An arched wardrobe front looks simple on a drawing: a curve over a frame, a panel inside it. In production it is one of the least forgiving items in a joinery package. The radius has to be fair, the moulding has to hold its line through finishing, and the carcass behind it still has to sit flat against walls that are never quite plumb. Before a custom arched paneled wardrobe goes into manufacturing, the following decisions should be closed out on paper, not left to the shop floor.
1. The opening dimensions, taken on site
Work from a site survey, not architectural setting-out drawings. Record the finished floor level and the finished ceiling or soffit line, then measure the opening at three heights and three widths, because an arched front exaggerates any out-of-plumb wall — a 10 mm deviation that disappears behind a flat door becomes a visible taper beside a curve.
For built-in work, confirm what sits above the unit. A full-height wardrobe that runs to the slab needs either a scribe or an integrated pelmet detail agreed in advance; leaving it to the installer on the day is how curves get trimmed on site.
2. What the arch actually is
"Arched" covers several different constructions, and they do not cost the same or age the same way. Three questions settle it:
- Radius and proportion. A full semicircle over a narrow door behaves differently from a shallow segmental arch over a wide one. Ask for the radius, the clear opening width and the springing point — where the curve starts — on the same drawing.
- How the curve is formed. Solid stock mouldings, bent lamination, CNC-cut layers built up to profile, or a pressed panel. Each has different limits on minimum radius and different finishing behaviour at the arrises.
- Panel construction behind the arch. A framed door with a raised field moves slightly with humidity; a single-piece moulded front does not. Decide which one you want before the finish is specified.
Our arched paneled wardrobe range sits inside the Classic Paneled Wardrobes collection, where finish, layout and dimensions are specified per project rather than chosen from a fixed size grid.
3. Material and finish, stated by specification
A colour name is not a specification. For wardrobe fronts we work across solid timber, veneered substrates, lacquer, acrylic, melamine and glass-fronted combinations, and each family behaves differently on a curved profile:
- Solid wood — e.g. classic paneled solid wood wardrobes. Traditional for raised and arched paneling; grain movement has to be allowed for in the frame construction.
- Wood veneer — walnut veneer wardrobes and oak alternatives give a consistent figure across a run, but the edge band on a curved arris is the detail to inspect.
- Lacquer and acrylic — matte lacquer wardrobes and high gloss fronts need the build-up on edges confirmed, since a curve exposes more arris than a flat door.
- Melamine — wood grain melamine wardrobes are economical and hard-wearing, but tight radii on a pressed board face should be tested before the whole order commits.
Specify the substrate, the surface material, the sheen level and the applicator for each visible component — door face, moulding, carcass edge and interior — and ask for a signed physical sample of the actual arch profile in the chosen finish, not just a flat board.
4. Interior layout and hardware
The curve takes volume away from the top of the carcass, so plan the interior around it rather than against it. Confirm:
- Hanging heights, shelf depths and drawer bank positions drawn to the finished internal dimension.
- What happens in the arched head — a shallow shelf for cases, a void sealed off, or an access panel.
- Hinge type and door weight. An arched solid door is heavier than the flat version of the same size; hinges and soft-close hardware should be rated on the actual door, not the collection default.
- Lighting: whether interior or niche lighting is wired, and where the driver sits for service access.
5. Tolerances, finishes and site conditions
Write down who owns each interface before production starts: the floor finish, the wall finish, the skirting, the ceiling line and any adjacent joinery. Decide whether the unit is scribed to the wall or shadow-gapped, and put that detail on the drawing. For painted and lacquered fronts, confirm the paint system and how touch-in will be handled after installation, since arched mouldings show handling marks more readily than flat panels.
6. Prototyping, approval and delivery sequence
For a project where arches repeat across several rooms, one approved mock-up of the profile — arch, panel, finish and hardware — removes most of the argument later. Through our custom and OEM service, wardrobes are made to measured dimensions with material, finish and layout set per project, so the approval sample is the reference every following unit is matched against.
Then confirm the logistics chain in writing: packaging standard for glazed and moulded fronts, container loading sequence, the delivery point, and who installs. Our logistics and door-to-door delivery service covers freight forwarding and documentation to site, and installation and after-sales support covers on-site fitting and snag inspection. Agree the inspection checklist before the units leave the factory, so what is checked at handover matches what was approved in the prototype.
A short pre-production checklist
- Site survey signed off: heights, widths, floor and ceiling lines, squareness.
- Arch defined by radius, springing point and construction method on the drawing.
- Substrate, surface material and sheen specified for every visible component.
- Physical arch sample approved and retained as the production reference.
- Interior layout drawn to finished internal dimensions, with hardware rated to actual door weight.
- Interface tolerances and scribing method agreed in writing.
- Packaging, delivery point, installer and snag list confirmed before despatch.
Send us the drawings or the site measurements and we will confirm what is feasible on your arch radius, which finishes hold that profile well, and what the unit costs once those variables are fixed. SANTERSON manufactures these wardrobes to measured dimensions, so a single enquiry can cover the survey detail, the finish sample and the quotation.