An above-counter basin looks simple on a drawing, yet it is one of the easiest items in a bathroom fit-out to get wrong. Before we can price the Santerson Vessel Basin (Above Counter) for your project, our team needs a specific set of details about the space, the counter it will sit on and the way the room will be used. This guide lists exactly what to send, why each item matters, and what you get back once the information is complete.
Why a vessel basin quote needs more detail than a standard basin
The vessel basin in our Countertops & Basins range is a configurable, made-to-order item for residential bathroom projects. Finish, layout and dimensions are specified per project rather than fixed to one catalogue size. That flexibility is the point of the product, but it also means the price depends on your choices: bowl size and shape, the finish you select, whether the counter is supplied by us or by your local fabricator, and how many basins appear across the room set.
An undermount model in the same collection behaves differently again — its cut-out dimensions and countertop compatibility have to be settled before fabrication. So the more detail you give us at the start, the fewer revisions later.
The eight items we ask for in an enquiry
| What we need | Why it affects the quotation |
|---|---|
| Room layout and drawings (plan, elevations, existing or new build) | Sets basin position, clearance to walls and mirrors, and whether plumbing is being relocated. |
| Countertop information: material, thickness, depth and who supplies it | An above-counter bowl sits on top of the surface, so counter depth and edge detail decide the bowl footprint. Pairing the basin with Stone & Marble Surfaces from us changes what we quote versus a locally cut top. |
| Basin quantity per room and across the project | Guest WC, main bathroom and ensuite rarely need the same size. Quantities also drive how the order is consolidated for shipping. |
| Finish and hardware preference (tapware height, spout reach, waste type) | A tall vessel mixer needs clearance behind the bowl; the waste choice affects what sits under the counter. |
| Storage and mirror plan for the same wall | Mirror cabinets and vanities must be dimensioned around the raised rim of a vessel bowl. See Floating Vanity and LED Mirror Cabinet if those are part of the scheme. |
| Project location and delivery address, plus your preferred Incoterms | Freight, packaging and container loading are quoted per destination. We arrange door-to-door logistics, so we need the site or warehouse address to price it. |
| Target programme: design freeze date and required on-site date | Production slots and consolidation of multiple shipments depend on your schedule, not ours. |
| Reference images or a mood board where the look matters | Speeds up finish selection and avoids sample round-trips. |
Details we confirm with you before finalising
Some questions can only be answered together with your designer, builder or plumber. We raise them early so they do not surface as variations on site:
- Basin and countertop fit — the bowl footprint against counter depth, and the tap reach relative to the rim.
- Splash zone to the wall behind the bowl, and how the finish there is protected.
- Whether waste and overflow are exposed or concealed, which changes cabinet and drawer layout below.
- How the vessel basin coordinates with adjacent items in the same range, such as the Undermount Basin or Double Basin Countertop, where one bathroom uses two different mounting styles.
- Shower, lighting and accessories specified for the same room, so everything arrives on the same programme — Modern Rainfall Shower System and Vanity Lighting are usually confirmed at the same time.
What you receive once the information is complete
With the above details in hand, we return an itemised quotation covering the basin configuration you selected, any countertop or joinery that goes with it, packaging and freight to your address, and the production timeline for your programme. As a one-stop furniture and building materials supplier, we quote bathroom ceramics alongside the cabinetry, wall panelling, lighting and flooring in the same project — which is where consolidation genuinely saves money and coordination effort.
If you are specifying several rooms or several units, send the room schedule as a single file. We will match items to categories across our range and flag anything that should be produced together rather than ordered separately.