A glass corner wardrobe rarely fails on looks. It fails on the paperwork behind it: a room measured on one drawing and built to another, a run of wardrobes ordered as one lot when three rooms need three different heights, or a glazed door specified after the frame and hardware have already been produced. For villa and apartment packages, quantity planning and product coordination are the two decisions that decide whether the joinery arrives as a complete set or as a problem for the site team.

This guide walks through both, using the corner wardrobe family as the worked example — Glass Corner Wardrobes, L Shaped Corner Wardrobes, U Shaped Corner Wardrobes and Sliding Door Corner Wardrobes — so you can see how a line item should read before it goes into an order.

Start With Rooms, Not With a Wardrobe Count

Counting wardrobes is the most common shortcut in a bill of quantities. Two bedrooms can each have "one corner wardrobe" and still need completely different production files: one is a straight run that turns into a return at an internal corner, the other sits between two doors with a glazed front on one leg only. The count matches; the manufacturing does not.

Break the schedule down to room level first, then record for each room:

  • The layout type — L-shaped return, U-shaped alcove, single-leg corner with an end panel, or a corner unit paired with a separate straight run.
  • Clear opening dimensions — width on each leg, floor-to-ceiling height at the highest and lowest point, plus any skirting, cornice, beam or service run that cuts into the envelope.
  • Circulation clearance — how far a door can swing or slide before it hits a bed, an en-suite threshold or an opposite wall. This is what pushes a project from hinged to sliding fronts.
  • Interior configuration — hanging heights, drawer banks, shelving, lighting provisions and any dedicated zone such as a dressing area.

SANTERSON corner wardrobes are made-to-measure: sizing, material, finish and layout are specified per project rather than chosen from fixed modules. That flexibility is the reason the quantity sheet has to carry layout detail instead of a single line with a number in the quantity column.

Before any quantity is locked, confirm the finished floor level and the finished ceiling level for each room. A corner wardrobe ordered against structural dimensions arrives either short of the ceiling or standing on top of a floor that has not yet been laid.

A Quantity Sheet That Production Can Actually Read

Once every room is defined, group the items by what has to be produced together. For a multi-bedroom villa package, this usually means one line per wardrobe set, not one line per component and not one line per room type.

Schedule fieldWhat to recordWhy it matters for production
Room referenceLevel, room name, drawing number and revision dateFixes which version of the drawing the factory is building from
Layout typeGlass, hinged-door, sliding-door or open corner configuration; L-shape or U-shape returnDetermines carcass parts, corner posts, top panels and door sets
Set quantityNumber of complete sets per room, never a total for the whole floorPrevents mixed components arriving from different production batches
Leg dimensionsWidth and depth of each leg, overall height, corner junction detailCorners are cut and joined to drawing; approximate figures cannot be corrected later
Front type and finishGlass type (clear, bronze, smoked, frosted, ribbed), frame colour, lacquer or veneer finishGlass and board finishes are ordered on separate lead times
HardwareHinges, slides, handles, soft-close provisions, mirror panelsAvoids the classic case where doors arrive without matching ironmongery
Interior kitShelves, drawers, hanging rails, integrated lighting per setMakes sure accessories are packed with the right set on site
Pack and sequencePacking mark, delivery sequence, storage location on siteLets the installation team unpack room by room instead of sorting a mixed container

Where the same design repeats across several rooms, still list each set separately with its own dimensions. Repeat designs are not repeat sizes: a mirrored bedroom plan can carry 50 mm of difference in one leg because of a wall build-up, and that difference lands exactly on the corner joint.

Coordinating Glass, Frames and Doors as One Package

A glazed corner wardrobe is really three product decisions made at once: the front glazing, the frame system, and the door mechanism. Ordering them independently is where coordination breaks down.

1. Front glazing

Glass fronts change how a room reads more than any other wardrobe choice. Clear and Clear Glass Wardrobes keep a compact bedroom open, while bronze and smoked tints reduce reflectivity in rooms with strong daylight, and frosted or ribbed glass hides the contents without closing the wall down. If one floor uses more than one tint, note the tint per room on the schedule — glazing is not interchangeable between sets once it has been cut to size.

2. Frame system

Where a slim aluminium profile is part of the design, Minimalist Black Frame Wardrobes and other framed glass options sit in a different frame family from full-height panel doors. Frame profile, colour and glass thickness have to be confirmed together, because the rebate that holds the glass is defined by the profile.

3. Door mechanism

Hinged fronts need clearance for the swing; sliding fronts need track depth and a wall run long enough to accept the panel. In a corner, that decision also affects the internal layout: a hinged corner unit exposes the apex easily, while a sliding front needs the apex kept accessible with a carousel, pull-out or shallow shelving. Choose the mechanism before finalising interior fittings, not after.

