Open wardrobes are deceptively easy to specify and surprisingly easy to get wrong. There is no door schedule to argue over, no hinge hand to confirm, and the frame itself is usually a small part of the drawing set — so the item that carries the most load in the room often receives the least documentation. This article sets out what procurement teams should actually record before an order for metal frame open wardrobes is released to production.
Why the metal frame changes what you need to record
A timber carcass hides its structure; a metal frame does not. Uprights, rails and bracket points stay visible, and they set the bay widths, the shelf spans and the fixing detail at floor and ceiling. That means the drawing has to carry information that would otherwise sit in the workshop.
Three consequences follow. First, tolerances are unforgiving — a frame cannot be planed back on site, so the recorded dimensions must match the finished wall finishes, not the structural shell. Second, the frame profile is a design decision, not a default: depth, section size and finish all read visually in an open layout. Third, load paths are exposed, so shelf spans and hanging-rail positions should be documented against what the project intends to store.
SANTERSON's Metal Frame Open Wardrobes sit within the wider Open Wardrobes collection and are made to measure, with material and finish options and a layout tailored to each project. The catalogue entry closes with an instruction worth taking literally: confirm dimensions and selected specifications for each project. That confirmation is exactly what good procurement documentation exists to produce.
Document 1: the dimensional record, taken at the right stage
- Overall width, height and depth, stated as finished opening dimensions after wall, floor and ceiling finishes are complete.
- Which faces are true and which are out of square, plus the measured deviation — an open frame will reveal a crooked wall rather than mask it.
- Floor build-up and whether the base sits on the finished floor or is set into it, since this changes both height and the fixing detail.
- Position of skirting, architraves, recesses, bulkheads and any service runs that a frame or bracket must clear.
- The survey date, the site contact and the revision number of the drawing the dimensions were taken from.
Recording who surveyed and against which drawing revision removes most disputes later. A dimension without a source is an opinion.
Document 2: the layout and its storage logic
Open wardrobes are used because someone wants the contents visible and reachable — hanging at eye level, folded stacks, luggage, display pieces. That intent should be written down bay by bay, otherwise the layout defaults to a generic shelf grid that suits nobody.
- A bay schedule: width of each bay, hanging heights (single or double), shelf count and shelf spacing.
- Shelf span for each bay, with the intended load category noted — light folded clothing is not luggage.
- Drawer and basket positions, including clearance needed for runners to extend fully in a room with no door leaf to swing.
- Lighting provisions: fixture type, cable route, driver location and how the driver will be reached for maintenance.
- Anything deliberately left open — a bag hook zone, a full-length mirror line, a suitcase bay at floor level.
Where the project also calls for closed storage nearby, note how the open run transitions into it. Open modular wardrobes and closed units meet at a vertical stile, and that junction needs a dimension and a finish decision before fabrication.
Document 3: materials, finishes and the samples you signed off
For an open wardrobe the frame is furniture, not carcass. Record the metal finish by name and application method, the shelf and panel substrate, the edge treatment, and the surface colour with a reference that survives across suppliers — RAL, a manufacturer code or a signed physical sample.
- Sample reference, date issued, date approved and who approved it.
- Where each material is used, since frame finish and shelf finish are usually different products.
- Edge and joint detailing for visible shelf ends; in an open layout these are seen from across the room.
- Any matching items specified to the same finish — frames elsewhere in the project, metal frame shelves, or adjacent joinery.
Finish approvals are the single most common source of rework on open storage. A photograph of a signed sample, filed with the order, is cheaper than a replacement run.
Document 4: interface, fixing and sequencing
- Substrate behind each fixing point — masonry, timber stud, plasterboard, or a blocking detail to be added.
- Fixing method and whether the frame is fixed, suspended or braced between walls.
- Sealant or trim expectation at wall and ceiling junctions, and who supplies it.
- Trade sequence: when the survey happens, when finishes are signed off as complete, and when the unit is installed relative to painting, flooring and snagging.
Open units are usually installed late, after paint and floors, precisely because they have no doors to protect. That makes them vulnerable to being the last item on site and the first to be blamed for a slipping programme. A written sequence with named responsibilities prevents both.
Document 5: commercial terms and after-sales record
Keep the paperwork that lets you re-order or repair rather than replace. Minimum order quantities, packaging and container loading arrangements, shipping method and delivery scope, plus the named contact for each stage should all sit in one file. For multi-unit work — a villa floor, a guest-room stack, an apartment batch — record unit schedules with per-unit dimensions so later phases repeat cleanly.
SANTERSON's service pages describe custom and OEM work, logistics with door-to-door delivery, and installation with after-sales support. Treat the specific response times, warranty terms and installer arrangements quoted on those pages as claims to verify for your own project, region and scope before they go into a contract.
A short checklist to attach to the enquiry
Send the survey drawings and the bay schedule with the enquiry rather than after it. Made-to-measure open wardrobes are specified through documentation, not through a catalogue number, and the supplier who receives complete information is the one whose fabrication drawings come back usable at first pass.
As part of a wider fit-out, wardrobe documentation should be consistent with the rest of the joinery package. SANTERSON supplies wardrobes alongside kitchen cabinetry, built-in storage walls, lighting and flooring for villa, hospitality and office projects, so a single documentation format across the package reduces clashes between trades and shortens the approval cycle.