A procurement team rarely rejects a swim spa proposal because the shell looks wrong. They reject it because the package arriving for approval answers three questions and leaves twenty others open. If you are specifying the Outdoor Swim Spa WS-PC05ST for a villa terrace, a resort garden or an apartment amenity deck, treat the submittal as the document that lets a consultant sign off, a contractor order correctly and a site team pour the right slab. Below is the checklist we work to when we assemble a submittal for this model.

1. A cover sheet that identifies the exact configuration

The PC05ST family shares most of its equipment list across variants, so a submittal that says only "PC05 series" is unusable for approval. State the model designation exactly as ordered — WS-PC05ST, or the longer WS-PC05ST-L and shorter WS-PC05ST-S — together with the project name, the quotation reference and the date of the specification you are responding to. One line on that cover sheet prevents a shipment of the wrong length arriving on site.

2. Shell dimensions, footprint and clearance zones

Catalogue dimension for the standard WS-PC05ST is 5000 × 2400 × 1470 mm; the -L variant runs 5490 × 2400 × 1470 mm. Put those numbers on a scaled plan, not just in a table, and show what the drawing does not show: access for delivery, the path from the truck to the terrace, crane or lift reach if the unit goes up to a podium level, and the maintenance clearance you need around the equipment bay so a technician can reach the filter pump and controls without removing decking.

Where the spa sits relative to the building matters as much as the spa itself. If your project also specifies outdoor furniture for villas and resorts around the water — loungers, a shade structure, a changing area — show those on the same plan now. Furniture placed later routinely blocks the equipment access that was assumed at design stage.

3. The equipment schedule, item by item

The published specification for this model lists one control system, one swim training system, one filter pump, six jets in total and four LED lights, with a total power figure of 6.55 kW. Your submittal should reproduce that list as a schedule with make, model and quantity for every item, and it should be explicit about what is not on the list. On this model the water pump is not listed in the catalogue specification; whether one is included, and at what duty point, has to be settled in writing before order confirmation rather than discovered during commissioning.

Options that sit outside the base configuration — UV sterilisation, a heat pump, sand filtration, additional insulation, entry steps — each need their own line with a clear "included / optional / not supplied" mark. A submittal that mixes standard and optional equipment in one undifferentiated list is the most common source of a variation order after award.

4. Electrical and control documentation

A 6.55 kW connected load is not an electrical design; it is the starting point for one. The submittal should carry supply voltage and phase requirements, the recommended circuit rating and protective device, cable sizing guidance, earthing and equipotential bonding arrangements, and the location of the local isolator. Include the control panel layout and say plainly who supplies the feeder and who terminates at the unit. If your site electrical engineer needs a different supply arrangement for the selected configuration, that is resolved here, not on the last week before handover.

5. Structural and waterproofing interfaces

A water-filled acrylic shell plus people is a heavy line load on a slab or a terrace. The submittal should state the operating weight for the configuration as ordered, the bearing arrangement at the base, and the flatness tolerance for the supporting surface. For a recessed or semi-recessed installation, add the perimeter detail: who forms the void, who applies tanking, how the overflow and drain connect, and how access covers are set into the finished deck level.

6. Water treatment and daily operation

Ozone is shown as a feature on this model; disinfection duty still has to be described end to end. Cover filtration rate and run schedule, chemical dosing arrangements if they are part of the package, drain and refill provisions, and what the owner's operations team actually does each week. Hotel and resort operators in particular need this section written for the staff who will run the spa, not for the engineer who installed it.

7. Performance claims you can defend

The swim training system is the reason most buyers choose an ST configuration, so describe how it produces flow and what a swimmer experiences at each setting. Jet count alone — six in total — does not tell a consultant whether the layout suits hydrotherapy seating or lap swimming, so include a jet map with seat positions marked. Resist the temptation to add comfort or efficiency figures that are not on the specification sheet; an unverifiable claim in a submittal is a liability at handover.

8. Logistics, site handling and installation sequence

Include the shipping package dimensions and weight, the delivery lead time for the confirmed configuration, and the lifting or placement method proposed for your site. Then set out the installation sequence with responsibilities named: crane or manual route, setting to level, electrical connection, plumbing connections, filling, commissioning tests and the handover record. For projects far from the factory, this section is where a supplier either looks competent or exposes a gap.

9. Warranty, spares and after-sales

State what is covered, for how long, on which components, and what voids the cover. List the wear items — jets, seals, filters, lighting — with part numbers so the operator can order them without a drawing search. Note who performs warranty work in your region and what response time is committed to in writing.

10. As-built drawings, manuals and the handover pack

Close the submittal with what the client keeps: as-built dimensioned drawings, wiring diagrams, equipment manuals in the language of the operating team, commissioning records, a spare-parts list and a maintenance schedule. A swim spa handed over without that pack becomes somebody else's problem within two seasons.

How we put this together

We have manufactured furniture and building materials for hospitality, villa and office projects since 2008, and the swimming pools and swim spas line is specified alongside the rest of the fit-out rather than as a standalone purchase. That is usually the better way to buy one: when the spa, the poolside furniture, the shading and the interior fixtures come through one turnkey furniture and building materials process, the interfaces above get resolved once instead of in six separate email threads. Send us the model designation, the site drawings and the consultant's comments, and we will return a submittal your team can approve.