Open modular wardrobes look simple on a drawing: carcasses, shelves, hanging rails, no doors. That simplicity is exactly why the finish carries so much of the result. With nothing hiding the interior, every edge band, shelf front and cabinet side sits in view. Before an order goes into production, buyers should lock down the finish details below, because changes after panels are cut are costly and rarely clean.

1. Confirm Which Surfaces Are Finished

The first question is not which colour, but which faces receive that colour. Ask the factory to state, in writing, whether the finish applies to:

  • exterior cabinet sides and returns visible from the room;
  • interior carcass panels, shelf fronts and back panels;
  • top edges, plinths and any scribe or filler panels that close gaps to the wall or ceiling.

In a built-in installation against a wall, an unfinished return is invisible; in a freestanding open wardrobe run, both sides face the bedroom and must match. Specify finished faces per elevation rather than assuming "all over".

2. Match The Material To How The Piece Will Be Used

Open wardrobes take more handling than closed ones — hands, hangers and bags touch shelf edges and side panels every day. For family bedrooms and rental villas, a matte finish melamine wardrobe panel avoids fingerprints and is straightforward to wipe down. Where the design calls for real wood grain at close range, a wood veneer wardrobe in walnut or oak gives a natural surface that laminates imitate less convincingly up close. Ask which material is specified for each part; a single run often mixes a premium door-less front with standard carcass board, and that mix should be deliberate, not an accident of quoting.

3. Nail Down Edge Banding And Joint Lines

Edge banding is the detail buyers most often forget to specify. Confirm the banding thickness, the colour match, and whether joints are butt or mitred at outside corners. A visible seam on a shelf front reads cheap from two metres away; a mitred edge with matched banding reads as joinery. Ask for the actual banding sample against the panel sample, viewed together under site lighting.

4. Check Sheen And Colour Under Real Light

The same board looks different in a spotlit showroom and under a bedroom's warm ceiling fitting. Decide on sheen level — matte, satin or gloss — and check the sample at the installation, both day and night. For veneer, confirm whether the surface is clear, smoked or tinted, since two "walnut" samples from different batches can sit half a shade apart once lit.

5. Specify Hardware That Suits An Open Layout

With no doors, the hardware is part of the look. Confirm the finish and load rating for hanging rails, drawer runners, shelf pins and any integrated lighting, and check that these components are included in the quotation rather than treated as site-supplied extras.

6. Get A Physical Approval Sample Before Production

The practical control is a sample set: one panel of each specified material, its edge banding attached, plus the rail and runner hardware. Approving that set against the drawings removes most arguments at handover. At SANTERSON, wardrobe carcasses, layouts and finishes are made to measure for each project, so the approved sample becomes the reference for the whole production run.

A Short Pre-Production Checklist

  • Finished faces marked on every elevation drawing;
  • material named per component, not "as shown";
  • edge banding thickness, colour and joint method recorded;
  • sheen and colour checked under site lighting;
  • hardware finishes, ratings and inclusion confirmed in writing;
  • physical sample approved before cutting starts.

Send us your room elevations and the finish direction you are working to. We will confirm material options, edge details and made-to-measure sizing for your open modular wardrobe run, with a physical sample set for approval before production begins.