A paneled hinged wardrobe looks simple on a drawing. A frame, a set of stiles and rails, a field panel inside each door, and hinges down one side. The trouble is that two projects can ask for the same door style and end up needing completely different construction, hardware and internal layouts. What decides the outcome is not the look of the panel; it is the project information you hand to the factory before the first cut.

Below are the project details that genuinely change what gets made, in the order they usually arrive on a job.

1. The opening itself, not the nominal room size

Wardrobe height is set by floor-to-ceiling level, and floors are rarely level across a full wall run. Before anything else, confirm finished floor levels, finished ceiling levels, and where the plaster line actually sits at each end of the run. Any variation along the wall will show as a visible gap between the crown of the wardrobe and the ceiling unless the design allows for a scribe, an adjustable pelmet or a shadow gap.

Also record what is in the way: skirting boards, architraves, light switches, thermostat plates, downlights near the ceiling line, air-conditioning grilles, and any structural column. Hinged doors need clear swing space, so a switch placed on the return where a door will open becomes a site problem if nobody caught it on the drawing.

2. Built-in or freestanding

This choice changes carcass construction more than most buyers expect. A built-in unit can be sized to the opening and fixed in place, with sides finished only where they will be seen. A freestanding piece is manufactured as a complete object, finished on all visible faces, and moved into position. Our Paneled Hinged Wardrobes are made to measure for residential wardrobe projects. The same door language can be resolved either way, but you need to say which one you want at quotation stage, because it is not a cheap change afterwards.

3. Door count, door width and the hinge load behind them

Paneled doors are heavier than flat slab doors of the same size, because a framed door carries a field panel inside a stile-and-rail assembly. That weight is carried entirely by the hinges. So before choosing finishes, settle:

  • the number of doors in the run, and the width of each;
  • whether any door is taller than the standard range because the design calls for a full-height panel with no mid-rail;
  • how many hinges each door needs, and whether concealed or cup hinges are specified;
  • whether soft-close hardware is required on every door or only on high-use positions.

A wide, tall paneled door in a guest bedroom behaves differently from the same door opened many times a day in a main family bathroom or dressing room. Tell the factory the usage pattern; it drives hinge grade and hardware choice far more than the aesthetic.

4. Which panel profile you are actually specifying

"Paneled" covers several distinct door constructions, and each one has different edges, mouldings and finishing requirements. On our site these sit under the Classic Paneled Wardrobes grouping, including Raised Panel Wardrobes, Recessed Panel Wardrobes and the shaker panel wardrobe. They read similarly in a photograph but they are not interchangeable on a schedule.

Door styleWhat to confirm before ordering
Raised panelMoulding profile and its scale relative to door width; a moulding that reads correctly on a narrow door can look heavy on a wide one.
Recessed panelDepth of the recess and how the shadow line is expected to read under the room's lighting.
ShakerRail and stile widths, and whether they match the architraves or kitchen framing already on the job.
Arched paneledArch radius, and whether the arch is cut from one piece of moulding or assembled - this affects both lead time and cost.
Glass-paneled combinationGlass type, glazing bead detail and whether the glazed sections need internal stops for safety in a family setting.

If the specification simply says "paneled door, to match existing", ask for a physical sample of the profile. Matching by photograph is where most disputes start.

5. Material and finish, stated as a system rather than a colour name

Paneled doors are made up of two or three different substrates meeting each other - frame and field panel - and each takes a finish slightly differently. State the substrate, the surface material and the finishing process together, and state them per component where they differ. Our wardrobe range is offered across solid timber, wood veneer, lacquer, melamine and acrylic surfaces, so the same panel profile can be produced at quite different price points with quite different performance.

Then specify the practical items that are easy to leave out: sheen level, whether the interior of the carcass is finished or left raw, edge treatment on any visible end grain, and whether the finish is expected to tolerate cleaning agents used by housekeeping on a managed property.

6. The internal layout that the doors are hiding

Doors get all the attention; interiors decide whether the wardrobe works. Settle hanging heights before carcass panels are cut, because rail positions cannot be moved far once drilled. Then record:

  • the split between long-hang, short-hang and shelf storage;
  • drawer count and whether drawers are pull-out on runners or fixed shelves with fronts only;
  • whether a mirror is applied to any door - mirrored hinged doors add weight that feeds straight back into the hinge decision above;
  • lighting: whether interior lights are required, where transformers sit, and how cables are routed through the carcass;
  • any laundry or linen function folded into the same joinery run.

7. Consistency across the rest of the joinery package

A wardrobe door rarely stands alone. In a villa or apartment fit-out, the same panel profile and finish usually reappear on doors, wall panelling, vanities and kitchen cabinetry. Ordering those from one manufacturer keeps batch, grain direction and sheen consistent; ordering them separately is where colour matches start to fail. If your wardrobe must match Classic Panel Hinged Doors or the panelling in the same room, say so at the outset and let the factory schedule them together.

8. Delivery route, handling and site sequence

Full-height paneled doors are long, heavy and awkward through stairwells and lifts. Confirm the access path from the delivery point to the room - lift car dimensions, stair turns, corridor widths - before deciding whether a door arrives as one piece or is assembled on site. Then confirm where the wardrobes sit in the programme relative to wet trades: plaster, paint and flooring should be complete and dry, otherwise carcass panels sit in damp and take up moisture before handover.

Before you place the order: send the finished levels and opening dimensions, the door style with a physical profile sample reference, the substrate and finish stated per component, the internal layout with hanging heights, the hardware grade, the access route to the room, and the joinery items the wardrobe has to match. Those eight inputs are what determine whether the installed result looks like the drawing.

SANTERSON manufactures made-to-measure wardrobes alongside cabinetry, doors, panelling and interior fixtures for villa, hotel and apartment projects, with custom/OEM production and door-to-door delivery. If you have a set of drawings, send them over and we will price the joinery as one package rather than as separate line items.