The Outdoor Swim Spa WS-S07B sits in the middle of our 7-metre swim-and-hydrotherapy range, and almost every unit we ship is configured differently. That is why we do not publish a fixed price list: the number on the quotation depends on the equipment set, the site conditions and the delivery destination. This guide walks buyers, contractors and project managers through exactly what to send us so that the quote for this model comes back accurate and complete the first time.
What WS-S07B Includes as Standard
Before you request pricing, it helps to know what the catalogue specification already covers. The published figures for this model are:
| Item | Catalogue value |
|---|---|
| Overall dimensions | 7000 × 2200 × 1335 mm |
| Jet total | 48 pcs |
| Water pump / filter pump | 3 pcs / 1 pc |
| Control system | 1 set |
| Lighting | 3 LED lights plus 26 small LED lights |
| Total power (as listed) | 13.35 kW |
| Features shown | Water jets, LED lighting, Ozone, Waterfall |
Two details in that table change the price more than anything else. First, this variant is built around a jet and waterfall layout rather than a counter-current swim trainer; if your brief calls for lap swimming against a current, the close version of this model carries a swim training system instead, with a different pump set and a lower connected load. Tell us which function you need and we will confirm the right model code before quoting.
Second, the total power figure is the catalogue value for the standard equipment set. Add a heat pump, change the pump arrangement or upgrade the filtration, and the load moves with it. We therefore treat electrical data as something to be agreed during quotation, not assumed from the brochure.
Information We Need to Price This Model
Send the following six items and we can return a firm, itemised quotation. Missing information is the single most common cause of a quote coming back as a range instead of a number.
- Configuration. Confirm whether you want the jet-and-waterfall layout or the swim-training layout, and list the options you are considering. Our catalogue options for this range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability differs by model, so we check compatibility rather than promising every add-on.
- Site conditions. Above ground, semi-recessed or fully recessed; concrete slab, deck or plinth; the clear access route for delivery and crane or forklift needs. A 7000 mm shell on a narrow terrace is a very different job from the same shell on an open lawn.
- Services available on site. Available supply capacity, single or three phase, earthing arrangement, drainage point and distance to the plant room. Our engineers match pumps, heating and controls to what your electrician can actually deliver.
- Quantity and programme. A single villa unit and a resort block of ten are quoted on different terms, and production slots follow your required on-site date.
- Delivery address and Incoterms. Door or port, and who is handling customs. Our logistics and door-to-door delivery service covers freight forwarding, packing and container loading, export paperwork and tracking; import duties and local site works are quoted separately because they vary by country.
- Drawings or photographs. Any landscape plan, section drawing or even phone photos of the position speed up the review considerably and let us flag problems before production starts.
How the Quotation Is Prepared
Enquiries for this range go through our project team rather than a sales desk. The sequence follows the workflow we use across all turnkey solutions:
- Specification review. We confirm the model code, the option list and the electrical load against your site data, and we tell you where a catalogue figure will change with your configuration.
- Itemised pricing. You receive the shell and equipment set, each selected option, packing, and freight quoted as separate lines, so substitutions are easy to price up or down without re-doing the whole document.
- Detail confirmation. Before production we issue layout and connection details for your engineer to approve — pump positions, access for maintenance, drainage and power entry.
- Production and inspection. The unit is built to the approved specification and photographed before packing. Where a project calls for matching finishes elsewhere on site, we coordinate it with our wider furniture and building materials programme instead of leaving it to a third party.
- Delivery and after-sales. Shipment tracking runs through to arrival, with installation guidance and spare-parts support after handover under our installation and after-sales support.
Questions Buyers Ask Before Committing
Can the shell be built to a non-standard size?
Yes, within reason. Our customizable shape outdoor spa programme covers square, round, oval and curved shells with structural reinforcement designed around the finished geometry. Non-standard dimensions are quoted as custom work, so allow more lead time than a catalogue model.
Can the swim spa be matched to other outdoor products on the same project?
This is where being a single manufacturer helps. Poolside loungers, pergolas and hardtop gazebos, outdoor dining and lounge sets, paving-adjacent screens and exterior cladding can all come from the same production programme and ship on one consolidated consignment. Ask for it at the enquiry stage — coordinating later costs more than planning it in.
Do you supply to resort and hotel projects as well as private villas?
Yes. Hospitality work brings additional questions — plant capacity, maintenance access, spare-parts holdings and phased delivery across room blocks. Send the room schedule or landscape masterplan and we will price against that rather than guessing.
Ready for a Number?
Send us the model code, your configuration list and the site photographs, and we will come back with an itemised quotation covering product, options, packing and freight. If you are comparing several models in this range, say so — we will put the specifications side by side so the difference in jet count, pump set and connected load is clear before you choose.