On a bathroom schedule a wall-mounted sink is one of the smallest line items, and it still turns up on site-instruction sheets more often than anyone expects. If you are specifying the Wall Hung Ceramic Basin 1003B for a villa bathroom or a run of hotel rooms, these are the points worth closing out before your order goes into production.

1. How the basin is supported, and what the wall has to do about it

Basins in this family are fixed to the wall through their back panel rather than resting on a cabinet or a pedestal. That is what frees up the floor and gives the room its light, open look, but it also means the wall behind the basin becomes a structural item, not a finish item.

Before production starts, confirm with your structural or MEP team:

  • the substrate behind the fixing zone — solid masonry, or a framed partition that needs noggins, steel backing or a reinforcement frame;
  • the position and depth of the fixing points on the back panel, so blocking is set at the right height before the wall is closed up;
  • the finished wall build-up (waterproofing, adhesive, tile thickness), because every layer moves the completed face and therefore the anchor length.

Agreeing these three at design stage avoids the most common site problem: tiles already laid, brackets on site, and no adequate fixing substrate behind them.

2. Drainage and water supply set-out

A wall-hung basin needs the waste and the supply lines inside the wall, so their positions have to be locked before first fix. Two details decide whether the unit fits cleanly:

  • Trap type and rough-in. Wall-hung sanitaryware is made for particular trap arrangements — wall waste versus floor waste, with a set distance from the finished surface. Check the trap type the basin requires against what your drainage design actually provides.
  • Faucet mounting. The 1003B has a tap mounting area for a single faucet. Settle deck-mounted versus wall-mounted early, because it changes where the supply outlets sit and whether they land behind or beside the basin.

Ask for the dimensioned technical drawing for the exact model and revision you are ordering, then mark it up against your set-out drawings. The measurements on a catalogue image and those on a production sheet are not always the same.

3. Matching the basin to the rest of the suite

Wall-hung pieces read as a set only when the shapes and surfaces line up. The 1003B has a tapered, curved outline in a glossy glaze, and it is designed to sit alongside matching wall-hung sanitaryware — for example the Wall Hung Toilet 1038W or the Wall Hung Bidet 1004F.

When you specify a suite, put every item on one sheet: model numbers, glaze colour and finish name, and the mounting height intended for each. That single drawing is what lets us produce the set consistently across all rooms, and it is what your site team works from.

4. Ceramic quality points to write into the specification

The 1003B is made from vitreous ceramic with a dense, glossy glaze that resists staining, limescale and yellowing, which is why this type of basin holds up well in busy hotel and commercial washrooms. When you write the spec, state:

  • the body material and glaze requirement, so substitutions cannot be slipped in at production;
  • the colour and finish to be matched across the whole order;
  • what counts as acceptable surface quality, agreed before the first batch leaves the factory.

Agreeing these in writing at order stage is far cheaper than arguing about them after the containers arrive.

5. Making it a custom order rather than a catalogue purchase

Custom work on a basin usually sits in three places, and each one needs confirming before a mould or a first article is committed:

  • Finish and colour. Glaze colour and surface finish to be matched across basins, toilets and bidets in the same order, with a named reference rather than a photograph.
  • Mounting arrangement. Fixing centres and back-panel detail adjusted where the wall build-up or set-out is unusual on your project.
  • Branding and marking. Where the order carries private-label or project marking, agree the method and position on drawings before production.

Our Custom & OEM Service covers bespoke finishes and materials as well as OEM manufacturing, so the bathroom suite can be built to your specification instead of being forced into whatever a catalogue happens to stock.

6. Quantities, spares and the packing list

  • Quantity per room type. Confirm the count against the room schedule, not the concept render — bathroom layouts change late in a project.
  • Spare units. On a multi-room project, order spares with the main consignment. Reordering one or two basins later means matching glaze and finish across separate production runs.
  • Packaging and handling. Ceramics need proper crating and clear carton marks by room or floor, which speeds unloading and cuts breakages on site.

7. What we confirm before production begins

For custom and OEM orders we follow a short, fixed sequence: your brief and drawings, a quotation with the details confirmed, then production, shipment and follow-up. For a wall-hung basin order that means the technical drawing, the glaze and colour, the trap and faucet arrangement, and the packing method are all signed off before the first piece is made.

Because SANTERSON supplies sanitaryware alongside furniture, lighting, cabinetry and finishes, bathroom fixtures can be coordinated with the rest of the fit-out rather than bought as an isolated line item. The full range is on our Bathroom Sanitary Fixtures pages.

Pre-production checklist

  • Wall substrate and reinforcement confirmed at the fixing height
  • Finished wall build-up measured, anchor lengths set accordingly
  • Waste trap type and rough-in matched to the drainage design
  • Faucet mounting decision fixed, supply outlets positioned to suit
  • Matching toilet and bidet models selected for a consistent suite
  • Glaze colour, finish and quality standard agreed in writing
  • Custom items — finish, mounting detail, marking — approved on drawings
  • Room quantities plus spares confirmed; packing marked by room or floor

Dimensions, trap type and rough-in distances vary by model and revision. Confirm them against the current technical sheet for the exact unit you are ordering.