A wardrobe quotation rarely goes wrong over style. It goes wrong over the gaps in the paperwork: a height written as "as built", a glass type left blank, a hinge brand nobody named. The Glass Hinged Wardrobes in our Hinged Door Wardrobes collection are made to measure for each project, which means the drawing and the specification sheet decide the result long before production starts. This guide sets out the fields a buyer, builder or designer should fill in before a price is requested, so that what arrives on site matches what was approved on paper.

Start with the opening, not the door

Glass-fronted hinged wardrobes are unforgiving of small dimensional errors, because the glass, the frame and the reveal are all fixed once manufactured. Record the opening at three widths and three heights, floor to ceiling at several points, and note which wall is out of plumb. Then state how the unit is expected to meet that wall.

  • Finished floor level, and whether flooring or skirting is installed before or after the wardrobe goes in.
  • Ceiling construction and whether the unit runs to a hard ceiling, an scribe, or a bulkhead.
  • Obstructions: switch plates, air diffusers, curtain rails, door architraves, radiators, downlights.
  • Wall material, since fixing details differ between masonry, timber stud and plasterboard.

Send the raw measurements plus a simple sketch with dimensions on all four walls. A single room plan tells the workshop where the unit sits relative to traffic flow, which in turn determines which door leaf should hang first.

Specify the glass by behaviour, not by name

"Glass door" is not a specification. The same phrase covers clear, frosted, smoked and ribbed surfaces, each with a different privacy effect and a different reflection in a lit bedroom. Our catalogue lists these as separate products — Clear Glass Wardrobes, Frosted Glass Wardrobes, Smoked Glass Wardrobes and Ribbed Glass Wardrobes — precisely so that a specification can point to one of them rather than to a general idea.

For each field on the interior and each door leaf, write down:

  • Surface treatment: clear, frosted, smoked or ribbed, and whether it is applied to the outside face, the inside face or both.
  • Tint or colour reference, quoted as a code from a sample rather than as a word.
  • Transparency intent: fully open display, soft diffusion that hides clutter, or near-opaque reflection.
  • Interior lighting plan, since a lit interior turns clear glass into a display case and shows fingerprints on every other surface.

Order a physical sample of the chosen glass before signing off. The difference between two frosted finishes is easy to miss on a screen and obvious once a full-height leaf stands in the room.

Fix the frame, edge and hardware details

Hinged glass doors carry their own weight on two or three points, so the hardware schedule is a structural item, not a finishing afterthought. Where an aluminium-framed alternative is being considered instead of a full glass leaf, Aluminum Frame Glass Wardrobes and the framed variants in the same family show how the profile colour and the glass are specified together.

ItemWhat to write on the sheet
Frame or profileFramed or frameless; profile material and colour; sightline width where the frame meets a neighbouring panel.
Glass edgePolished, seamed or chamfered edges, and whether exposed edges face into the room.
HingesQuantity per leaf, mounting position, opening angle, and soft-close or standard action.
HandlesIntegrated profile handle, recessed pull or separate knob, with a finish code that matches other ironmongery in the room.
Door sequenceWhich leaf opens first on paired doors, and where the meeting stiles overlap.
Clearance to walls and ceilingsSwing arc checked against bed doors, handles and adjacent joinery at full opening angle.

Ask for the swing arc to be drawn on the plan at 90 degrees open. A glass leaf that fouls a bed frame or a light switch is a site problem no finish can hide.

Write the internal layout as a zone list

Glass doors make the interior visible, so the internal layout is part of the appearance. List zones by use and give each one a dimension: hanging short, hanging long, shelf stack, drawer bank, tray or shoe bay, and any dedicated space for luggage or an ironing board. Where a project needs more than display, our Custom Minimalist Bedroom Wardrobe page describes the same customisation approach — personalised sizes, internal layouts, door styles and surface finishes — for bedroom fit-outs across apartments, villas and hotel rooms.

  • State hanging heights by garment type, including coats and dresses at full drop.
  • Give drawer counts and front heights, and note whether drawers sit behind a glass leaf that will show their contents.
  • Mark shelf spans, since long unsupported shelves bow under folded linen.
  • Identify anything that must be concealed, then choose the glass or panel type that conceals it.

Match the wardrobe to the rest of the fit-out

A bedroom rarely takes one item at a time. When wardrobes, vanity units and Built-in Furniture are ordered together, panel thickness, veneer or lacquer codes and shadow gaps can be reconciled once, in one drawing set. That is also where the wider range becomes useful: the same project file can carry Classic Wooden Hinged Wardrobes for a traditional wing and glass-fronted leaves for a modern bedroom, with finishes matched across both.

If the walk-in is part of the scope, specify it as a room rather than as a product. Glass Walk in Wardrobes are listed within our Walk-in Wardrobes collection with made-to-measure sizing, material and finish options, and a layout tailored to the space.

Confirm before production: the sign-off list

  • Dimensioned drawings for every elevation, signed against the site survey date.
  • A glass sample reference for each leaf, with the face that carries the treatment named.
  • Hardware schedule with quantities, finishes and opening angles.
  • Internal layout drawing with zone dimensions and load notes.
  • Finish codes for frames, panels and ironmongery, quoted from physical samples.
  • Delivery sequence and on-site storage plan, since glass units need a protected route to the room.
Anything left as "to be confirmed on site" will be priced as a placeholder and re-priced later. Close those items in writing before manufacture begins; dimensions and selected specifications are confirmed per project, not carried over from a previous order.

How our team turns the sheet into a quotation

Send the survey, the zone list and the finish references, and the workshop returns drawings for review rather than a single line price. Our Custom & OEM Service covers custom furniture design and prototyping, bespoke material finishes and textures, and OEM production with flexible minimum order quantities — useful for a single villa bedroom or for a repeated guest-room type across a hotel. Where a whole apartment or villa is being furnished at once, One-stop Solution coordinates wardrobes alongside kitchen cabinetry, doors, wall finishes, lighting and bathroom fixtures through one project file, with production, logistics and installation managed under the same scope.

Planning a bedroom or a full fit-out? Send your drawings and target dates to our team, and we will come back with a specification review, suggested glass and finish options, and a quotation built on the details above.