findings, the finish spec and the delivery window are all agreed before cutting begins.
Frequently Asked Questions
How far ahead of site completion should a made-to-measure wardrobe be ordered?
Order against the survey taken after wet trades finish, then plan production and freight around the room's readiness rather than the other way round. For an international project, confirm the delivery window at quotation stage so the shipment is booked to land when the room can receive it.
Can a paneled solid wood wardrobe be installed before the flooring is laid?
Not as a rule. Carcass height and the scribed reveal are calculated from finished floor level, and floor coverings cannot be brought in under an installed frame. If the flooring has to go last for protection reasons, that decision needs to be made at survey stage so the base detail is designed for it.
What should be inspected at handover?
Level and plumb of the carcass, door reveal consistency across the run, secure fixing at the correct substrate, operation of all drawers and rails under load, and the condition of panel faces and mouldings after handling. Record findings on a signed snag list.
Planning a wardrobe or joinery package for a project?
Send us the room drawings and site programme, and we will confirm the survey points, finish options and delivery window before production starts. Contact PHILLIP — Phone / WhatsApp +86-13928214007, Email santerson@qq.com.