A rendering of a wall-hung washbasin unit looks convincing on its own. It does not tell a factory what to build. The gap between an approved bathroom concept and a delivered floating vanity is filled by one document: the enquiry. Written well, it lets our team quote accurately, flag conflicts early and start production on the right configuration. Written thinly, it produces samples that look nothing like the drawing and change orders nobody budgeted for.

SANTERSON has manufactured furniture and building materials since 2008, supplying villa, hospitality and office projects across five continents. Our floating vanities are made to measure rather than picked from a fixed size chart, so the information you send with the enquiry determines what comes back in the quotation. Here is how we read an enquiry at our end, and what to include so the first round of correspondence does the work of three.

What We Read First in a Vanity Enquiry

When an enquiry reaches our project desk, we are not judging the design. We are checking four things before anything goes to production: whether the unit can be built to the stated opening, whether the wet-side and storage decisions are compatible with that build, whether the finishes named exist in our material library, and whether the delivery and installation arrangement on site matches how the unit has to arrive. An enquiry that answers those four questions is quotable within a day or two. One that does not turns into an email chain.

The Six Items That Make an Enquiry Quotable

You do not need a full technical pack to open an enquiry. You do need the following six items, and each one removes a round of questions from both sides.

1. The wall, not just the unit

A floating vanity carries its own weight plus the load of the basin, tapware and anything stored inside it, all of it transferred to the wall rather than the floor. Tell us the overall width you want, the height of the finished underside above the floor, the projection from the finished wall face, and what the wall is made of — masonry, stud partition, or timber framing with noggins. Where the waste and water connections sit relative to the wall line matters just as much: a soil connection set deep into a brick wall changes the carcass depth, and we would rather design around it than discover it on site.

2. Basin and tapware decisions

State which you intend: an integrated countertop where the basin and top are one piece, a separate vessel sitting above the counter, or an undermount basin set below it. Each choice changes the top thickness, the cut-out, and the height of the unit beneath. Then name the tapware — deck-mounted, wall-mounted, or free-standing — because wall-mounted spouts need solid blocking behind the tiles at exactly the right height, and that blocking has to be coordinated before tiling, not after.

3. Storage layout room by room

Tell us how each bathroom is used, not just how it looks. A family main bathroom needs deep drawers for towels and toiletries within reach of the bath. A guest powder room can be shallower with a single drawer. An ensuited dressing area may need a mirrored cabinet opposite. Drawers, doors, open niches and pull-out organizers each have different minimum depths and different hardware, so we design the carcass around the storage you actually asked for.

4. Finish named by material, not by mood

"Warm timber look" is a starting point, not a specification. Our custom and OEM service covers bespoke finishes and textures, so give us the material family you want — wood veneer, lacquer, laminate, melamine or metal — and send a reference image or a physical sample number if you have one. We will confirm which finishes are available for a wet environment and which need a different build-up than the same colour used on a wardrobe in a dry room.

5. Quantity, schedule and destination

Give us the number of units per type, the site country or city, and the date the vanities need to be on site. Vanities for a single villa are packaged and shipped differently from a repeated layout across an apartment block or hotel floor. We handle freight by sea, air and rail with customs paperwork and door-to-door delivery, and we can produce matching pieces from other ranges in the same production run — double vanities, tall storage units or wardrobes for the adjoining dressing room — which is worth deciding before the schedule is set, not during it.

6. Who installs, and when they arrive

Tell us whether your own trades will fix the units or whether you want our installation support. This decides how the vanities are packed, whether the wall battens and hanging systems ship with the units, and what drawings we issue. Our after-sales service covers on-site installation, inspection and snag lists, spare parts and replacement, so it helps to know in advance which arrangement applies to your project.

A Specification Sheet You Can Copy

Fill this in for each bathroom type in the project — one row per type, with quantities — and send it with your drawings. It is the same sheet our estimators work from.

Project and locationProject name, site city and country, room or floor reference for each unit type.
Unit type and quantityFloating, double or integrated-countertop configuration; number of units of each type.
Overall dimensionsWidth, projection from finished wall face, unit height, and finished underside height above the floor.
Wall constructionMasonry, stud partition or framed timber; whether noggins or blocking are already set; tile or panel finish on the wall.
Basin decisionIntegrated countertop, vessel above counter or undermount below; basin make and model if already selected.
Tapware and drainageDeck, wall-mounted or free-standing spout; position of water inlets and waste relative to the wall line and floor level.
Storage layoutDrawers, doors, open niches or pull-out organizers per unit; anything you want concealed versus on display.
Finish referenceMaterial family plus colour, sample number or reference image; matching items elsewhere in the property if relevant.
Lighting and mirrorMirror type, vanity lighting position, and whether electrical work is already fixed to a drawing.
ScheduleDate the vanities must reach site, and which other fit-out items travel in the same consignment.
Delivery and installationPort or door delivery address, who performs the installation, and any access limits at the site.

What Happens After You Send It

Our cooperation steps are fixed for a reason: they exist to close open questions before metal, board and stone are cut. First, the project brief and design proposal — we review your sheet and drawings, confirm which configurations are feasible at the stated dimensions, and issue a quotation with the detail behind it. Second, quotation and detail confirmation — you approve finishes, hardware and layout, and we settle anything that affects the build before production begins. Third, production, shipment and follow-up — manufacturing under our quality control, then freight, delivery and site coordination as agreed.

You will get questions back at stage one if something in the pack conflicts. That is normal and it is cheap: a wall-mounted spout with no blocking behind it, or a vessel basin on a unit sized for an undermount, costs nothing to fix in a drawing and a great deal to fix once tiles are laid.

Before You Hit Send

  • Dimensions measured from finished surfaces, not structural ones, so tile thickness is already accounted for.
  • A drawing or photograph of the wall showing where water, waste and electrical points sit.
  • One named basin decision and one named tapware type per unit.
  • Finish references by material family, with a sample number or image attached.
  • Quantities split by unit type, with the required on-site date.
  • A clear statement of who installs the units at the destination.

Missing the details above does not disqualify an enquiry — it simply means more rounds before production. If you have a rendering and a room dimension and nothing else, send those and we will start from there; our design and specification service exists to fill the gaps with you rather than after the fact.