An undermount basin sits below the countertop, so the stone, the cut-out and the cabinet below all have to agree with each other. That single fact is why an enquiry about a Santerson Undermount Basin goes much faster when the drawings, dimensions and finish decisions arrive with it. Below is the practical checklist we ask project owners, contractors and designers to have ready before the first conversation.
1. The room drawing and the vanity layout
Send the bathroom plan or a marked-up sketch, even a rough one. What we need from it:
- The clear length of the vanity run, and where the basin is expected to sit along it.
- Which wall the basin is against, and whether the vanity is wall-hung or floor-standing.
- Positions of the existing or planned waste stack, water supply points and any wall-mounted tap or spout.
- Adjacent fixed elements you cannot move: a door swing, a niche, a mirror cabinet, a shower screen.
A project photograph of the space, plus one of the current setup if this is a renovation, removes most of the guesswork in a single message.
2. Countertop material and thickness
An undermount basin is fixed under the deck, so the countertop carries the visual and structural load. Tell us:
- The deck material you intend to use — engineered stone, marble or another surface from our Stone & Marble Surfaces range.
- Slab thickness, and whether a mitred (built-up) edge is required.
- Edge profile and splashback preference, if any.
- Whether the deck is being fabricated locally or supplied with the basin as one assembly.
If you have not chosen yet, say so. We can work from the room dimensions and propose a matching deck and basin combination instead of waiting for a finished material schedule.
3. The numbers that decide fit
These are configurable, so there is no standard size to assume. Please provide or confirm:
| Item | What to send |
|---|---|
| Vanity outer dimensions | Width, depth and height, in millimetres. |
| Basin position | Set-back from the front edge and offset from each side wall. |
| Cut-out size and shape | Length, width and corner radius; note if the cut-out must clear a drawer or door below. |
| Tapware plan | Deck-mounted, wall-mounted or spout-plus-hand-shower, with hole count and spacing. |
| Waste and overflow | Overflow required or not, waste type, trap depth available in the wall or floor. |
| Clearance below the deck | Usable cabinet height after the basin is hung, so drawers and pipework still fit. |
Where a dimension is still open, mark it as "TBC" rather than leaving it out — an open item is easier to close than a missing one.
4. Finish and style decisions
Finish, layout and dimensions are specified per project, so the more of this you settle before the enquiry, the fewer revision rounds follow:
- Colour and surface for the basin and deck, with a reference sample or code if you have one.
- Tapware finish, so the metal matches across basin, shower and accessories.
- Whether the same bathroom needs a mirror cabinet, vanity lighting or additional storage units from the same batch.
For a shared bathroom where two people get ready at once, a Santerson Double Basin Countertop is usually the better starting point than trying to fit two undermount bowls into a narrow deck. Send us the vanity run and we will tell you honestly whether the room supports two basins with usable elbow room.
5. Quantity, programme and site conditions
- How many bathrooms are in scope, and how many identical repeats there are.
- The required on-site date, working backwards from handover rather than forwards from today.
- Delivery address and whether the site accepts containers directly or needs a transfer.
- Who installs: our team on site, your tiler and plumber, or a local contractor we brief with drawings.
Repeats matter. A single master-bathroom basin and a thirty-unit hotel floor are quoted and packed very differently, and knowing the count early keeps the offer realistic.
6. Who should be in the first conversation
The fastest enquiries include the person who can sign off dimensions — usually the designer, site supervisor or client representative. Plumbing and stone-fabrication questions get answered in one pass instead of three email chains.
What happens after you send it
With the plan, the dimensions and the finish direction in hand, the sequence is straightforward: we review the layout, come back with a proposal and quotation for detail confirmation, then move into production, shipment and follow-up. Where the room needs help rather than just a product, our design service covers space planning, material selection and product specification before anything goes into production.