A swim spa enquiry rarely fails over price. It stalls because the supplier is left to guess: the buyer sends a model number, and the quotation comes back with assumptions about the slab, the power supply, the drainage route and who handles installation on site. Before you write to us about Outdoor Swim Spa WS-PC07A, gather the information below. Send it in one message and you will receive a specification sheet, a configuration list and a landed-cost quotation instead of a round of clarifying questions.
1. The site dimensions and how the shell gets there
The catalog lists WS-PC07A at 7000 × 3000 × 1470 mm. Treat that as the footprint to design around, not a clearance figure. Measure three things on your plans and send them as a marked-up drawing or photographs with dimensions:
- Clear opening — length and width of the prepared pad plus working space at the sides for the equipment compartment and future access.
- Access route — gate width, turning radius, overhead wires, steps or a lawn that a crane or a road roller may need to cross. Tell us whether the unit is delivered in one piece or as sections for your site.
- Structure under it — slab thickness and reinforcement, or the steel/timber frame if the spa sits on a deck or a podium. A raised installation needs the load path confirmed by your engineer before we quote the supporting frame.
If the spa is going into the ground or half-recessed, say so at the start. Recessed work changes the access panel layout, the insulation package and the drainage detail, and it is far cheaper to draw once than to retrofit.
2. The electrical supply available at the pad
The catalog specification for WS-PC07A shows a total power figure of 9.55 kW. That number is what the standard configuration draws, and it is the first thing your electrician needs to check against what the property can actually deliver. Have these details ready before you ask us to confirm the electrical requirement:
- Single-phase or three-phase supply at the property, voltage and frequency.
- Distance from the main switchboard or distribution board to the spa location, which drives the cable size and the voltage drop.
- Whether a dedicated circuit with an isolator and RCD/RCBO protection can be run to the pad, and who is doing that work.
Heating choice changes the load more than anything else. An electric heater suits a property with spare capacity; a heat pump shifts the demand profile and runs cheaper over a long season but needs its own air path and condensate route. Tell us which one you are considering and we will confirm the equipment list and the supply requirement for that configuration.
3. How the spa will be used, week by week
The same shell serves very different routines. Write down how the space is actually going to be used, because it decides the jet layout, the seating positions and whether a swim current belongs in the specification:
- Training — daily lap swimming needs a swim training unit; WS-PC07A is catalogued without one, so if training is the priority we will discuss the variants that include it.
- Therapy and recovery — cold-plunge or hydrotherapy use points to jet placement and pressure, not length.
- Family leisure — children, seating depth, steps and handrails matter more than jet count.
- Commercial or hospitality duty — guest use means higher bather load, a heavier filtration duty and easier service access.
Also state the season you expect to run it in. Year-round use at a comfortable water temperature is a different machine from a summer-only plunge: insulation, cover and heat pump become the deciding costs rather than the shell itself.
4. Water, drainage and the treatment plan
The catalog shows WS-PC07A with water jets, LED lighting and ozone. Ozone is a sanitising aid, not a complete treatment system, so tell us what you already have in mind:
- Where fresh water connects, and whether the fill line needs a tap, a hose bib or a plumbed connection.
- Where the water goes at drain-down and during backwashing — stormwater or foul connection, and any local restriction on discharge that your builder must satisfy.
- Your preference among salt systems, mineral or UV options. UV sterilisation is listed as an option for this range; we will confirm compatibility with the configuration you choose.
- How often the spa sits unused, which affects filtration runtime and the filter pump specification.
5. The options list you want priced, not assumed
Catalog-listed extras for this range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability differs by configuration, so send us the items you want and we will return a line-by-line quotation rather than a single bundled price. Two points worth deciding before the enquiry:
- Cover — a thermal cover is the largest lever on running cost and on child safety; decide whether it is manual, insulated or automatic.
- Insulation — worth specifying from the start in cooler climates or for an outdoor installation used through winter.
If you are furnishing the surrounding area at the same time, mention it. Poolside loungers, pergolas and cabana daybeds come from the same factory, so one shipment and one site visit usually beats two.
6. Your delivery terms and who does what on site
We arrange freight forwarding by sea, air and rail with customs paperwork and door-to-door delivery, but the boundary between our scope and yours needs naming in the enquiry. State:
- The delivery address, and whether the site is reachable by a standard container truck.
- Your preferred Incoterms — delivered to site, port of destination, or ex works.
- Who pours the slab, runs the power, connects water and drainage, and sets the unit in place.
- The date you need the spa on site, working backwards from any landscape or handover deadline.
Send us that list of dates and responsibilities and we will confirm what our team handles at delivery, including installation support and after-sales service for the selected configuration.
7. The other products in the same enquiry
Swim spas are rarely bought alone. Outdoor dining sets, sun loungers, wicker conversation suites, pergolas, wall cladding, flooring and lighting for the same terrace or pool deck can be consolidated into one order with one production schedule. If your project also needs custom sizes, finishes or branded elements, our Custom & OEM Service covers bespoke dimensions, material and finish choices, prototyping and private labelling — send the drawings or reference images with the spa enquiry so both items land on the same quotation.
8. What to compare before you decide
WS-PC07A is one model in a configurable range that runs from compact plunge units to long swim channels. Before committing, ask us for two or three configurations side by side: overall dimensions, jet count and layout, pump and filtration specification, heating option, total power, and what is included versus optional. Compare the whole Swimming Pools and Swim Spas range on those columns rather than on a single headline price; a smaller unit with the right insulation and heat pump often costs less over ten years than a larger one run without them.
A short checklist to send with your enquiry
- Site plan or photos with clear dimensions, access route and slab or deck detail.
- Supply type, voltage, distance from the switchboard, and heating preference.
- Intended use: training, therapy, family or commercial duty, and the season of use.
- Water connection, drainage route and preferred sanitisation approach.
- Options you want priced: cover, insulation, steps, UV, filtration upgrade.
- Delivery address, Incoterms, site responsibilities and required on-site date.
- Any other products or custom work to consolidate into the same order.
Send those seven items with a note about your project, and you will get back a configuration sheet for Outdoor Swim Spa WS-PC07A, an itemised quotation and a realistic production-and-delivery schedule. As a China-based furniture and building materials manufacturer working on villa, resort and hospitality projects, SANTERSON supplies the spa, the surrounding outdoor furniture and the interior finishes in one coordinated order — design consultation, production, logistics and installation support through a single project contact.