A six-metre swim spa is not a catalogue item you simply drop into a container. It is a shell, a pump set, a filtration circuit, an ozone system and a lighting loop that all have to arrive working, and arrive together. The Outdoor Swim Spa WS-PC06CH sits in our configurable outdoor swim and hydrotherapy range, and buyers keep asking us the same handful of questions about it: what is actually included, what has to be arranged on site, and how the order moves from an enquiry to a delivered shell. This article walks through that process from the manufacturer's side, so you can brief your team properly and avoid the change orders that usually surface after production has started.

What the WS-PC06CH specification actually covers

Before comparing quotations, it helps to know which numbers are fixed by the model and which ones depend on the configuration you choose. The published catalogue figures for this model are:

ModelWS-PC06CH
Catalogue dimensions6000 × 3000 × 900 mm
Control system1 set
Water pump2 pcs
Filter pump1 pc
Jet total38 pcs
LED lights1 pc
Total power3.25 kW
Features shownWater jets, LED lighting, Ozone
Swim training systemNot listed for this model

Two lines in that table matter more than they look. The jet count and pump set define how the spa feels in use: 38 jets fed by two water pumps is a hydrotherapy-first layout rather than an exercise-first one. If your client's brief mentions counter-current swimming, the swim-training variants in the same range are where to look — our Outdoor Swim Spa WS-PC06ST is the nearest comparison at a similar overall length, and it lists a swim training system with a different jet count, lighting arrangement and total power. Comparing two models on those four lines — jets, pumps, swim system, power — tells you far more than comparing photographs.

The catalogue also lists options rather than one fixed build. Control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps are all available, but availability and compatibility vary by model. Treat each of them as an open decision in your enquiry, never as something included by default.

Start the enquiry with the site condition, not the product code

The most common cause of delay on a swim spa order is that the buyer specifies the unit first and discovers the site constraints afterwards. Send your manufacturer four things before you ask for a price:

  • Foundation and access. Confirm the prepared slab or plinth against the 6000 × 3000 mm footprint, plus the route from the delivery vehicle to the final position. A shell that fits the pad but not the gate becomes a site works problem, not a manufacturing one.
  • Power supply. State the supply available at the location — phase, voltage and frequency — and ask for the electrical requirement of the configuration being quoted. The 3.25 kW figure is the catalogue total power for the standard build; adding a heat pump changes the load, and whoever wires the site needs the correct number before cable is ordered.
  • Drainage and plant access. Confirm where drainage connects, and check that the filter pump and ozone equipment stay reachable for servicing once the surround is built.
  • Usage pattern. Year-round outdoor use in a cool climate is a different insulation and heat pump conversation from a covered terrace used seasonally. Say which one you are buying for.
One discipline makes quotations genuinely comparable: send every supplier the same four site facts. With the site conditions fixed, price differences start to show up as real differences in equipment rather than hidden gaps in scope.

Lock the configuration in writing before production starts

Once the model is settled, the specification sheet should record each option explicitly: whether UV sterilisation is fitted, which heat pump if any, whether sand filtration replaces the standard filter arrangement, the insulation package for shell and base, and the style and position of the steps. Confirm the jet layout, control system location and LED arrangement too, because those are the items a buyer tends to notice only after installation.

Ask for a configuration sheet you can sign off — model code, dimensions, equipment list and total power. That document carries through production checks, customs paperwork and commissioning, and it is what protects you if a component is substituted during a busy season. Where a project needs a non-standard geometry rather than the catalogue footprint, we also build customizable shape outdoor spas in square, round, oval and curved layouts with an acrylic shell; that is a separate quotation with its own drawings.

Use the manufacturer's project services instead of rebuilding them locally

In practice a swim spa is one line in a much larger procurement. On villa and hospitality projects it arrives alongside outdoor furniture, bathroom ceramics, lighting, cabinetry and wall finishes, all needed on the same site within the same window. Coordinating those separately means separate drawings, separate containers and separate installation crews.

SANTERSON works as a one-stop furniture and building materials supplier for project customers, so the swim spa is handled inside the same workflow as the rest of the package: design consultation and space planning, material and product specification, manufacturing with quality control, project management and site coordination, then installation and handover. Our custom and OEM service covers bespoke finishes, prototyping and flexible order quantities when the spa surround, adjacent cabinetry or deck detailing has to match. Our logistics and door-to-door delivery service covers freight forwarding by sea, air and rail, packaging and container loading, customs documentation and shipment tracking — relevant for a heavy shell travelling with loose pump and filtration components. Our installation and after-sales support covers on-site installation, inspection and snag lists, spare parts and ongoing maintenance.

For Australian projects we have published villa project references in Willoughby, Perth, North Turramurra, Melbourne and Sydney. Import terms, duties, Incoterms, insurance, transit time and the point at which our delivery responsibility ends are confirmed case by case against your own freight arrangements — ask for them in writing on your quotation rather than inferring them from a brochure.

What to check before the unit leaves the factory

  • Configuration match. Check the equipment list line by line against the signed-off sheet: pump quantities, jet count, control system, ozone unit and LED quantity.
  • Electrical data plate. Confirm the rating on the unit matches the supply you specified for the site, including any heat pump added during production.
  • Shell and finish condition. Photograph the shell and finishes before packing, so any transit damage can be identified against a known pre-shipment state.
  • Packing and loading plan. Ask how the shell, pumps, filtration unit and steps are packed and where they sit in the container. That decides what your site team unloads first and whether lifting equipment is needed on arrival.
  • Spares and documentation. Confirm which spares ship with the unit, together with wiring diagram, control system manual and commissioning notes for your installer.

What to put in your first enquiry

A useful reply needs a useful brief. Send the model reference, the four site facts, the option list you want priced, the quantity and the target installation month. For a WS-PC06CH enquiry that means naming the 6000 × 3000 × 900 mm footprint, stating whether a heat pump and UV sterilisation are required, confirming the supply available on site, and saying explicitly whether counter-current swimming is in scope — because if it is, this model's catalogue does not list a swim training system, and you should be quoted a variant that does.

Send us the model reference and your site conditions and we will return a configuration sheet with equipment list, total power and delivery options for your project. Contact our project team to begin.