A linen cabinet is one of the smallest items on a bathroom or laundry schedule and one of the most frequently re-worked. The reason is rarely the joinery. It is that the enquiry reaching the factory carries a single number - usually a height - and no information about what the cabinet has to hold, where it stands relative to other fixtures, or how it meets the wall, floor and ceiling around it. This article sets out the measurements and project inputs that let us price and build a tall storage unit once, correctly.
Why linen cabinets get mis-specified so often
Tall bathroom storage sits in awkward places: the gap beside a door opening, the return wall behind a toilet, the recess left between a vanity and a shower screen. Those gaps are created by other trades, and their dimensions drift. A cabinet ordered against an early drawing, before the floor build-up and wall finishes were resolved, is a common cause of a unit that arrives on site and does not drop into place.
Our Linen Cabinets sit within the Tall Cabinets collection and are made to measure rather than offered in fixed widths and heights. That flexibility removes the need to compromise on the opening you have, but it moves the responsibility for accuracy onto the information supplied with the enquiry. The checklist below is what we ask project buyers, contractors and designers to send.
The measurements that matter
| Input | What to record | Why it changes the build |
|---|---|---|
| Clear opening width | Finished-to-finished width at three heights - top, middle, bottom | Walls are rarely parallel. Three readings tell us whether the carcass is square or whether one side needs scribing to the wall. |
| Available height | Floor finish level to ceiling, and to the underside of any beam, pelmet or bulkhead | Determines whether the unit is a full-height fitted piece or a free-standing cabinet with a gap above. |
| Depth at the wall and at the face | Usable depth, plus how far the unit may project past the finished wall line | Governs shelf spacing, door swing clearance and whether a handleless front is workable in a narrow passage. |
| Door and fixture clearances | Arc of the room door, position of the WC, basin, towel rail and any radiator | A door that clashes with the cabinet front is a site problem nobody notices until handover. |
| Floor build-up | Screed, waterproofing and finish thickness, and whether the floor is levelled or tiled to a fall | Affects plinth height, toe-kick detail and whether the cabinet sits on an adjustable base. |
| Wall construction | Stud, brick, block or tiled substrate, and where noggins or services sit | Fixing method for a wall-fixed tall unit must be designed around the substrate, not decided on site. |
| Room humidity and ventilation | Whether the room has an extractor, a window, or is internal and unventilated | Feeds the board and finish selection for a bathroom that goes from hot and wet to dry between uses. |
The project inputs beyond dimensions
Dimensions define the box. The following define how the unit is used, and they belong in the same enquiry.
What the cabinet has to hold
"Linen storage" covers several different briefs. Bath towels stacked vertically need a different shelf pitch than bathrobes hung on internal rails, and neither suits a unit specified for detergents, irons and hoovers. Tell us the contents by category and we set the interior layout: adjustable shelving, pull-out baskets, an internal rail section, or a shallow top shelf for spare stock, instead of defaulting to equal bays.
Open, closed or mixed fronts
Closed fronts hide stock and hold a clean line in a corridor or guest bathroom. Open shelving reads lighter in a small room and keeps towels within reach, but exposes whatever is stored. Many projects split the unit: closed below, open display niches at eye level. Where we are specifying across a whole apartment floor or villa, we usually keep one carcass language and vary the fronts by room.
Finish continuity with adjacent joinery
A tall unit that matches the floating vanity, the wardrobes and any laundry cabinetry reads as built-in; the same cabinet in a close-but-not-matching finish reads as furniture. When you send the enquiry, include the panel code, veneer species, lacquer sheen or laminate reference already used elsewhere in the project, together with the door style. Where no reference exists yet, we can propose finishes from our material range and issue samples for approval before production.
Hardware and operation
Hinged or sliding fronts, handleless or handled, soft-close or standard, integrated lighting in an open bay: each choice affects the clearance envelope and the price. Sliding fronts save swing space in a tight passage but need track depth. Handleless profiles need finger clearance at the door edge. Specify these with the room's traffic pattern in mind, not as a late substitution.
For a multi-unit project, send one typical dimension per bathroom type rather than a unique set for every room. We build from repeated types and flag only the exceptions, which keeps finishes and delivery batches aligned across the schedule.
How to measure and submit a reliable enquiry
A workable submission takes a short visit to site and prevents most re-work:
- Photograph the position square-on, with a tape in frame, from two directions.
- Send a simple sketch or marked-up plan showing the cabinet outline against the door swing, WC and basin.
- Record finished levels, meaning where the floor finish and ceiling will sit after other trades complete, not the current slab.
- List the intended contents by category, so the interior layout follows from use.
- Name the finish reference and door style used on adjacent joinery, with the supplier or project code where possible.
- State the installation sequence: whether the cabinet goes in before or after tiling, and who fixes it to the wall.
If a site is still at frame stage, send the drawing dimension plus the intended build-up, and we will show the resulting clear opening so you can confirm it before we cut anything.
How this fits into a wider fit-out package
Linen cabinets are rarely ordered alone. In villa and apartment work they arrive in the same batch as vanities, wardrobes, laundry cabinetry and kitchen units, all specified to measure against the same drawings. Ordering them together means one set of finish approvals, one production run and one coordinated delivery, which is simpler on site than chasing separate suppliers for each room.
Related pieces in the same collection are worth specifying at the same time: open shelf tall cabinets for display and everyday towel access, utility tall cabinets where the brief is equipment rather than linen, and multi function tall cabinets for laundry integration. Send us the room schedule and we will confirm which type suits each position.
Frequently asked questions
Can a linen cabinet be made to a non-standard height?
Yes. The range is made to measure, so heights and widths follow the actual opening rather than a catalogue increment. Full-height fitted units to the ceiling are common in new work; free-standing heights suit renovation where the wall above is already finished.
Should the unit be fixed to the wall or free-standing?
It depends on the substrate and the height. A tall, narrow unit that reaches near the ceiling should be positively fixed, and the fixing detail follows the wall construction you send us. Where tiling is complete and we cannot penetrate a waterproofed floor, we design a concealed wall fixing instead.
Which interior layout do you recommend by default?
None. The contents decide it. Adjustable shelving suits mixed stock; an internal rail section suits robes and freshly pressed linen; pull-out baskets suit small items that get lost at the back of a deep shelf. Send the brief and we will propose the layout with the quotation.
What if my site dimensions change after ordering?
Because the units are made to measure, revised dimensions can be absorbed up to the point production starts on that item. That is why we ask for finished levels rather than structural ones: a cabinet built to a slab dimension may not survive a floor build-up decision made later.
SANTERSON manufactures custom cabinetry and interior fixtures in China for villa, apartment and hospitality projects, with made-to-measure sizing, material and finish options, and layouts tailored to each space. Send your room schedule, opening dimensions and finish references, and we will return a specification and quotation for review before production begins.