Folding doors answer a question that hinged and sliding doors cannot: how to close an opening completely and still stack the leaves almost flush against the wall when it is open. That same advantage is where the procurement risk sits, because the hardware has to carry every leaf, guide them along a track and keep the stack aligned through years of use. Before a purchase order is raised for Classic Folding Doors, procurement teams should walk through the checks below, since nearly every folding-door problem found on site was created much earlier, on paper.
1. Opening dimensions and the finished-floor reference
Folding doors are made to measure, and the measurement has to be taken against the completed build, not the structural shell. Rough opening, finished floor level, wall finish thickness and ceiling set-down all change what the leaves need to clear. A drawing that shows an opening but not the door reveal, or a specification that assumes a floor covering that is still unpriced, produces doors that either bind or leave visible gaps.
Before confirming an order, ask the supplier and the site team for the same information: clear opening width and height after finishes; the position of skirting, architraves and any cornice; the threshold detail at the floor; and whether the head track sits under a structural beam or inside a built-up soffit. Where the two sets of numbers disagree, resolve it on paper first. Re-cutting an opening on site is cheaper than rebuilding a door set.
2. Leaf count, stacking side and how the door will actually be used
The layout of a folding run is a design decision, not a catalogue option. Number of leaves, leaf width, which side the stack lands on, and whether the run includes a master (traffic) leaf all change the hardware set and the way the opening performs day to day. A wide run split into many narrow leaves looks balanced on an elevation but adds hinges, more moving parts and a narrower clear opening when the master leaf is the only one in daily use.
Write down how each opening will be used before fixing the layout: does it need to open fully for servicing or moving furniture, or mostly as a pass-through? Which wall is free for the stack? Is the door exposed to moisture, dust or heavy public traffic? Teams comparing options across a project often review the folding range alongside Classic Pocket Doors. A pocket slides into the wall and needs no stack at all, but it needs a cavity to slide into, which is a structural decision rather than a joinery one.
3. Hardware, load path and what sits above the track
The track and pivot carry the door. Two questions decide whether an installation lasts: what the head track is fixed to, and what the leaves weigh. A timber head blocking, a steel section or a built-up frame each fix differently, and the fixing pattern should be specified rather than left to the fitter. Ask for the maximum leaf weight and size the supplier's hardware set supports, then confirm that the selected leaf construction sits inside that limit.
Also check what happens at the floor. A bottom track with a recessed guide behaves differently under a wheelchair, a cleaning machine or loose rugs than a floor-sprung pivot does. Where accessibility or housekeeping matters, choose the guide detail deliberately and record it in the specification, because trades on site will default to whichever is easiest on the day.
4. Materials, finishes and where the door is installed
Finish selection is a maintenance decision. A veneered or lacquered leaf in a humid or high-touch location needs different detailing, and different cleaning instructions, than the same leaf in a low-use corridor. The folding range can be specified with project-specific dimensions, materials and finishes, which is why the environment of each opening should be listed on the enquiry rather than assumed. Santerson Wood Veneer Folding Doors and Santerson Glass Folding Doors are the same family with very different care requirements, so do not group them under one finish note on a schedule.
For glazed leaves, confirm the glass build, the edge detail and how the glazing is bedded in the frame. For solid leaves, confirm the core, the edge treatment and how the finish is protected at the meeting stiles, where leaves strike each other on every cycle.
5. Documentation to have on file before the order is released
A folding-door order should not be released on a line item in a bill of quantities. The pack you want signed off includes: opening sizes with the finished-floor and ceiling references; elevations showing leaf layout, stack side and master leaf; the hardware set with its load limits; the finish schedule by location; threshold and track details; and a named revision number for each door type. Every change after that point should be issued as a written variation against that revision.
This is also where made-to-measure work rewards coordination. Where doors are part of a wider package of built-in joinery, wall panelling and cabinetry, one coordinated set of drawings prevents the trades from working to different dimensions. A supplier handling doors, joinery and finishes together under one production and delivery plan removes a whole class of handover disputes.
6. Delivery sequence, storage and site handling
Made-to-measure doors arrive ready to hang, which makes them the item most likely to be damaged by an unprepared site. Confirm the delivery window against the wet trades, check that the store is dry and level, and keep leaves flat and off the floor until installation. Hardware packs should be tagged to door types and stored separately from general site consumables.
Sequencing matters commercially as well as physically. Doors delivered before the openings are finished sit in storage and get damaged; doors delivered after the decoration is complete have to be forced through unfinished openings. Agree the sequence with the main contractor in writing, including who inspects each opening before installation starts.
7. Installation, commissioning and the snag list
Folding doors need commissioning, not just fixing. Before signing off an installation, operate every leaf through its full travel, check that the stack closes square, that the meeting stiles meet without a visible gap, that no leaf drags the floor, and that handles and any locking engage without pressure on the frame. Record the setting of pivots and guides so a later adjustment can be traced.
Put the operating and cleaning instructions into the handover pack with the door schedule. Most early complaints about folding doors are misuse or an unrecorded adjustment, not a failed component. A snag list that references the specification revision is far easier to settle than one written from memory.
8. Spares, serviceability and after-sales terms
Ask which parts wear first on the specified hardware set, whether those parts are stocked or made to order, and how a replacement is ordered: by part code, by door type or by project reference. A door that cannot be serviced becomes a full replacement job, so the spare-part route should be documented at the same time as the order, not after the first failure.
Confirm what the warranty covers in practice: hardware as well as leaves, labour as well as parts, and which site conditions void it. Where a project spans several countries, clarify who attends site for warranty work and how quickly, so the answer is not discovered during an outage.
A short pre-order checklist
- Opening sizes taken after finishes, with a stated finished-floor reference.
- Leaf layout, stack side and master leaf agreed against how each opening is used.
- Hardware set confirmed against maximum leaf weight and the fixing substrate above the track.
- Threshold and guide detail chosen for accessibility and housekeeping.
- Finish schedule written by location, with glazed and solid leaves specified separately.
- Every door type carrying a revision number, with changes issued as written variations.
- Delivery window agreed with the main contractor, plus dry storage on site.
- Commissioning checks and handover instructions listed in the snag pack.
- Spare-part route and warranty terms recorded before the order is released.
None of these risks needs a specialist to spot; each one is an open question on a drawing or a quotation. Work them through with your supplier before ordering, insist that the answers are written into the specification revision, and let the doors arrive only once the openings are ready for them. Done in that order, folding doors do what they promise: a full-height opening that closes like a wall and disappears when you need the space.
SANTERSON manufactures folding doors, built-in joinery and interior fit-out products to project-specific dimensions and finishes, with production, door-to-door delivery and installation support coordinated under one package. Send us your opening sizes, elevations and finish schedule, and we will confirm the layout, hardware set and lead time for each door type before anything goes into production.