A wall-mounted sideboard looks like a small item on a hospitality or office fit-out schedule until it arrives on site, sits against a finished wall and has to carry glassware, linen and service equipment every day. That is why the proposal you approve before production matters more than the sample photograph. Below is the practical way we at SANTERSON expect a mature procurement team to read our quotation for Santerson Wall Mounted Sideboards, and the questions we would like you to ask us at each stage.
Start with the scope line, not the price line
Our product pages describe these pieces as configurable dining cabinets and sideboards for living projects, with finish, layout and dimensions specified per space. That single sentence carries real commercial risk: if your purchase order repeats it without detail, three suppliers will quote three different buildings under one name. Before comparing numbers, check that the proposal states which of the following is included:
- The exact elevation for each unit, with overall height, width and projection drawn to your site dimensions.
- Carcass construction and panel thickness, plus edge treatment on every visible surface.
- Door and drawer configuration: quantities, opening direction, hinge and runner make and model, soft-close or push-to-open.
- The wall-fixing method and the substrate it assumes: solid wall, stud partition with noggins, or a steel frame behind cladding.
- Whether integrated lighting, glass shelves, sockets or an integral countertop are inside this line item or priced elsewhere in the package.
Where a unit adjoins other joinery we supply, such as decorative dining cabinets, tall cabinets or an integrated media wall, the proposal should also say which trade owns the interface detail, because that is where site disputes start.
Read the finish schedule as a specification, not a colour name
"Matte grey" means nothing on its own. For cabinetry we manufacture in acrylic, lacquer, melamine and wood veneer, and each behaves differently under commercial lighting and daily handling. A proposal worth approving records the system, not the adjective.
| Finish family | What the proposal should state | Where it earns its keep |
|---|---|---|
| Acrylic | Gloss or matte grade, batch direction for patterned and metallic sheets, edge banding source | Large unbroken front runs in lounges and reception areas where reflections are controlled by design |
| Lacquer | Number of coats, primer and topcoat system, spray or roll application, cure method | Curved and profiled fronts, panelled doors, colour-matched details that banding cannot reproduce |
| Melamine / laminate | Board substrate, decorative sheet reference, texture direction, edge thickness and profile | High-turnover back-of-house, staff areas and repeat units where consistency across rooms matters |
| Wood veneer | Species, cut and grain matching rule, stain and lacquer schedule, acceptable colour range with a signed board | Guest-facing suites and villas where warmth and grain variation are part of the design intent |
Ask for a signed finish board from the same production batch as your units, kept on file. Two years later, when a room is refurbished or a damaged door must be remade, that board is what protects the match.
Check how the proposal handles fixing and site interface
A suspended unit transfers its load, and anything stored in it, into the wall. Our quotation should therefore record what we need from your main contractor, and by when:
- Setting-out drawing approved before wall lining closes up, showing fixing lines, reinforcement and service routes.
- Tolerance allowance for floor level and wall plumb, since a made-to-measure unit is only as straight as the substrate behind it.
- Clear access for installation, plus protection for adjacent stone, plaster and flooring.
- Who supplies and installs electrical connection for internal lighting: our detail drawing versus your M&E contractor.
If these lines are missing, the cost does not disappear; it moves to a variation. We would rather settle them on paper in the design stage than argue about them on site with the unit half-hung.
Judge the supplier by the coordination around the order
Cabinetry rarely travels alone. On a villa, hotel or office package we supply and coordinate interior fixtures alongside furniture and finishes, which is why our service pages describe a single route through design consultation and space planning, material selection and product specification, manufacturing with quality control, project management and site coordination, then installation and handover. For procurement teams this shows up in three useful documents you should expect to receive:
- A shop-drawing set for sign-off, with every dimension, material code and hardware item listed on the drawing itself.
- A production and inspection record tied to your unit references, so a shipment can be traced back to the batch it came from.
- Packing and loading lists keyed to room numbers rather than crate numbers, which is what makes an unloading sequence on site workable.
Our custom and OEM service covers bespoke dimensions, finishes and textures, prototyping and brand marking. If your design team needs a non-standard depth, an integral wine display or a unit that mirrors a door profile already in the building, say so at enquiry stage, because those decisions change cost far less early than they do after tooling.
Price it as a package, then confirm what travels with it
Freight and duties on cabinetry are easy to misjudge when units ship in mixed loads. Our logistics and door-to-door delivery service covers sea, air and rail freight forwarding, export paperwork such as commercial invoices, packing lists and certificates of origin, packaging and container loading, and shipment tracking to the delivery address. When you read the price, confirm which Incoterms apply to your quote, where the goods are insured and to what point, and who handles import clearance at your port. We will state these terms on the quotation; we will not guess them for your project, because duties, permits and inspection requirements differ by country and consignment.
The same discipline applies after delivery. Installation, snag inspection, spare parts and maintenance are listed in our installation and after-sales support. Ask which items are covered, for how long, and which spares we will hold for your project, from hinges and runners to replacement fronts and colour-matched touch-in lacquer. A proposal that names the spare parts you are likely to need in year three is a proposal written by someone who has delivered joinery before.
A quick pre-approval test
Before signing, put the proposal through five questions. Does it fix dimensions and layout by drawing rather than description? Does it name the finish system with a signed board reference? Does it state the wall-fixing assumption and who provides reinforcement? Does it separate what we supply from what your site contractor supplies? And does it list spares, warranty scope and delivery terms in writing? A furniture and building materials supplier that answers all five in one document has usually already solved the problem you would otherwise meet on site.