What a supplier needs to quote a bronze laser cut screen

A bronze stainless steel laser cut screen looks simple on a mood board and complicated on a purchase order. Most delays in getting one fabricated do not come from the laser cutter — they come from an enquiry that leaves too much open. This guide lists exactly what our fabrication team needs to price a Custom Bronze Stainless Steel Laser Cut Decorative Screen Partition, and what you can leave open if your design is still moving.

Why these screens are quoted case by case

A laser cut metal screen is not a stocked item in a fixed size. It is fabricated from sheet stock to one opening, one pattern and one finish, then assembled into panels that have to fit the wall they stand against. Two screens drawn from the same motif can carry very different prices depending on panel count, cut density, sheet thickness, frame detail and how far they are travelling. That is why we quote from drawings rather than publishing a price list: the honest answer to "how much does a bronze screen cost" is "send us the information below and we will tell you".

The good news is that nothing in this list is difficult to collect. A designer, contractor or project manager can usually assemble it in an afternoon from drawings already on file.

1. The opening: overall size, panel count and how the panels divide

Start with the space the screen has to occupy. We need:

  • Overall width and height of the screen area, in millimetres, taken from finished dimensions rather than structural ones.
  • The number of panels you want, and whether that number is fixed or open to our recommendation.
  • Panel widths — a wide feature wall in a lobby is normally built as several narrower panels, because panel count drives both fabrication and how the goods travel.
  • Total thickness or depth of the assembly, if the screen has to sit inside a reveal, between jambs, or return around a corner.

If you only know the wall length, say so. We can propose a panel division that suits the pattern repeat and shipping, then send it back for your approval before pricing is locked.

2. The pattern: drawing, photo or reference image

Send whatever you have. Our fabrication team works from three kinds of input:

  • A vector drawing (AI, DXF, DWG or a PDF with editable artwork) — the fastest route, since it can go straight into nesting and cutting.
  • A CAD elevation with the pattern dimensioned — we redraw it for production and confirm with you before cutting.
  • A photograph or reference image of a screen you like — we adapt the motif to your panel sizes, and tell you where a direct copy is not feasible.

Two pattern details change the quotation more than anything else: cut density and whether the design is geometric or organic. A regular grid nests efficiently with little waste. A dense floral or figurative motif takes longer to cut, produces more scrap, and often needs a supporting frame to keep large panels rigid. Tell us if you want the pattern to align across panel joints — matching a repeat across four panels is straightforward, but it has to be planned before the panels are sized.

3. Material and finish

Our bronze screens are fabricated in stainless steel with an antique bronze surface treatment; we also produce gold mirror, brushed gold and matte black finishes for projects that specify them — see the Custom Gold Stainless Steel Laser Cut Decorative Screen Partition for a comparable panel built to a different finish. For an accurate quote we need:

  • Sheet thickness for the cut panel, or the environment the screen is going into if you want us to specify it.
  • The finish name or reference sample: antique bronze, brushed gold, matte black, mirror. Finish names differ between suppliers, so a photo or physical sample removes the guesswork.
  • Frame and edge detail — exposed frame, concealed edge, or a shadow gap into the wall.
  • Whether the back side is visible. A screen freestanding in a room needs a finished face both sides; a screen fixed against a wall does not.
We keep material grades, thickness options and finish systems as configurable specifications on our product pages rather than fixed numbers. Exact grade, coating system and any performance or fire rating you need for a specification should be confirmed with us in writing for your project, because those details depend on the application and destination market.

4. Installation condition

How the screen meets the building affects both the fabrication detail and the price:

ConditionWhat we need to know
Fixed to wall or floorSubstrate behind it — plasterboard, masonry, steel frame, tile — and whether fixings must be concealed.
Freestanding room dividerHeight, required stability, and whether feet or a base rail may be visible.
Ceiling-suspendedClear height, ceiling structure, and the client's tolerance for top fixings.
Set into a reveal or openingReveal depth, out-of-tolerance allowance, and who is setting out the opening.

