A two-tone kitchen scheme looks simple on a mood board and complicated on a purchase order. When the upper cabinets are light grey, the lower cabinets dark grey, glass display units carry warm LED lighting and several appliances are built into the cabinetry, every decision — panel colour, door profile, carcass height, appliance niche, hardware, lighting circuit — has to be written down before production starts. This guide walks through the specification sections we work with on light & dark grey modern kitchen cabinets for villas, high-rise apartments and boutique hotel projects, so that your enquiry, our workshop drawings and your site team all describe the same kitchen.
1. Start with the room, not the door sample
Send the measured shell condition first: overall wall lengths and heights, the position of soil stacks, flues, risers and existing electrical outlets, floor finish level, and window and doorway openings with their reveal depths. Note ceiling height at both ends, because a two-tone run that stops below a sloped or boxed-in ceiling changes the whole upper-cabinet module.
Then mark three things on the drawing: the wet zone (sink and dishwasher), the preparation zone (worktop between sink and hob) and the cooking zone (hob, extractor and oven wall). Cabinet widths follow from those positions, not the other way round. If you are specifying several apartments in one building, state clearly which units repeat and which are site-specific — repeating modules are what make a project price hold.
2. Define the two-tone palette with numbers
"Light grey uppers, dark grey lowers" is not a specification. Record for each zone: the panel material, the surface finish (matte lacquer, acrylic, melamine or wood-effect laminate), and a reference — an RAL code, a supplier board code, or a physical sample number that both sides have signed. Grey is the colour most easily mismatched between batches, so fix the reference in writing.
State the sheen as well as the tone. A light grey matte upper and a dark grey high-gloss lower read as two different kitchens from a matched matte pair, and gloss panels show fingerprints in a guest-kitchen or pantry setting. Also confirm whether the tall cabinets match the uppers or the lowers, and whether end panels, plinths, cornices and internal shelf edges are specified to follow the same finish or intentionally contrast.
If you want the two-tone look explored further, our grey modern kitchen cabinets with LED glass wine cabinet and modern blue grey minimalist kitchen cabinets pages show how the same flat-panel language behaves with a third colour or a larger illuminated display unit.
3. Fix the door profile and edge detail
The flat panel is the defining feature of this style, so describe it precisely: door thickness, edge radius or square edge, whether the panel is single-skin or double-sided laminated, and how the door meets the carcass (inset, overlay or full-overlay). For a handleless look, state which method you want — a routed J-pull, a recessed channel rail, or a touch-to-open mechanism — because each needs a different clearance at the adjacent panel and at the wall.
Our handleless minimalist kitchen cabinets are built with soft-close fittings as standard, which is worth specifying explicitly on a project order: contract hinges and slides from a different supplier behave differently under daily guest use, and the hardware schedule should name the brand, the closing action and the load rating for drawer units.
4. Schedule the glass display cabinets and their lighting
Glass fronts need their own line in the schedule rather than a note in the margin. Specify: the glazing type (clear, bronze, smoked or ribbed), whether the frame is aluminium or matching the panel material, the handle or pull detail, and the shelf layout inside. Then specify the lighting separately — warm-white LED strip or recessed spots, the colour temperature you expect, where the transformer sits and how the unit is switched.
Two practical points we raise at drawing stage. First, run the supply to a reachable position: a transformer sealed behind a fixed panel becomes a maintenance problem on handover. Second, decide what the display will actually hold — wine bottles, goblets, storage jars — because shelf depth and load capacity differ, and glass shelves with LED tape need an aluminium profile to dissipate heat. The under-cabinet light strip over the worktop is specified the same way: length, mounting position, and whether it is switched at the wall or by a sensor inside the cabinet.
5. List every appliance with its exact model
Built-in appliances are where specifications fail most often. For each one, give make, model and a dimensioned cut-out drawing: refrigerator, single or stacked ovens, hob, extractor, dishwasher, wine conditioning unit, microwave or coffee machine. Record the door type — integrated hinge, sliding hinge or free-standing with a panel-ready front — plus ventilation requirement, power rating and cable entry position.
Where you have not chosen appliances yet, say so in the specification and state the niche dimensions you want reserved, along with the required ventilation gap. A cabinet can be built to an assumed appliance size, but the workshop needs to know it is an assumption. If your project uses appliances supplied by another contractor, flag this early: panel-ready fronts must match the cabinet finish, and we need the front-fixing details from the appliance manufacturer before the doors are cut.
6. Specify the carcass, worktop interface and splashback
State the carcass material and thickness, the standard module heights you want (base, wall and tall), whether the base units sit on an adjustable plinth or are scribed to the floor, and how the run resolves internal and external corners — carousel, pull-out racking, drawer stack or plain shelf. The worktop is usually a separate trade, so specify the thickness and set-back that the cabinet must support, plus the position of any upstand.
The splashback behind the hob and sink is part of the visual scheme in these kitchens: marble-pattern stone panels are described on our product pages as stain-resistant and easy to wipe. Specify its material, thickness, joint positions and whether it is supplied by us or by your stone supplier — a mismatch here delays installation more often than the cabinetry does.
7. Add the finishes and durability questions a project buyer should ask
For rental apartments, guest kitchens and boutique-hotel use, add a line about expected wear: panel edges in high-touch positions, the finish's resistance to scratches and cleaning agents, and what cleaning products are recommended. Our product pages describe premium board with a stable structure, scratch-resistant surface and simple maintenance; on a heavy-traffic project we still recommend confirming the specific board and edge-banding system at sample stage rather than assuming the whole range behaves identically.
Ask for a signed physical sample of every finish in the schedule before production release: one light grey panel, one dark grey panel, one glass-front sample and one hardware sample. That single step removes most colour disputes at handover.
8. How the specification becomes a production order
Once your document is complete, our workflow follows the stages published on the site: consultation and space planning, then design and detail confirmation with workshop drawings for your approval, then production with quality control, logistics, installation support and after-sales. The custom built-in kitchen cabinets line covers matching hinges, drawer slides, support legs and connecting brackets as part of the package, which keeps a project order to one hardware schedule instead of several. Our custom minimalist kitchen cabinets page makes the same point about layout flexibility: base cabinets, wall cabinets and pantry units are made to your plan rather than chosen from fixed sizes.
What we need from you at enquiry stage is straightforward: the measured drawing, the room-by-room cabinet list, the finish references, the appliance schedule, and the delivery destination with any site access constraints. With those in hand we can return a quotation that reflects your actual kitchen rather than a generic module price.
Send us your kitchen specification
Whether you have complete drawings or only a layout and two colours, share what you have with our team. We will review it against the light & dark grey modern kitchen cabinets specification above, flag anything missing, and quote for villas, apartment blocks and boutique hotel projects. Related collections in the same category are listed under kitchen cabinets and hotel appliances, where you will also find schemes such as our black & light grey L-shaped kitchen cabinets for compact layouts.