For projects where glazed fronts appear in more than one wardrobe type on the same floor — corner units in bedrooms, Glass Sliding Door Wardrobes in a hallway, Glass Walk in Wardrobes in a dressing room — specify all of them from one finish schedule. Matching tints, frame colours and handles across the three types is what makes the joinery read as a designed set rather than separate purchases.

Lead-Time Groups: Order by Production Family, Not by Room

Rooms are how the site team thinks; production families are how the factory works. Boards and panels, cut glass, framed door sets, ironmongery and integrated lighting each follow their own supply path, so a single "wardrobes" line on a purchase order hides four different readiness dates.

  • Carcass boards and panels — the base item; confirm board material, edge treatment and finish code per set.
  • Glass fronts — measured to the frame system, so they follow after the frame decision is frozen.
  • Framed door sets and tracks — profile, colour and hardware are specified as one assembly.
  • Interior kits and lighting — shelves, drawer banks, rails and lighting provisions; confirm power points and switching before the carcass closes.
  • Packing and shipping marks — assigned per room so sets are not mixed in a shared container.

For projects ordering through a custom and OEM service, this grouping is also where prototypes and finish samples are requested. A single glazed door sample, built to the chosen profile and tint, settles appearance questions far more reliably than a catalogue image.

The Coordination Checklist Before Order Confirmation

  • Drawings used for the quantity sheet are marked with a revision number and date, and the same revision is what production receives.
  • Finished floor and ceiling levels are confirmed per room, including any screed or tiling build-up.
  • Every set carries its own leg dimensions; no line reads "as typical".
  • Glass type, frame colour and handle style appear in one finish schedule covering all wardrobe types on the project.
  • Door mechanism and internal configuration are agreed together, with circulation clearance checked against the furniture layout.
  • Integrated lighting has a defined power position and switching arrangement.
  • Packing marks match room references used by the site team.
  • Delivery sequence matches the installation programme, so completed rooms can be fitted as they are released.

How One-Stop Procurement Reduces Coordination Work

Wardrobes rarely sit alone in a project package. The same bedrooms usually need interior fixtures, vanity units, lighting and flooring specified at the same time, and every one of those items carries its own finish decision that has to agree with the joinery. When wardrobe fronts, wall finishes and floor tones are ordered through separate suppliers, matching them becomes a site-level problem.

SANTERSON works as a furniture and building materials manufacturer covering built-in furniture together with the surrounding finishes and fixtures. The one-stop solution path runs from design consultation and space planning through material selection, manufacturing and project coordination to installation handover. For buyers, that means one party holds the wardrobe dimensions, the finish schedule and the packing marks, which is exactly what a quantity plan needs to stay valid from order to installation.

Freight and delivery are part of the same plan. The logistics and door-to-door delivery service covers freight forwarding, customs documentation, packaging and container loading, so the packing marks defined on the quantity sheet carry through to the container. The installation and after-sales support stage then covers on-site fitting and inspection, which is where a well-built schedule proves itself: each set opens in the room it was made for.

Frequently Asked Questions

Should corner wardrobes be measured before or after the floor is laid?

After the finished floor level is fixed, or with the build-up clearly documented on the drawing. Corner units span two walls and sit on a single plane, so an unrecorded floor height becomes a gap at the ceiling or an obstruction at the threshold.

Can one corner wardrobe design be repeated across several rooms?

Yes, provided each set is dimensioned individually. Repeating the design standardises finishes and hardware, which simplifies the order; repeating the dimensions without checking each opening is what causes on-site rework.

How do I keep glass fronts consistent across different wardrobe types?

Publish one finish schedule for the project listing glass tint, frame profile and colour, and handle model, then reference it from every wardrobe line — corner, sliding, hinged and walk-in. Confirm the schedule with a physical sample before production is released.

What is the practical difference between an L-shaped and a U-shaped corner unit?

An L-shaped unit turns one internal corner and closes with an end panel, while a U-shaped unit fills an alcove on two returns and gains depth at the apex. The choice follows the room geometry and how much circulation space is left for doors.

Plan the Numbers First, Then Release Production

Quantities and coordination are settled long before the first panel is cut: rooms defined individually, dimensions recorded per set, glass and frames specified as one package, and a finish schedule that covers every wardrobe type on the project. If you are assembling a villa or apartment package and need made-to-measure corner wardrobes planned alongside the rest of the fit-out, send your drawings and room schedule to the project procurement team to review specifications and configuration options.