A mixed open and closed wall unit looks simple on a mood board and complicated on site. Shelves have to line up with skirting, closed carcasses have to clear doors and switches, and the finish that reads well in the showroom has to read well under the room's actual lighting. This article walks through how SANTERSON takes Santerson Mixed Open & Closed Systems from a design drawing to an installed unit, and what we need from your side at each step so the two sets of information never contradict each other.
Why this wall type needs more coordination than it looks
A composition that mixes open shelving with closed cabinets fails in two places at once when the numbers are wrong. A mis-measured closed carcass can be scribed and hidden; a mis-set open bay cannot, because its edges, shelf lines and reveals are all on display. Add a television, lit niches or an appliance into the same run and the wall stops being cabinetry — it becomes an interface between joinery, electrical work and the building fabric. That is why the handover between design drawings and site conditions deserves more attention here than it would for a loose furniture order.
What the product actually is
Santerson Mixed Open & Closed Systems sits in our Modular Living Systems range. It combines open shelving and display niches with closed cabinets in one continuous wall composition, and it is made to measure: layout, dimensions, materials and finish are specified per project rather than chosen from fixed sizes. The related Santerson Mixed Open & Closed Storage follows the same logic as an integrated storage wall, while Santerson Open & Closed Combo Units covers media-wall layouts where screen space has to be planned around the cabinetry.
Because nothing in this range is a fixed catalogue size, the accuracy of your drawings and our shop drawings decides how the job runs. Confirm dimensions, internal storage layout, finish and any electrical specification for the configuration you intend to order; we verify each of those with you before production rather than assuming a default.
Step 1: Read the design intent before reading the dimensions
Before we draw anything, we look at what the designer is trying to achieve with the wall. Three questions shape everything downstream:
- How much of the wall should be visibly open? Open shelving reads light and gives display space, but every object on it stays visible and needs dusting. Closed fronts hide clutter and give a clean plane.
- Is the unit meant to be furniture or architecture? A unit that stops short of the ceiling behaves like furniture and can be adjusted on site. A floor-to-ceiling composition becomes part of the build, so wall flatness, ceiling level and skirting details all have to be resolved in advance.
- What has to sit inside it? Appliances, a television, glassware, books, linen, barware. Internal fittings follow from this list, not the other way round.
If your drawing already answers these, we work from it directly. If it does not, we ask before quoting, because guessing here is the single most expensive mistake in joinery procurement.
Step 2: Turn the design into a dimensioned elevation
From the concept we produce a scaled elevation showing module widths, shelf heights, drawer stacks, and where open bays change into closed cabinets. This is the document your team should check most carefully, because it is the one that gets used for production.
On the elevation, confirm:
- Overall width and height against the finished wall, including floor finish build-up and any ceiling rebate
- The exact position of each vertical division between open bays and closed cabinets, checked against the room's own lines — door reveals, window mullions and column edges
- Which side of each opening the door hinge sits on, and whether a drawer or shelf is behind it
- Clear opening heights where you intend to store tall items, plus the thickness of the shelf itself
- Shelf depth where the unit meets a walkway, so an open bay does not narrow a circulation route
- Shadow gaps and trims — how the unit meets wall, ceiling and floor, and whether scribes are exposed or concealed
- Handle strategy: handleless grooves and push mechanisms change the visible line of the front more than most people expect
Mark corrections on the drawing itself rather than in an email summary. A written comment such as "shelves a bit higher" can be read two ways; a dimension on a drawing cannot.
Step 3: Reconcile the drawings with what the site is doing
Design drawings describe an ideal room. Site conditions describe the real one, and the gap between them is where coordination work happens. This is also where our project design coordination service earns its keep — drawings, production coordination and on-site guidance handled as one process instead of three separate handovers.
Site items to close out before production starts
| Item | Why it affects the unit |
|---|---|
| Wall flatness and out-of-plumb runs | Determines scribe widths and whether a run must be split into more modules |
| Floor finish level and threshold details | Sets the datum for overall height; a floor build-up that differs from the drawing shifts every vertical dimension in the run |
| Skirting, architrave and cornice lines | Decides whether carcasses are cut around them or run over them |
| Switches, sockets, thermostats, data points | Fixed positions either get cut into a closed panel — which weakens it and shows the cut line — or the layout moves around them |
| Lighting circuits for lit niches and shelves | Wiring, drivers and access must be in the ceiling or wall before the unit goes up; retrofitting means visible trunking |
| Door and drawer swing paths | Room doors, adjacent cabinetry and traffic aisles all constrain which fronts can open fully |
| Service access and inspection points | Anything the building needs to reach later must stay reachable — plan it into a removable section |
| Lift, stair and doorway clearances at the destination | Governs maximum module size and whether the composition is delivered as one run or several |
Where a site condition contradicts the design intent, we raise it early with an alternative drawn on the elevation rather than silently adjusting. A changed module width is a small decision at drawing stage; discovering it at handover is not.
Step 4: Fix finishes against real conditions, not swatches alone
Open and closed fronts in the same composition are usually specified in one finish, which is exactly why mismatches stand out. A veneer or lacquer that matches under showroom lighting can separate visibly once it sits beside a window. We therefore ask for:
- The light source you will actually have: colour temperature, dimming levels, and how much daylight the wall receives through the day
- Adjacent fixed finishes — flooring, stone, glass, metal — so fronts are judged against them rather than in isolation
- Samples reviewed on site or in a mock-up where the project has several rooms of the same type
For hospitality and multi-unit villa work, agreeing the finish once against a representative room prevents each unit from being re-litigated separately. Our custom and OEM service covers bespoke finishes, textures and material choices across wood, metals, engineered stone and laminates, so the open and closed parts of a wall can be built in one specification rather than matched after the fact.
Step 5: Plan delivery and installation around the sequence of works
A made-to-measure wall unit arrives late in the programme, so it inherits whatever the trades before it left behind. Our workflow runs consultation, design and planning, production, logistics, installation and after-sales as one chain, which means the coordination conversation happens while changes are still cheap.
- Logistics. Freight by sea, air or rail with customs paperwork, packaging and container loading planned around the site's access route rather than the other way round. Confirm import terms, duties and delivery scope for your destination case by case.
- Sequencing. Wet trades, floor finishes, painting and lighting need to be complete and dry before a fitted unit goes up. Book the unit against the real programme, not an optimistic one.
- Installation and snagging. On-site installation followed by inspection with your team, so alignment, door adjustment and finish condition are signed off together instead of discovered separately.
Warranty terms, response times and installer availability vary by project and destination. We set those out in the contract for your specific job rather than quoting marketing figures, so what you are agreeing to is verifiable.
A short coordination checklist
Send us these and the shop drawings come back tight
- Scaled elevations of the wall, with finished floor and ceiling levels
- A room layout showing door swings and circulation
- Fixed positions for services, switches and lighting circuits
- The storage brief — what goes in, what stays on display
- Finish references plus the adjacent materials they sit against
- Your programme dates for site readiness and handover
Send your drawings through our contact page and we will return a dimensioned elevation with the conflicts flagged, so your team settles them on paper before a single panel is cut.