A wardrobe order rarely fails on the door finish. It fails on the count: one opening measured twice, one panel ordered short, one frame colour specified in a shorthand nobody else used. Frosted Glass Aluminum Frame Wardrobes are made-to-measure, so the quantity sheet and the finish schedule have to be locked before production starts. The steps below are the ones we ask project teams to work through on villa, apartment and hospitality bedroom packages.

Start from openings, not from a room count

The unit number in your bill of quantities is only a placeholder. What matters for a made-to-measure run is the list of individual openings: each wardrobe position, its width and height, whether it runs to the ceiling or stops below a bulkhead, and what sits on either side. Two bedrooms that look identical on a typical floor plan often differ by a skirting return, an air-conditioning trunking, or a door swing that changes where the first panel can start.

For each opening record the clear width and height at three points across the span — left, centre, right for widths; floor, mid, head for heights — and note the smallest figure. Slab levels and plaster thickness vary more than most schedules admit, and an aluminum frame with frosted glass infill cannot be scribed on site the way a timber carcass can.

  • Opening width and height, taken at multiple points, plus the floor finish build-up that is still to come
  • Ceiling detail: exposed slab, plasterboard, or a bulkhead with services behind it
  • Adjacent obstructions: switch plates, door reveals, radiators, headboards, built-in vanities
  • Door operation required — sliding, hinged or open — because the operating envelope sets panel sizes
  • Internal layout for that position: hanging, shelving, drawers, or a mix

Split the quantity sheet into three lines

When quantities are written as one line — "wardrobes, 24 off" — coordination problems surface after the order. Split the sheet so each element can be confirmed separately.

  • Frame and carcass: number of openings, overall dimensions, frame profile and finish
  • Door leaves: count per opening, leaf widths, glass type per leaf, handle and hardware set
  • Internal fittings: shelf lengths, hanging rails, drawer banks, integrated lighting where specified

A single bedroom may need one frosted-glass sliding pair plus a matching hinged section. A guest-room floor may repeat the same elevation eight times with two mirrored variations at the end of the corridor. Those variations are what break a flat quantity, and they belong on the sheet as separate items.

Coordinate the glass finish across the whole floor

Frosted glass reads differently against different frame colours and in different light. Before you commit to one specification for every room, decide which surfaces should match exactly and which may deliberately differ.

If frosted leaves face a corridor and clear leaves face the bedroom interior, say so room by room. A finish schedule that says "frosted glass" for the whole project invites one substitution somewhere, and glass infill cannot be recoloured afterwards.

Match the wardrobe to the rest of the joinery

Wardrobes rarely stand alone. In a bedroom package they sit alongside vanities, tall cabinets, media walls and doors that share the same frame profile or the same wall plane. Ordering them from different places is where colour and level mismatches appear.

Our Interior Design Services cover space layout planning, product specification and drawing coordination for exactly this reason: the wardrobe frame, the Glass Sliding Door Wardrobes in an adjacent room, and the built-in furniture around them are checked against one set of dimensions rather than three.

Keep one schedule for all Minimalist Black Frame Wardrobes, hinged sections and open shelving in the same room. Where a frame colour repeats, list every position that uses it, so the same profile and finish are produced in one batch.

Confirm the specification before production opens

Every made-to-measure order should come back with a drawing you can sign off. Before releasing it, check that the drawing shows:

  • The opening it belongs to, by room reference, not just a generic elevation number
  • Finished dimensions against the agreed floor and ceiling levels
  • Panel count, leaf widths, and which glass finish sits on each leaf
  • Frame colour and profile, written in full rather than as an internal code
  • Internal layout, hardware type, and any integrated lighting or power provision

Confirm dimensions and selected specifications for each project before the order is released. Where a room repeats, confirm one unit first and hold the remainder until that approval is signed — it catches a measurement convention error while only one set is in production.

Sequence delivery against the site programme

Glass-fronted frames need dry, level rooms and finished floor levels. Build the wardrobe delivery into the programme after plaster has dried, floor finishes are laid, and services are fixed in position. Our Logistics & Door-to-Door Delivery service handles freight and shipment coordination, so quantities can be split into batches that follow the site sequence instead of arriving as one drop.

Where installation is on the critical path, Installation & After-sales Support covers fitting and inspection, so a snag list can be closed out room by room while later batches are still in transit.

A short checklist before you raise the purchase order

  • Every opening measured at multiple points, with the tightest dimension used
  • Frame, leaves and internal fittings listed as separate quantity lines
  • Glass finish stated per room and per leaf, not per project
  • Frame colour written in full, matched against adjacent joinery
  • Approval drawing signed for one prototype unit before the balance is released
  • Delivery dates set against finished floor levels and dry plaster

Send us your room schedule and we will return a coordinated quantity list and drawings for the wardrobe positions across the project — including frame, glass finish and internal layout per opening.

SANTERSON — furniture and building materials manufacturer and one-stop project supplier. Contact: PHILLIP, Phone/WhatsApp +86-13928214007, Email santerson@qq.com. Contact us to discuss your wardrobe package.