A sliding panel TV wall looks simple on a render: two or three panels glide across a recess, the screen disappears, and the living room reads as a clean run of joinery. On site it is one of the least forgiving items in a fit-out. Track alignment, cable routes, ventilation behind the screen and panel reveal tolerances all have to be resolved before production starts, not after the panels arrive.

SANTERSON builds these systems as made-to-measure work under the Santerson Sliding Panel TV Systems listing, part of our Media & TV Walls collection. Because finish, layout and dimensions are specified per project rather than picked from a stock catalogue, the quality of your enquiry determines the accuracy of the quotation. The questions below are the ones we ask on every wall system order, and answering them early is how you avoid change orders once cabinetry is in production.

1. What exactly should the panels hide, and what stays visible?

"TV wall" covers several different briefs, and each one changes the carcass build. Before requesting a quotation, decide which of these you actually need:

  • A screen that closes completely behind panels, so the wall reads as joinery when the television is off.
  • A partial cover — the screen stays in an open niche while media storage, consoles and clutter sit behind doors.
  • A media wall that also carries shelving, display niches or lighting, where the sliding panel is only one element of a larger composition.

If you are still weighing options, our related Santerson Integrated TV Panels suit walls where the screen is framed permanently rather than concealed, and Santerson Storage & Display Combo suits rooms where storage volume matters more than hiding the set. Sending a floor plan plus one reference photograph of the wall tells us more in a single email than a written description.

2. What are the finished dimensions, and what is on the wall behind them?

Give overall width and height, plus the depth available — the finished face dimension, not the stud cavity. Sliding panels need a track zone, and that zone eats depth you cannot recover later. Then tell us what sits behind the intended run: load-bearing studs, timber noggins, existing plasterboard, insulation, or a concrete wall.

Wall systems fail far more often from substrate problems than from the joinery itself. If the wall will not carry the track and bracket loads as drawn, we need to know before we detail the fixing schedule — not when the installer opens the crate on site.

For a villa or apartment project where several rooms carry built-in casework, send the same dimension set for each wall. Grouping them lets us reconcile materials and finishes across the whole job instead of treating every unit as an isolated order.

3. Which panel configuration and hardware are you specifying?

Panel count, overlap and travel direction change both price and clearance. Tell us how many panels, whether they stack to one side or part in the centre, and whether the recess allows a double track. Then specify the finish: our wall panel range covers veneer, lacquer, textured and stone-look surfaces, so state which surface you want on the panel face and which on the carcass interior.

If acoustic separation matters — a media wall shared with a bedroom, or a lounge in a multi-unit development — say so at enquiry stage. Our Santerson Acoustic Sliding Panels and Santerson Partition Sliding Systems are built as room-dividing assemblies, and detailing them into the wall from the start is cheaper than retrofitting sound treatment around a standard TV unit.

4. Where do power, signal and cooling go?

This is the question most buyers skip, and it causes the most rework. A screen sealed behind panels still needs ventilation, and it still needs a socket, plus whatever the soundbar, console or streaming device requires. For each wall, confirm:

  • Screen size and mounting type — wall-mounted bracket or recessed into the carcass.
  • The number and position of power outlets behind the panel run.
  • Low-voltage routes for HDMI, speaker cable and network cable, and who pulls them: our joinery or your local sparky.
  • Whether integrated lighting is required in niches or shelving, and where its driver sits — drivers need to remain accessible for service.

We build the openings, vents and cable clearances into the panels around the information you send. Electrical first-fix on site should follow the setting-out drawing we return, not the other way round.

5. Who installs it, and when does the wall get handed over?

Sliding panel systems are measured work, so sequence matters. Floor finishes, paint and skirting should be complete before final site measurement; otherwise the panels arrive sized for a room that has not yet been finished.

Tell us who is on site. We provide installation support along with inspection and snagging as part of our installation and after-sales service, and for larger jobs we coordinate with the main contractor's programme rather than working to our own. If your project needs a drawing set, production coordination and on-site guidance, that sits inside our interior design services, where space planning, 3D visualisation and production coordination are handled as one package.

6. Does the wall system match the rest of the joinery on the job?

A media wall never stands alone in a villa or hotel suite. It has to read as one language with the wardrobes, kitchen cabinetry and doors either side of it. Where that consistency matters, ordering the wall system together with the rest of the built-in package is the practical way to guarantee matching veneers, edge profiles and ironmongery.

As a one-stop furniture and building materials supplier, SANTERSON produces cabinetry, wall panelling, doors, flooring, lighting and bathroom fixtures in the same facilities. For projects in Australia — where we have delivered villa work referenced in Willoughby, Perth, North Turramurra, Melbourne and Sydney — that single-source approach means one specification sheet, one shipment plan and one point of responsibility for the joinery package. Our custom and OEM service also covers bespoke finishes and private labelling when a designer or builder is working to their own detail.

7. What does the quotation actually include?

Before you compare suppliers, put every quote on the same basis. Ours should state:

Line to confirmWhy it changes the number
Panel face material and finishVeneer, lacquer, glass and textured surfaces price very differently at the same size.
Track, runners and hardwarePanel weight determines hardware grade; underspecified runners are the usual cause of early failure.
Carcass substrate and interior finishInterior board and edging are often quoted separately and get missed in comparison.
Ventilation openings and cable managementSealed recesses need vents; these should be detailed, not cut on site.
Packaging and container loadingLarge panels travel differently from loose furniture and affect crate design.
Freight mode and delivery addressSea, air and rail freight are all arranged through our logistics and door-to-door delivery service, including customs paperwork.
Installation scopeConfirm whether installers attend or whether you are buying the joinery only.

If a competing quote is materially cheaper, it is usually because one of these lines has been left out. Ask for the specification in writing before you decide.

A short pre-order checklist

  • Room photographs plus overall width, height and available depth for each wall.
  • Screen size, mounting method and the equipment that must fit in the recess.
  • Panel count, stacking direction and whether the panel face matches surrounding joinery.
  • Power, low-voltage and lighting positions, with confirmation of who does first-fix.
  • Finish schedule: panel face, carcass interior, edge profile, ironmongery.
  • Site completion date for flooring and paint, so we can schedule final measurement.
  • Delivery address, Incoterms and whether installation attendance is required.

Send that package and the quotation you receive will be buildable — which is worth more than a fast number against an incomplete brief.

Talk to us about your media wall.
SANTERSON — China-based manufacturer of furniture and building materials for villa, hospitality and office projects. Send your dimensions, screen details and finish references, and we will return a specification and quotation for review.
Contact: PHILLIP  |  Phone / WhatsApp: +86-13928214007  |  Email: santerson@qq.com
Enquire via the contact page

Panel dimensions, substrate requirements, hardware selection, electrical scope, freight terms and installation attendance are confirmed project by project on the drawing set and order documents for each job.