Screens are frequently installed on site by the main contractor. If that is your plan, tell us — we will design the panel edges and fixing plates so a local crew can install them without special tooling. Our Furniture Installation and After-sales Support covers on-site installation, inspection and snags where the project scope calls for it.

5. Quantity, schedule and destination

A single screen and a hotel package covering several locations are run differently. Please include:

  • Quantity per location, plus any spares or future phases you want priced separately.
  • The date the screens must be on site — not the date you want to order.
  • Delivery address and Incoterms preference, so freight can be quoted with the goods instead of added later.
  • Access constraints at the destination: lift dimensions, stair width or crate-size limits for an upper-floor lobby. Oversize panels that cannot reach the room have to be split, which changes both fabrication and cost.

We arrange freight by sea, air and rail with customs paperwork and door-to-door delivery through our Furniture Logistics and Door-to-door Delivery service. Transit time, duties and import terms are quoted per project rather than assumed.

6. Budget range and who writes the specification

A budget band is optional but useful. With a target in mind we can adjust sheet thickness, pattern density and panel count to land inside it instead of quoting one solution that misses your number. Equally, tell us who is writing the specification: if you have an interior designer issuing drawings, we work to their detail; if you are a contractor sourcing directly, we can develop the pattern and fixing detail with you as a Custom Furniture Manufacturer, including design and prototyping plus finish samples before full production.

What happens after you send the enquiry

  • Review and clarification. We read the drawings, check the opening against the panel division, and come back with specific questions instead of a vague quotation.
  • Fabrication proposal. Panel sizes, pattern adaptation, material and finish, fixing method — confirmed before cutting starts.
  • Quotation. Priced against the confirmed detail, with freight shown separately or included according to your Incoterms preference.
  • Detail confirmation, then production. Approved drawings govern manufacture; changes after that point are quoted as variations.
  • Packing, shipping and site handover. Panel marking and packing arranged so the installation crew knows which panel goes where.

Because screens are made to order, changes requested after cutting has begun carry cost and time. Settling pattern, finish and dimensions before approval is the single biggest saving available on this line item.

Enquiry checklist — copy these items into your email

ItemYour answer
Project and locationHotel, villa, clubhouse or commercial fit-out; city and delivery address.
Screen location on siteLobby, reception, F&B area, lift lobby, guest room divider.
Overall width and heightFinished dimensions in mm.
Panel count and widthsFixed, or open to our proposal.
Pattern sourceVector file / CAD elevation / reference photo.
FinishAntique bronze, brushed gold, matte black — with sample or photo.
Material and thicknessSpecified, or to be recommended for this application.
Installation methodWall-fixed, freestanding, suspended, in a reveal.
Quantity and phasesNumber of panels/screens; future phases.
Required on-site dateDate the screens must be installed-ready.
Access limitsLift, stair or crate-size constraints.
Drawings attachedPlan, elevation, and pattern artwork.

Common questions we answer before quoting

Can you match a screen we saw on another project?

Usually the motif can be adapted, but we do not reproduce another supplier's panel as-is. What matters for your project is that the pattern reads correctly at your panel sizes and under your lighting — we adjust the repeat accordingly and send the adaptation for approval.

Can the screen be installed by our own crew?

Yes, and many projects do exactly that. Tell us early: concealed fixings and a designed edge detail make local installation straightforward, whereas leaving it undeveloped often forces a re-detail late in the job.

Can you supply screens together with other finishes for the same project?

Screens sit within our decorative profiles range alongside Wood Panel Partitions, Wall Panel Systems and Partition Sliding Systems. Grouping them in one enquiry lets us coordinate finishes, fixings and shipping across the whole partition package instead of reconciling several suppliers on site.

Send your drawings for a quotation

SANTERSON is a China-based furniture and building materials manufacturer supplying custom screens, partitions and interior fit-out products for hotel, villa and commercial projects. Send overall dimensions, panel preference, pattern artwork or reference photos, finish and required on-site date, and we will return a fabrication proposal and quotation. Contact PHILLIP on WhatsApp +86-13928214007 or email santerson@qq.com — the contact page states enquiries receive a response within 24 hours.