A high gloss lacquer wardrobe is one of the few fitted items in a bedroom that everyone sees, touches and uses every day. It is also made to measure, finished by hand-lacquering, and usually delivered overseas as part of a wider fit-out. That combination is why enquiries often stall: the supplier receives a photo and a colour name, but no dimensions, no layout intent, no substrate or hardware preference, and no delivery address. The result is a quotation that cannot be compared with anyone else's.

If you are sourcing high gloss lacquer wardrobes for a villa, apartment or hospitality room package, the following preparation turns a first enquiry into an accurate quotation — and lets you compare suppliers on the same basis.

1. Room dimensions, taken the way a manufacturer needs them

Made-to-measure cabinetry is only as good as the survey. Before you write to a supplier, collect:

  • Wall length and depth at three points along each run — floors and ceilings in older buildings are rarely square or level.
  • Floor-to-ceiling height, plus the exact position of skirting boards, cornices and architraves that the carcass has to scribe around.
  • Positions and depths of power outlets, switches, downlights, air-conditioning grilles and return-air vents.
  • Door swings, window reveals, radiators and anything else that limits how far a door can open.
  • Floor finish build-up — the height of the flooring that will be laid after the wardrobe is installed, because it changes the carcass base detail.

Send photographs from both ends of the room and a simple hand-drawn sketch with measurements. A CAD file is welcome but not required; clear photos plus dimensions are usually enough to start a layout discussion.

2. Door type and internal layout, decided before you ask for a price

Door choice drives both cost and clearance. Hinged doors need a clear swing; sliding doors save floor space but reduce access to the corner of the opening; a walk-in dressing room uses an entirely different module set. Decide which you want, or list two options and ask for both prices.

Then decide what goes inside. Hanging rails at two heights, drawers, pull-out baskets, a mirrored interior panel, lighting in the shelving, a shelf for luggage — each of these is quoted as a module, not included by default. The built-in furniture range covers hinged, sliding, corner and walk-in configurations, so an internal layout can be specified rather than accepted off the shelf.

3. Finish specification: colour, sheen and how it will be verified

"High gloss" is not a specification. Specify the colour reference you want — RAL, Pantone or a sample board number — and state whether adjacent joinery (vanity units, wall panelling, high gloss lacquer cabinets in the same apartment) must match it exactly. Matching lacquer across different product lines is a coordination task, and it is far easier to handle when the supplier knows from the first enquiry that the whole interior uses one finish family.

Ask two practical questions at this stage:

  • Can you supply a finished sample panel in the selected colour and sheen before production?
  • Which substrate and lacquer system are being quoted, and what edge treatment is included on visible edges?

A sample panel costs little and prevents the single most expensive dispute in gloss joinery: a colour that reads correctly under shop lighting but not under bedroom downlights.

4. Quantities, project schedule and delivery address

State the number of wardrobes, whether they repeat across units or floors, and your target installation month. Repeat modules are where a factory's tooling and batching pay off; single one-off pieces are quoted differently. Give the delivery address and preferred Incoterms — door-to-door, port of destination, or site delivery — because packing specification and container loading plan follow from that choice.

If the wardrobe is part of a larger package, say so. Suppliers who also produce interior fixtures can consolidate bathroom vanities, doors, panelling and storage walls into one shipment and one coordination contact, which removes the interface problems between separate trades.

5. What to ask the supplier for in writing

A quotation you can compare should contain:

  • A dimensioned elevation drawing per wardrobe, showing door split, handles and internal modules.
  • The material build-up: substrate, lacquer system, edge treatment, back panel, and hardware brand or specification.
  • Unit price, packing details, freight option and the point at which responsibility transfers.
  • Production lead time measured from confirmed drawings and approved sample, not from enquiry date.
  • What is covered after delivery — spare hinges and handles, replacement panels, installation guidance on site.

SANTERSON's stated cooperation steps follow that order: project brief and design proposal, then quotation and detail confirmation, then production, shipment and follow-up. Enquiries that arrive with the measurements, layout intent, finish reference and quantities already listed move through those steps quickly.

A short checklist before you press send

  • Measured dimensions at three points, plus heights and obstructions
  • Photos of the room from both ends, and a sketch with numbers
  • Door type decided, or two options listed for comparison
  • Internal layout written out module by module
  • Colour reference stated, sample panel requested
  • Quantities, target installation date and delivery address included

Bring those six items to your first conversation and the quotation you receive will be a real one — comparable, buildable, and free of the assumptions that cause change orders after production has started.