A media wall with built-in lighting is one of the easiest project items to get wrong on the delivery side. The joinery arrives in one shipment, but the LED driver, the low-voltage cable run and the recess for the screen each belong to a different trade and a different stage of the site programme. This guide walks through how a project order for Santerson Integrated LED Media Units moves from specification to handover, and what you should settle before the units are put into production.
Why media units with integrated lighting need a separate delivery plan
Our TV cabinets and media units in this range are configurable: finish, layout and dimensions are set to suit each room, and the LED lighting is part of the carcass rather than an accessory added on site. That single fact drives everything downstream. A plain cabinet can be crated, shipped and installed with very little forward planning. A lit media unit has electrical components that must reach the wall before the joinery closes it in, and a screen niche whose dimensions are fixed by the millwork cannot absorb a late change of display.
The second factor is quantity pattern. A villa order might cover four or five units in different sizes; an apartment or hospitality order repeats one or two layouts across many rooms with small variations in width and reveal. Repeating layouts travel well in containers, but each variation needs its own shop drawing sign-off, so the approval cycle — not the production line — is usually what sets your delivery date.
Before you place the order: lock these six items
Most international delays on custom joinery trace back to specification gaps, not freight problems. Confirm the following with your supplier and your site team before anything goes into production.
- Room-by-room schedule. Unit width, height, depth, finish code, door or drawer configuration, and which rooms repeat a layout. Number every unit so it matches the room numbers on your drawings.
- Screen and device schedule. Display size, mounting method, cable entry position and any media components that sit inside the carcass. The niche is built around these dimensions.
- Electrical interface. Driver location, accessible point for maintenance, low-voltage versus mains feed, switching arrangement and local supply voltage. Confirm lighting and electrical details for the selected design before production.
- Wall condition and fixing method. Stud, block or framed substrate, plus any packing or reinforcement the installer must provide. This belongs to your site contractor, not to the crated joinery.
- Finish sample approval. Veneer, lacquer and laminate tones read differently under LED strips than under showroom light. Approve a physical sample against the lighting you intend to use.
- Packaging standard for your route. Long panels and glass-fronted elements need different crating on a long sea leg than on a short one; agree this at quotation stage.
Choosing a shipping mode and Incoterms that fit joinery
Configurable media units are made to order, so the shipment has to arrive when the site is ready for it — not as early as possible. For full container quantities we arrange freight forwarding by sea, air and rail; small top-up orders or urgent replacements may justify a faster mode. Air freight for bulky carcass panels is rarely economical, but it can save a project when a handful of units are holding the handover date.
| Decision | What to settle at quotation stage |
|---|---|
| Consolidation | Whether media units travel with other built-in furniture from the same order, or separately to match the installation sequence on site. |
| Incoterms | Where risk transfers and who handles import clearance. Door-to-door delivery means we manage freight and documentation to your site; confirm the exact scope for your country in writing. |
| Delivery address | Direct to site or to a bonded warehouse / staging point. Sites with no storage often need staged deliveries rather than one drop. |
| Documents | Commercial invoice, packing list and certificate of origin, plus any import permit your country requires for timber-based products. Ask early; permits take longer than the freight itself. |
| Cargo insurance | Who insures the consignment and to what value. Agree this before loading, not after damage is found. |
Our logistics and door-to-door delivery service covers customs paperwork, packaging and container loading, shipment tracking and delivery to the agreed address. Import duties, local taxes and site-side handling remain your side of the arrangement unless quoted otherwise — check those numbers against your landed-cost model rather than assuming a delivered price is final.
Sequencing the delivery with the site programme
Work backwards from handover. Lit media units sit at the point where first fix, finishes and fit-out meet, so the arrival date should land after the wall set-out is complete but before floor protection, painting and final cleaning are finished.
- First-fix electrical complete: cable runs, back boxes, driver position confirmed on site.
- Wall finishes complete to the level the unit will sit against, including any packing the installer specified.
- Floor protection laid; ceiling and adjacent trades finished so the unit is not damaged by later work.
- Container arrival and on-site inspection logged, with damage photographed against the packing list on the day of unloading.
- Installation, then a joint check of lighting function and screen fit before snag sign-off.
If your site cannot guarantee that sequence, split the delivery: carcasses when the walls are closed in, glass-fronted elements and hardware later. Tell us at production stage — splitting crates is cheap to plan and expensive to retrofit.
Receiving, installing and closing out
Inspection on arrival is where most claims are won or lost. Check crate counts against the packing list before signing, open a representative sample of crates, and record any transit damage with dated photographs. Then check each unit against its room number and shop drawing: reveal sizes, door swing direction, hinge type, cable cut-outs and driver access panel.
Installation should end with an electrical function test on every lit unit — drivers, switches and dimming where fitted — because that is the part a site crew tends to assume is working. We provide installation and after-sales support, including inspection and snags, spare parts and replacement, and ongoing maintenance. Warranty terms, response times and what counts as site damage versus manufacturing defect vary by project, so get the applicable terms for your order in writing rather than relying on general marketing claims.
Keep a signed close-out file: approved shop drawings, finish sample sign-off, packing list with inspection notes, and the electrical test record. When a replacement panel or driver is needed two years later, that file is what makes the request fast.
Ordering as part of a wider fit-out
Media units rarely stand alone. Where they sit against panelled walls or continue into storage, the surrounding work has to come from the same shop drawings and the same batch of finish samples. We supply furniture and building materials under one project order, so carcasses, wall panelling, doors and matching storage can be produced together and coordinated through one production schedule. Our custom and OEM service also covers bespoke finishes and brand-specific detailing where a design calls for it.
The practical benefit is fewer interfaces to manage: one set of dimensions, one finish approval, one delivery window and one point of contact from production through handover. For projects that need more than joinery — interior fixtures, lighting or flooring in the same rooms — grouping them on a single order reduces the number of separate consignments competing for the same site access.
A short checklist before you commit
- All six specification items closed, with shop drawings signed by the design team and the site contractor.
- Electrical interface fixed on paper: driver location, feed type, switching, local voltage.
- Incoterms, insurance and import requirements confirmed for the destination country.
- Delivery sequence agreed against the site programme, with staged crates if the site has no storage.
- Inspection protocol agreed, including who photographs damage and within what window claims are raised.
- Close-out documents named in advance so nothing is chased after handover.
Send us your room schedule, screen schedule and drawings for the media wall, and we will confirm production timing, packaging and the delivery options that fit your site — including whether the units should travel with the rest of the joinery or arrive separately to suit the installation sequence.