A decorative moulded paneled wardrobe looks simple on a drawing: a door with a profiled frame and a raised or recessed centre panel. On site it is one of the most approval-sensitive items in a bedroom fit-out, because the moulding reads differently under light than a flat slab door, and every party on the project has an opinion about it. This guide sets out who signs off what, in which order, for decorative moulded paneled wardrobes supplied as made-to-measure built-in furniture.

Why This Wardrobe Type Needs a Different Approval Path

Flat-panel cabinetry can be approved from a specification line alone: colour code, edge detail, handle type. Paneled doors carry three variables that a colour code cannot capture — the profile of the moulding, the width and proportion of the stiles and rails, and the way the panel sits relative to the frame. Two projects can order the same finish and still look completely different once the profiles differ.

Santerson Decorative Moulded Paneled Wardrobes sit within the Classic Paneled Wardrobes collection and are made for residential wardrobe projects, with sizing, material, finish and layout specified per project. That flexibility is exactly what creates approval risk: a decision that is not recorded in writing tends to be resolved later by whoever is standing in the room when the units arrive.

The practical answer is to split approvals into four gates — design, sample, shop drawing and delivery — and assign one named owner to each gate before production starts.

Gate 1: Design Approval (Scope, Layout, Style Direction)

Owner: interior designer or design lead, countersigned by the client representative. For villa and apartment projects, this is also where the procurement manager confirms that the wardrobe package sits inside the approved budget line.

Approve at this gate: room-by-room wardrobe locations, door style family (moulded paneled versus flat or shaker), opening type (hinged, sliding), finish direction, and which rooms get premium detailing. Do not approve at this gate: exact dimensions, hardware model, panel construction.
  • Issue one drawing set per room, not a single generic elevation. Wardrobe proportions read against ceiling height and skirting, so a shared detail gets misread across units.
  • Record the reference image or product page used for the style direction in the design register. For this collection, that is the published product page plus any project-specific mood board.
  • Confirm the interface with adjacent finishes — flooring, wall panels, cornice and lighting — because moulded doors clash with trim profiles more visibly than flat doors do.
  • If the same wardrobe family also appears in the kitchen or media wall package, note that cross-reference now. Cabinetry families such as classic paneled solid wood wardrobes and matching shaker or raised-panel doors are usually approved as one style group, not item by item.

Gate 2: Sample Approval (The Gate Most Projects Skip)

Owner: design lead plus client representative. Procurement keeps the signed sample; production keeps the photograph and the written sign-off sheet.

For moulded paneled doors, request a door sample rather than a finish board only. A finish board shows colour; a door sample shows the profile depth, the radius of the moulding, the reveal between panel and frame, and how the edge is finished. That is where disputes actually start.

  • Approve the sample under the same lighting condition as the room: warm LED downlights, daylight from the window side, and the corridor light that hits the doors at an angle.
  • Sign the sample sheet with three items — finish name, profile reference, and a note on sheen. Photograph it next to the approved flooring and wall finish so the comparison survives handover.
  • Keep one physical sample in the project file until handover. It is the fastest way to close an argument at snag stage.
  • Where finishes come from a broader range — matte lacquer, high gloss, wood veneer, melamine — approve only what will actually be installed. Unused approved options create substitution requests later.

Gate 3: Shop Drawing Approval (Dimensions and Interfaces)

Owner: contractor or site project manager, with the design lead reviewing appearance-critical dimensions. This is the gate that protects the budget.

Item to verifyWho checksWhy it fails later
Finished wall-to-wall dimensions taken on site, not from architectural drawingsSite project managerTolerances in plaster and flooring change the opening by several millimetres
Internal layout: hanging rail heights, drawer bank positions, shelf spacingClient representative or end userStorage expectations differ between master and secondary bedrooms
Door swing clearance against beds, doors and skirtingDesign leadHinged doors need clearance that a plan view hides
Skirting, cornice and architrave treatment at the wardrobe lineSite project managerScribing detail is decided on site if it was never drawn
Integrated lighting, mirrors or glass inserts, if anyElectrical contractor and design leadWiring must be in before the carcass goes up
Fixing method to wall and floor, and access route to the roomInstallerOversized panels cannot always be carried through the stairwell or lift

Return the shop drawings for a single consolidated comment round. Multiple open-ended rounds are what push wardrobe orders past their production window.

Gate 4: Delivery, Installation and Snag Approval

Owner: site project manager for delivery condition and installation, design lead for appearance, client representative for final handover.

  • Check the packed units against the signed shop drawing numbers on arrival, before the installation crew opens everything.
  • Install one room first as a pilot. Fix any profile, reveal or scribing issue there before the remaining rooms are opened.
  • Run the snag list against the approved physical sample, not memory: sheen, panel reveal, moulding joints at the corners, door alignment.
  • Record sign-off per room with photographs. For multi-unit residential and villa projects this keeps warranty requests specific and short.

A One-Page Approval Register That Actually Works

Keep one register per project with these columns, and refuse verbal approvals:

ColumnContent
Unit codeRoom and wardrobe reference matching the shop drawing numbering
GateDesign / sample / shop drawing / delivery
Named approverOne person per gate, with an alternate
Date and versionDrawing revision number plus sign-off date
Open itemsAnything deferred, with a hard cut-off date before production release

Two rules keep this register alive. First, no item moves to the next gate while an open item exists on the previous one. Second, any change after shop drawing approval is logged as a variation with its cost and lead-time impact stated in writing — paneled doors that are re-cut late rarely get the same batch consistency.

How a Manufacturing Partner Reduces the Approval Load

Approval effort scales with how many parties have to interpret the same product. A supplier that handles design coordination, made-to-measure production and site guidance in one chain reduces the number of hand-offs where details get lost. Santerson works as a China-based furniture and building materials manufacturer on villa, hospitality and office projects, offering custom and OEM service covering bespoke finishes, prototyping and project-specific dimensions, with interior design and project coordination services spanning layout planning, drawings, production coordination and on-site guidance.

For projects outside China, the same supplier also handles logistics and door-to-door delivery, so the wardrobe package arrives with the rest of the joinery rather than as a separate import that nobody on site is tracking. Published project references include villa fit-outs in Willoughby, North Turramurra, Sydney, Melbourne and Perth, Australia.

Before you place a paneled wardrobe order, ask the supplier for: a physical door sample with the profile reference; a shop drawing round priced into the quotation; confirmation of the panel construction and finish system they will actually use; and the packing and delivery sequence by room. Get all four in writing.

Frequently Asked Questions

Who has final say on the moulding profile?

The design lead, based on the approved physical sample. Procurement confirms price and lead time; the site manager confirms fit. If three parties each hold a different reference image, agree on one before the order is released.

How many approval rounds are normal?

One design round, one sample round, one consolidated shop-drawing round, and one snag round. More than that usually means an item was approved verbally rather than in writing.

Can secondary bedrooms use a different profile from the master?

Yes, and it is common for budget reasons. Record it as two separate unit codes with two sample sign-offs, so the difference is intentional rather than discovered at installation.

What happens if a finish is discontinued mid-project?

Approve a named fallback finish at the sample gate. Substitutions approved under time pressure are the most common cause of mismatched paneled doors between rooms.

Send your room list, ceiling heights and preferred profile direction, and the wardrobe package can be quoted against a clear approval plan instead of an open-ended drawing set.