A wall-hung bidet looks simple on a drawing: one ceramic bowl, fixed to the wall, sitting beside the water closet. The quotation behind it is not simple. Whether the Wall Hung Bidet 1004F, Modern Ceramic Wall Mount Bidet for Bathroom arrives on site ready to install — or sits in a store room while somebody measures again — depends almost entirely on what you send the supplier in the first enquiry. The list below is the same information we work through on every bathroom package, whether the job is one villa bathroom or a guest-room repetition floor.

Start with the model and the series it belongs to

Name the product exactly as it appears in the catalogue. For this item that means model 1004F, the wall-hung ceramic bidet — not "a white wall-hung bidet, roughly square". The 1004 is a series rather than a single fixture: it also covers the Washdown One Piece Toilet 1004A, the Wall Hung Ceramic Basin 1004B and the Freestanding Ceramic Pedestal Basin 1004S. Quoting by series means glaze tone, edge profile and matching heights across the suite are settled in the factory instead of being improvised on site. If your design calls for the floor-standing option instead, send Floor Standing Bidet 1038F, Ceramic Bidet Basin for Bathroom Hygiene, which carries the body on a back support against the wall rather than on a concealed panel.

Send the drainage layout before anything else

Drainage is the most common cause of a returned sanitary order, and it is rarely visible in a rendering. For a wall-hung fixture you should tell the supplier:

  • Trap type and direction — whether the waste leaves through the wall or falls to the floor.
  • Rough-in dimension — the measured distance from the finished wall face to the centre of the waste outlet, on the drawing you are actually building from.
  • Finished wall build-up — the thickness of the concealed cistern wall or framed partition, including tile and adhesive, because it moves every fixing point.
  • Water supply positions — hot and cold centre distances, plus whether stop valves sit behind an access panel.
  • Load path — the framing or carrier frame the fixture will be fixed to. The 1004F is secured through its back panel, so the supplier needs to know what that panel is bearing against.
  • Existing set, if this is a replacement — send a photo of the current bidet and its waste connection. A wall-hung replacement onto old floor-standing pipework is a different order from a new build, and the fixings kit follows from it.

The catalogue lists the 1004F at 545×360×410mm and the matching 1004B basin at 510×420×380mm. Treat those as catalogue figures until the current technical sheet has been confirmed against your drawings — trap geometry, rough-in and standard claims are precisely the items that can change between a marketing page and a production sheet, and we would rather confirm them with you in writing than assume them.

Give quantities by room type, not just a total

"60 pieces" is not enough to price properly. A supplier needs the breakdown per room type: how many guest bathrooms take a full suite with bidet, how many en-suites take basin and WC only, and how many public washrooms skip the bidet entirely. That split changes the mix of spares, the carton count, and whether it is worth running one production batch for all room types or splitting it. For new-build and renovation projects we also ask which bathrooms are handed over to different trades at different stages, because that decides how the order is packed and sequenced.

Specify the finish and the glaze you expect

The 1004F is made from vitreous ceramic with a smooth glossy glaze, which is what resists staining and mineral deposits in daily use. Tell the supplier whether the whole project runs one white throughout, or whether guest floors and public areas use different tones — and send the reference if you have one. Glaze colour is matched batch by batch, so keeping tone consistent across rooms means ordering them together rather than reordering months later.

If the bidet has to sit in a tighter footprint, say so at quotation stage. The 1004F has a rounded square outline that avoids sharp corners, and pairing it with the Wall Hung Toilet 1038W, Rimless Ceramic Wall Mounted WC for Modern Bathroom or the Wall Hung Toilet 1051W, Modern Wall Mounted Ceramic WC for Bathroom keeps a compact wall line — but each of those WCs has its own trap geometry, so send the layout for both.

Decide what else is in the same package

A bidet almost never arrives alone on a project. The more of the wet rooms you put into one enquiry, the fewer specification conflicts you find during installation. Worth including:

State the delivery and installation arrangement

Tell us where the goods are going and who is receiving them. Our Logistics & Door-to-Door Delivery service covers freight by sea, air and rail, packaging and container loading, customs paperwork and tracking to site — so the delivery address, the receiving party and your preferred Incoterms all belong in the enquiry. If you want help on the ground afterwards, our Installation & After-sales Support covers on-site installation, inspection and snag lists, warranty handling, spare parts and ongoing maintenance; tell us which stages you are handling yourself so we quote the right level of support.

Also send your programme — the date the fixtures must be on site, not just the date they leave the factory. Sanitary ware is a late trade but an early decision: the rough-in has to be right before tiles go up, so the technical confirmation should happen well before the delivery window.

What we send back once you have given us that

With the model, drainage layout, room-by-room quantities, finish decision and delivery arrangement in hand, the quotation comes back with a confirmed technical sheet for the 1004F, an itemised price per room type, packing and container loading details, and a production schedule you can plan around. If something in your drawings is ambiguous — an unlabelled waste direction, a partition thickness still out of tender — we flag it at that point rather than after the moulds are set.

As a China-based one-stop furniture and building materials supplier, SANTERSON makes sanitary ware alongside vanities, lighting, wall and floor finishes and the rest of the interior package, so bathroom fixtures can be specified against the same drawings as the joinery instead of being coordinated between six separate vendors. Send us your layout and room schedule and we will price the 1004F against it.

Send your bathroom drawings for a quotation