An L-shaped corner cabinet sits exactly where a kitchen plan goes wrong most often: the junction of two walls, behind a door swing, under a sloping ceiling or beside a flue. Two projects that look identical on a mood board can need completely different carcass sizes, hinge clearances and internal fittings once you measure them. That is why a supplier cannot give a serious price from a photograph and a colour name alone.

Below is the information we ask project buyers, contractors and designers to send before we quote L Shaped Corner Cabinets or any other made-to-measure cabinetry in our kitchen range. Everything on this list is something a factory needs to cut panels, choose hardware and pack the goods correctly — not paperwork for its own sake.

1. The Drawings: Plan, Elevations and Section

A dimensioned floor plan is the starting point, but it is rarely enough on its own. For a corner unit we need:

  • The plan view with overall room dimensions, the two wall runs that form the corner, and the position of windows, doors, radiators, soil stacks and any protruding structure.
  • Elevations of both walls the cabinet will sit against, showing height to the ceiling or soffit, and the run length available before the next appliance or tall unit.
  • A section through the corner where floor finish heights change — for example tiled hall meeting a floating timber floor in an open-plan villa — because a 15 mm floor build changes leg height and door alignment.
  • Setting-out dimensions from fixed reference points, not from an existing cabinet you plan to remove. If the walls are old and out of square, say so; we will allow for scribing on site rather than assume a 90° angle.

If your team has a design intent but no technical drawings yet, our interior design service covers space layout planning, furniture layouts and 3D visual renderings, plus drawing and production coordination. Send the concept and we will turn it into manufacturable details.

2. The Corner Type and Internal Fitting You Want

"Corner cabinet" covers several very different products, and each one carries a different hardware cost. Tell us which behaviour you want in the dead corner:

ConfigurationWhat it doesWhat we need to know
Pull Out Corner CabinetsCarousels or pull-out trays bring the rear of the corner forward when the door opens.Door side, required load per shelf, and whether the run on either side is base or tall.
Lazy Susan Corner CabinetsRotating shelves for pots, pantry goods or small appliances.Shelf diameter, rotation clearance, and whether the corner is blind or angled.
Open Shelf Corner CabinetsOpen shelving for display, spices or cookbooks; no door hardware.Shelf depths and whether the unit is wall-hung or floor-standing.
Glass Front Corner CabinetsGlazed doors for display, usually with internal lighting.Glass type and tint, frame profile, and where the power feed for lighting lands.
Blind corner with plain shelvesThe lowest-cost option; accessible but with wasted depth.Acceptable access trade-off, or whether you would rather have a drawer bank on that run.

Also state whether the corner is base (floor-standing), wall-hung, or a tall/pantry corner. A tall corner unit next to an oven needs ventilation gaps and appliance datasheets before we can quote, which is why our Custom Built-in Kitchen Cabinets are specified with the appliances already identified.

3. Appliances, Worktops and Services

Cabinetry is only one layer of a kitchen. Please send:

  • Appliance schedule with make, model and cut-out dimensions for built-in ovens, microwave drawers, dishwashers, wine cabinets and refrigeration.
  • Worktop material and thickness, plus the edge profile and whether a upstand or full backsplash is required — stone worktops set the carcass height tolerance.
  • Sink position and bowl size, tap hole count, and the location of water supply, waste and gas points relative to the corner.
  • Electrical points, socket heights and any integrated cabinet lighting circuits, including transformer access.
  • Hob extraction type: ducted, recirculating or induction with integral extraction.

These details decide whether a corner can be used at all. A sink in the corner with a tall tap clashes with a wall unit; a corner carousel cannot sit under a waste trap. We would rather resolve this on paper than discover it during installation.

4. Materials, Finish and Hardware Specification

Our kitchen cabinetry is made to measure, so the specification you send becomes the production order:

  • Panel material — substrate and core board for the carcass and doors.
  • Door style — flat panel, handleless, shaker, aluminium frame with solid panel or glass front. Our finish range includes matte lacquer, high gloss acrylic, melamine, wood veneer and two-tone combinations.
  • Colour reference — a RAL, Pantone or paint code, or a physical sample if the colour must match existing joinery on site. Screens do not reproduce metallics and greys reliably.
  • Hardware — hinges (soft-close standard), drawer slide rails, handles or integrated profiles, support legs and connecting brackets. Matching hardware is supplied with the cabinets; tell us if your project specifies a particular brand.
  • Internal fit-out — drawer interiors, pantry racking, bin housings, spice units and any laundry integration.

For hotel apartments, serviced residences and villa schemes we usually recommend locking the finish schedule across all units before quoting, so corner units and straight runs are produced in one batch from the same board lot. That keeps colour consistent and simplifies on-site assembly.

5. Quantities, Site Conditions and Delivery

The commercial side of the quotation depends on scope:

  • Quantity and repetition — how many corner units in total, how many identical layouts, and whether this is a single villa or a multi-unit apartment block. We work with flexible minimum order quantities.
  • Site access — lift dimensions, stair width, parking for a truck, and floor level. Assembled carcasses and flat packs need different packing if the lift is small.
  • Delivery terms and destination — port or site address, preferred Incoterms, and any import documentation your customs broker requires. We arrange freight forwarding by sea, air and rail with commercial invoices, packing lists and certificates of origin.
  • Installation route — whether your own fitters assemble the units or you want installation support and snag inspection on site.
  • Programme dates — required production completion and site delivery date, plus any measurement visit that must happen after first fix.

Our standard cooperation steps are straightforward: project brief and design proposal, then quotation and detail confirmation, then production, shipment and follow-up. A complete enquiry shortens the first two stages considerably.

A Short Checklist to Paste Into Your Enquiry

  • Dimensioned plan, two elevations and a section; wall angle if not 90°.
  • Corner type: base, wall-hung or tall; blind or angled.
  • Internal fitting: pull-out, carousel, open shelf, glass front or plain shelving.
  • Appliance schedule with cut-out sizes; worktop material and thickness.
  • Sink, tap, waste, gas and electrical positions relative to the corner.
  • Door style, panel material, colour code and hardware preference.
  • Floor finish heights and any level changes at the corner.
  • Quantities, repetition across units, site access and delivery address.
  • Required delivery date and installation responsibility.

Not sure which corner fitting suits your plan? Send the drawings and appliance schedule and we will come back with a layout proposal, internal fitting options and an itemised quotation — including alternatives if a carousel or lazy Susan does not clear the waste or tap.

Frequently Asked Questions

Can you quote from a photo of my existing kitchen?

We can give an indicative range, but not a firm price. A photo does not reveal wall angle, floor level, service positions or the internal fitting you want. Once we have dimensions and elevations, the quotation becomes fixed.

Do I need to measure the corner myself?

Send whatever measurements you already have — a sketch with numbers is enough to start. For repeat unit types on larger projects, we recommend a measurement check after first fix so tolerances are captured before panels are cut.

Are corner cabinets supplied assembled or flat packed?

Both are possible, and the choice depends on site access and how the units travel. Flat packing reduces volume and damage risk on long shipments; assembled carcasses speed up installation. Tell us the access conditions and we will recommend the packing method.

Can you match an existing colour in a renovation?

Yes, subject to a physical sample or a recognised colour code. Veneers and metallic lacquers need a sample for accurate matching; solid colours can usually be matched from a RAL reference.

SANTERSON — China-based manufacturer and one-stop supplier of furniture, interior fixtures and building materials for villa, hospitality and office projects. Send your drawings, appliance schedule and finish schedule for an itemised quotation on made-to-measure corner kitchen cabinets.

Corner Kitchen Cabinets · Contact Us