An arched paneled wardrobe is one of the easiest items in a joinery package to misquote. Two buyers can describe the same bedroom and receive prices that differ by a wide margin, because nothing in the written request actually fixes the arch radius, the panel construction, the door method or where the unit has to land on site. If you are ordering custom furniture from an overseas factory, the quality of your request for quote decides whether the reply is a real quotation or a guess.
Our Arched Paneled Wardrobes sit within the Classic Paneled Wardrobes collection and are made to measure for residential wardrobe projects, with the finish, layout and dimensions specified per space. That "per project" approach is exactly why a vague enquiry cannot be priced properly. Below is the information we need from a buyer, and what each item changes in the price.
Start with the wall, not the wardrobe
Send a measured drawing of the recess or the wall run the wardrobe has to occupy. Give overall width, height and depth as raw room dimensions, then mark everything that interferes with a straight box: out-of-plumb walls, skirting that stays in place, a ceiling bulkhead, an air-conditioning line, a light switch, a radiator, or a floor finish that has not been laid yet. Built-in wardrobes are fitted to the building, so the site condition is part of the specification.
State where the units are being delivered and how far they must travel inside the building. A wardrobe that has to pass a narrow stairwell or a tight lift may need to be built in sections, which changes both the carcass detailing and the number of packages. Tell us the access route at the time of the enquiry rather than after production.
Define the arch before anyone prices it
The arch is the most expensive detail in this product family, so describe it precisely:
- Which element carries the arch — the top of the carcass, the door frame, or a decorative surround panel.
- The radius or span and rise, and whether the curve is a true semicircle, a segmental curve or a soft ogee.
- Whether the arch repeats across several doors at the same pitch, or changes from one unit to the next.
- Whether the arch is solid, veneered over a substrate, or a bent frame with an infill panel.
A sketch with dimensions is acceptable. A photograph of a reference detail is better. "Arch top, similar to classical" is not workable and will produce the widest possible price band, because the supplier has to allow for the most complex interpretation.
Specify the panel and the finish
Paneled doors are defined by how the panel sits in the frame. Tell us whether you want a raised panel or a recessed panel, the profile direction of the moulding, and the exposed width of the stiles and rails. Then state the substrate and the surface: solid timber, engineered board with a wood veneer, lacquer, melamine, acrylic or PVC. For any coloured or sheen-specific finish, give a standard colour reference or send a physical sample, because words such as "warm grey" or "ivory" do not survive an ocean shipment of correspondence intact.
Ask for a made-to-order sample door with the arch detail before the full set is released. This is the single most effective way to lock the appearance and construction, and it prevents a finish dispute at handover.
Set out the interior layout room by room
Price follows internal fitments as much as external styling. For each unit list:
- Hanging sections and their heights, including any double-hang arrangement.
- Shelf counts and depths, and whether shelves are fixed or adjustable.
- Drawer numbers, drawer type and any internal dividers for accessories.
- Full-height or corner sections, and how they connect to the adjacent run.
- Integrated lighting, mirror panels, glass inserts or a vanity surface, if required.
If you have not settled the interior layout, say so plainly in the enquiry and ask for options at two fitment levels. An honest "not yet decided" produces comparable pricing; an assumed layout produces quotations that cannot be compared.
State quantities, phasing and the schedule
Give the number of units per room type, plus a room-by-room schedule if the project has repeated bedroom layouts. Note whether all units are needed at once or in phases, and give the required site delivery date rather than the date you want to place the order. Built-in joinery sits on the critical path behind flooring, painting and electrical first-fix, so a late wardrobe handover stalls the trades that follow it.
If your drawings are still at design stage, ask us to price from the design package and confirm that the figures are indicative until dimensions are taken on site. We work through design coordination, production coordination and on-site guidance, so an enquiry at drawing stage can be developed into a firm specification instead of being priced twice.
Say what is included in the delivered price
A quotation is only comparable when buyers and sellers agree on scope. Ask each supplier to state, item by item:
- Whether hardware — hinges, slides, handles, hanging rails — is included or supplied separately.
- The packing standard and the number of packages per unit.
- The freight basis: factory gate, port of destination, or door-to-door delivery, and who handles customs documentation.
- Whether installation is included, and if the site needs a local trades team working alongside our instructions.
- What after-sales cover applies to finishes, hardware and replacement panels.
Compare quotations on this basis, not on the headline number. The cheapest landed figure usually excludes one of these lines, and the omission surfaces as a variation order.
Confirm who signs off what, and when
Name the decision maker for finish approval and dimension sign-off in the enquiry. Ask for a production drawing for your countersignature before manufacture begins, and set the point at which changes stop being free. On wardrobe work, the two irreversible decisions are the arch geometry and the finish; once both are approved, later revisions are rework rather than edits.
A short checklist to paste into your next enquiry
| Item | What to state |
|---|---|
| Location and access | Delivery address, floor, route from the entrance, delivery date |
| Measured dimensions | Width, height, depth per unit, plus obstructions and finish levels |
| Arch definition | Element, span and rise or radius, curve type, construction method |
| Panel and finish | Raised or recessed, profile, substrate, surface, colour reference or sample |
| Interior fitments | Hanging, shelves, drawers, corner units, lighting, glass or mirror |
| Quantity and phasing | Units per room type, repeated layouts, release schedule |
| Scope of price | Hardware, packing, freight basis, installation, after-sales cover |
| Approvals | Named approver, production drawing sign-off, change cut-off |
Send that information and a supplier can return an accurate, comparable quotation instead of a range. If you are coordinating wardrobes alongside kitchens, bathrooms, doors and other finishes on one project, coordinating the joinery package in one programme keeps dimensions, finishes and delivery dates under a single schedule.