A quotation for solid color acrylic cabinets usually comes back slow for one reason: the supplier is still guessing. Acrylic fronts are made to measure, so an accurate price depends on drawings, finish selection and hardware choices that only you can confirm. Send the items below in your first enquiry and you will normally receive a workable quotation much faster, with fewer revision rounds.
1. Room dimensions and a layout drawing
Our cabinets are made-to-measure, so we need the wall run rather than a nominal kitchen size. Please send:
- Overall length of each wall the cabinets sit on, plus room height
- Positions and heights of windows, doors, skirting and any bulkheads
- Location of existing water supply, waste, gas points and power outlets
- Ceiling level, and whether the run is straight, L-shaped or U-shaped
A hand sketch with measurements is enough to start. A CAD or plan-view drawing from your designer or builder lets us price the full layout in one pass, including corner units and tall cabinets.
2. The finish you actually want
"Acrylic" covers a range of surface treatments, and each is quoted differently. Tell us which direction you are working towards:
- Solid colour — one flat tone across the fronts, in a gloss or low-sheen surface
- High gloss acrylic — reflective fronts that bounce light around a compact kitchen
- Matte acrylic — soft, low-reflection fronts for contemporary schemes
- Two tone acrylic — a darker base run paired with lighter wall units
Send a colour reference where you have one: a paint or laminate code, a sample photo, or a physical swatch posted to our factory. Where a project needs an exact match to an interior palette, we produce from your approved reference rather than from a screen image, because monitor colours shift from device to device.
3. Carcass, door and edge details
The front is only half of the panel. Confirm with us:
- Carcass colour and board thickness for the cabinet boxes
- Door style — flat slab, or a routed/shaker profile if you want a framed look
- Edge treatment on visible returns, and whether handles are used at all
- Whether appliances are integrated behind matched fronts or freestanding
If you prefer a handleless look, say so at the enquiry stage. Profile and hardware selection change both the panel build and the price, so deciding early avoids a re-quote.
4. Internal fittings and appliances
Interiors drive cost more than most buyers expect. Let us know what goes inside:
- Drawers versus doors, and soft-close requirements
- Corner solutions, pull-out larder or pantry units, tall oven housing
- Integrated fridge-freezer, oven, dishwasher or wine storage
- Worktop material and thickness, plus splashback if required
Send appliance model numbers where they are already selected. Cut-outs and ventilation clearances come from those models, and matching them to the carcass before production prevents site modifications later.
5. Quantities, project type and destination
Finally, the commercial details that let us quote properly:
- Number of kitchens or apartments in the order, and whether it is one-off or repeat
- Project type — owner-occupied home, apartment development, villa or hospitality fit-out
- Delivery address and preferred shipping terms (port-to-port or door-to-door)
- Target installation date, so production can be scheduled around it
As a one-stop furniture and building materials supplier, we also produce wardrobes, vanities, wall panelling, doors and lighting to the same finish references. Where a project benefits from matching acrylic fronts across kitchen and bedroom joinery, tell us at quotation stage — combining those items in one order simplifies production coordination and container loading.
What you receive back
With the above in hand we return an itemised quotation by cabinet module, with sizes, selected finishes, hardware and internal fittings listed line by line. That breakdown lets you compare options honestly — for example a gloss front against a matte front, or drawers against doors — instead of accepting one lump-sum figure.
If you would like a quotation for an upcoming kitchen, send your drawings and finish references through our contact page, and we will confirm dimensions and specifications with you before production begins.