A flush hinged door looks simple on a drawing. It is the one opening in the room that disappears into the wall — no protruding casing, no visible stop, a clean shadow line all the way round. That simplicity is exactly why it causes so many site problems when the design intent and the commercial order are not agreed on the same page before production starts.
This article sets out what interior designers, project architects and procurement teams should settle with each other — and with the manufacturer — before a Santerson Flush Hinged Doors package goes into production for a villa, hotel or apartment project.
1. What "flush" actually means on this product
In our catalogue the term covers two related but different things, and mixing them up is the most common source of confusion in an early-stage enquiry:
- The door leaf sits flush with the finished wall face. The face of the leaf and the face of the wall land on one plane, so the opening reads as a continuous surface rather than as a framed aperture.
- The frame itself is concealed. The lining and any stop are set back behind the wall finish, so no timber or metal casing returns into the room. The visible detail becomes a shadow gap, not a profile.
Both effects depend on wall build-up, not just on the door. A leaf ordered flush to a 12 mm plasterboard face will not sit correctly against a 20 mm tile finish or a timber-clad feature wall. This is why our product pages state that finish, layout and dimensions are specified per project, and why we ask you to confirm dimensions and selected specifications for each order rather than treating one schedule line as transferable across a whole building.
2. Where flush hinged doors sit in our door range
It helps to place the request against the neighbouring collections, because designers often describe an outcome ("invisible door", "no architrave") without naming a product:
| Collection | What it is | Typical use on a project |
|---|---|---|
| Santerson Flush Hinged Doors | Hinged (swing) leaf with a flush, concealed-frame detail. | Bedroom, bathroom and corridor openings where a clean wall line is wanted but normal swing access is needed. |
| Santerson Flush Interior Doors | Interior door collection with the same flush design intent, specified per project. | General internal openings where the look must match the flush hinged specification across floors. |
| Flush Wall Aligned Doors | Part of the Flush / Concealed Doors collection, aligned to the wall plane. | Store rooms, plant cupboards and service access that should read as panelling. |
| Santerson Decorative Concealed Doors | Concealed door worked into a decorative wall surface. | Feature walls and joinery elevations where the opening must not interrupt the pattern. |
| Santerson Flush Sliding Doors | Sliding leaf with a flush detail. | Tight openings where swing clearance is not available. |
| Santerson Wood Veneer Hinged Doors | Hinged leaf in wood veneer finish. | Warm, timber-look doors where the flush detail is not required. |
| Standard Interior Hinged Doors | Conventional interior hinged door with a visible frame detail. | Back-of-house, service areas and budget-controlled zones where the concealed detail is not needed. |
A practical outcome of this comparison: most projects do not need every opening specified at flush level. Designers normally reserve the concealed detail for the rooms that carry the design intent — main suites, principal bathrooms, reception and corridor elevations — and hold service areas on a standard interior hinged door with a matching finish. Agreeing that split early is usually the single largest saving in the door package.
3. The six items designers and buyers must agree before we quote
These are the points our production team needs fixed in writing. Where any one of them is still open at order stage, the schedule will come back with a qualification against it.
a. The wall build-up and its total thickness
Flush detailing is built around the finished wall face. We need the make-up of the partition — board type, board thickness, any lining, and the final finish (painted plasterboard, tile, veneer panel, wallpaper over lining) — at every opening. Two identical door sizes in the same building can require different linings if one wall is tiled and the other is painted.
b. Which face the leaf sits flush to
A corridor door may need to be flush on the public side and tolerate a normal detail on the room side, or flush both ways. This changes the lining set and should not be decided on site.
c. Opening size, leaf size and head height
Our doors are made to measure, so we work from clear opening dimensions and the intended finished floor level, not from a nominal "standard" size. Please give width, height, the number of leaves per opening, and whether any door is to be carried full storey height — a very common request on villa projects, where a tall leaf reads as part of the panelling.
d. Hinge side, hand and swing direction
With no visible casing to indicate the hinge stile, handedness has to be right first time. We ask for a door schedule keyed to room numbers on the drawings, showing hinge side and swing for every leaf, rather than a quantity total.
e. Hardware — and who supplies it
Concealed hinges, pivot sets, magnetic edge pulls, lever furniture and any door closer each have their own mortise, load rating and cut-out position. Please confirm the hardware you intend to use, or tell us the duty and finish and we will match it. Where an architect has named a specific hinge, send the model reference; where none is named, agree the loading on the leaf at design stage, since tall and wide leaves drive the hinge specification.
f. Finish, and how it will be proved
Material and finish options are specified per project. On a flush door the finish is the product — a paint-grade surface that does not take decoration well will show at the shadow line. We recommend approving a physical sample before production for any colour, lacquer or veneer that appears across many openings, and matching the door finish to the joinery package rather than approving them separately.
4. Where the responsibility usually breaks down on site
Three recurring issues account for most of the rework we see discussed by project teams:
- The wall is built before the door lining detail is issued. Once the partition is closed and finished, a concealed lining that was not designed in cannot be introduced without opening up the wall. The lining set must be fixed to the framing stage.
- Finishes are changed after the door order. Swapping plasterboard for tile at a bathroom opening shifts the finished face and therefore the flush relationship. Any change to wall make-up should trigger a re-check of the door schedule.
- Hardware is chosen last. A closer or a specific concealed hinge selected after production has started may not be compatible with the agreed cut-outs, which forces either new leaves or substituted ironmongery.
None of these are manufacturing problems. They are sequencing problems, and they are solved by having one coordinated schedule that both design and procurement sign off.
5. How our process supports a matched door package
Santerson works as a manufacturer and one-stop supplier of furniture and building materials, headquartered in China and operating since 2008, with project customers across hospitality, villa and office work. Doors rarely travel alone on these projects — they are ordered alongside interior fixtures, joinery, wall finishes and loose pieces, which is an advantage if the coordination is done once rather than item by item.
- Custom & OEM service. Bespoke sizes, materials, finishes and textures are produced to project requirement, with flexible minimum order quantities. Send drawings and we will work from them.
- Design and specification coordination. Space planning, material selection and product specification sit in the same workflow as production, so a door schedule can be checked against the joinery and wall finishes it has to match.
- One delivery chain. Freight by sea, air and rail with customs paperwork and door-to-door delivery, so the doors arrive with the rest of the package instead of on a separate lead time that holds up the fit-out trade.
- Installation guidance and after-sales support, including on-site coordination for the fit-out sequence.
6. A short pre-production checklist
- Finished wall make-up recorded at every opening, including thickness and finish type.
- Flush face confirmed — one side or both.
- Clear opening dimensions with finished floor levels stated.
- Door schedule by room number: size, leaf count, hinge side, swing.
- Hardware named or duty agreed, including closers where required.
- Finish approved from a physical sample and matched to the joinery package.
- Flush specification limited to the openings that need it; service areas held on standard hinged doors.
- Any change to wall finishes routed back for a door schedule re-check before production release.
If you are specifying a door package and want the flush detail resolved before drawings are frozen, send us the room-by-room schedule and the wall build-ups. We will confirm what is required at each opening and quote against the agreed specification. Contact PHILLIP on +86-13928214007 (phone/WhatsApp) or santerson@qq.com, or start from our product range.