A swim spa is one of the few outdoor amenities that touches architecture, structure, services and landscape design at the same time. That is why it so often arrives late in a villa or resort package: the brief says "outdoor spa", the quotation comes back with a shell and a price, and nobody has yet agreed on power supply, filtration, access or handover. If you are preparing an enquiry for Outdoor Swim Spa WS-PC07A-T, the most efficient move is to write the specification so that designer, builder, electrical contractor and supplier are all quoting from the same sheet. The notes below follow the fields a procurement brief normally has to carry, using this model as the worked example.
Start with the envelope, not the jet count
The catalog lists WS-PC07A-T at 7000 × 3000 × 1470 mm. Treat those numbers as the starting point for a fit-out discussion rather than as an installed dimension, because the envelope drives everything downstream: deck openings and structural bearing, crane or forklift access routes, the perimeter clearance needed for maintenance and for steps, and the visual relationship with adjacent poolside furniture.
Before the brief goes out, confirm on drawing:
- The finished deck level relative to the spa rim, and whether the unit sits above ground, semi-recessed or fully recessed.
- A clear access path from the delivery point to the final position, including gate widths, overhead obstruction and slab loading.
- Service clearance at the equipment side, so pumps, filters and the control system stay reachable after the paving is laid.
- Waterproofing and drainage detail at the perimeter, coordinated with the landscape and civil packages.
Record what the catalog already fixes for this model
The specification listed for WS-PC07A-T gives a defined baseline, and putting it in the brief as stated prevents suppliers from quietly quoting a different build. The listed items are: one control system, one swim training system, one water pump, one filter pump, 56 jets in total, four LED lights, and a total power figure of 11.55 kW. The features shown on the product page are water jets, LED lighting, ozone and the swim training system.
Two details matter more than they look. First, this variant is listed alongside the standard WS-PC07A at the same catalog envelope but with different equipment counts — a different jet total, water-pump quantity and power figure — so state the exact model code in every document line, drawing title and packing list, not just "7 m swim spa". Second, the power figure is the number your electrical contractor designs against. Do not let it stay buried in a product PDF; move it into the services schedule with the supply arrangement, protection and isolation requirements called out.
List options as priced alternatives, never as assumptions
Catalog-listed options for this range include control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps. Each one changes both cost and site conditions: a heat pump changes the electrical load and sometimes the position of plant; insulation changes the shell build-up and what you can wrap around it; sand filtration needs its own location and drainage; steps change the deck edge detail.
Write these into the brief as two columns — "included in base quotation" and "priced alternative, to be confirmed" — and require suppliers to answer both. Availability and compatibility vary by model, so an option that exists on one swim spa in the range is not automatically available on WS-PC07A-T.
Put the electrical section in the brief early
The most common cause of a swim spa sitting uninstalled for months is an electrical scope gap. The product page shows 11.55 kW total power for this configuration, and it also flags that included equipment and electrical requirements should be confirmed for the selected configuration. So the brief should ask each bidder to state, in writing:
- Supply arrangement and phase requirements for the quoted configuration.
- Cable size, route and isolation location expected at handover.
- Which party supplies the dedicated circuit, the isolator and the protection device.
- Control-system interface: what the owner can set, and what needs a technician.
Getting those four answers before award is cheaper than resolving them on site with a backfilled trench already poured.
Specify the swim function as a use case
WS-PC07A-T is listed with a swim training system, which is what separates it from a pure spa. In the brief, describe how the space is meant to be used — lap training in the morning, hydrotherapy and family use in the evening, guest use in a boutique resort — because that determines jet layout preferences, water temperature targets, lighting scenes and the durability expected of finishes. Buyers who specify only "swim spa, 7 m" get a product; buyers who specify the daily routine get an amenity that actually gets used.
Coordinate it with the rest of the outdoor package
A swim spa rarely stands alone. Deck levels, sun loungers, shade structures and hardtop pergolas all compete for the same square metres, and finishes have to be specified together so timber, stone and cladding read as one design. Where a project needs several outdoor elements delivered on one programme, sourcing them through outdoor furniture for villas and resorts alongside the water feature keeps finishes, delivery windows and the after-sales contact in one place. If the space demands a non-standard footprint, the customizable shape outdoor spa range covers square, round, oval and curved configurations with an acrylic shell for gardens, terraces and leisure areas.
Close the brief with delivery and handover
State the logistics boundary explicitly: port of loading, delivery term, who handles customs clearance, and who is responsible for the final leg to site. Furniture logistics and door-to-door delivery covers sea, air and rail freight forwarding, packaging and container loading, shipment tracking and customs documentation; confirm the specific terms, insurance and transit arrangement for your own project rather than assuming a standard service level.
Then define handover: commissioning of pumps, filtration, ozone and lighting; a snag list taken with the supplier and installer present; spare-parts contact; and furniture installation and after-sales support for the outdoor area as a whole. Warranty terms, response times and exclusions should be read in the contract, not inferred from marketing copy.
Procurement brief checklist for WS-PC07A-T
- Exact model code on every line item and drawing title.
- Catalog envelope 7000 × 3000 × 1470 mm, plus installed clearances and access route.
- Baseline equipment as listed — control system, swim training system, water pump, filter pump, jet total, LED lights — with quantities confirmed by the bidder.
- Total power of 11.55 kW carried into the electrical services schedule.
- Options split into included and priced-alternative columns.
- Electrical scope boundary named party by party.
- Delivery term, customs responsibility and site leg defined.
- Commissioning, snagging and after-sales responsibilities written into the award.
Send us the model code, your site drawing and the intended daily use, and we will quote WS-PC07A-T with equipment included and options priced separately, so your brief and your quotation match line for line. Enquiries are handled through our contact page.