An arched French door is one of the few openings in a villa or hospitality project where the drawing, not the catalogue, decides the price. Santerson Arched French Doors are listed as made-to-measure work, with finish, layout and dimensions specified to suit each space — so a supplier cannot return a useful number from a room name alone. The list below is what our estimating team works from, and sending it in one enquiry usually turns a vague reply into a firm quotation you can put into a budget.
1. Openings, not descriptions
Send the structural opening for every unit: clear width and clear height to the nearest millimetre, plus the finished floor level so we know where the sill sits. Arched work needs the geometry of the curve as well — the internal radius, whether the arch is a full semicircle or a segmental curve, and whether the arch head is fixed glass or an operable leaf above the doors.
A simple marked-up elevation per opening does more than a paragraph of text. If your drawings are still developing, send what exists and mark the units as provisional; we will flag which dimensions have to be site-verified before production starts.
2. Quantity, schedule and phasing
A door schedule listing each opening reference, quantity and hand or swing direction lets us price the set as a set. Where the same detail repeats across floors or villas, say so up front — repeat units are what make consistent unit rates possible. If the site will take doors in stages, say so too; phased release changes how we plan production and consolidation.
3. Material, finish and hardware intent
Our product pages describe configurable material and finish options rather than a fixed specification, because the same arched profile can be built to different briefs. Tell us the frame material you want, the finish or colour reference, glazing type (clear, low-iron, patterned, double-glazed), and whether glazing bars are true divided lights or applied. Hardware intent matters too: handle style, lock requirement, hinge type and whether leaves need to fold or stack back.
Where the design calls for a bespoke detail rather than an existing one, our Custom Furniture Manufacturer service covers prototyping, material selection and finish samples before full production.
4. Interface and site conditions
Doors rarely fail on their own; they fail at the junction. Note what surrounds each opening — masonry, steel frame, timber stud or an existing reveal — and who is responsible for the head detail, threshold, arch infill and any architrave or panelling return. If a floor finish height is not yet fixed, we will design the sill to suit on site rather than guess it.
5. Delivery terms and destination
Give us the delivery address, whether goods go to a builder's compound or direct to each unit, and your preferred Incoterm. We arrange freight by sea, air and rail with customs paperwork and door-to-door delivery, so tell us who is acting as importer of record and what documents you need with the shipment. Doors are bulky and glass-backed, so packing method and container loading plan are part of the quotation, not an afterthought.
6. Programme dates
State the date doors must be on site and work backwards from your frame-fix and floor-finishing sequence. A realistic on-site date tells us which openings to run first and whether any detail needs a sample for approval before the main batch is released.
7. Drawings and visual references
Attach whatever exists: architectural elevations, door schedule, section through the arch head, and reference images of the look you are after. For projects where the interior is still being resolved, our Interior Design Services team handles space planning, furniture layouts and 3D renderings, and coordinates drawings with production so the door detail matches the surrounding joinery and wall finishes.
8. Budget band and comparison points
A budget range is useful even when it is approximate. It lets us propose a specification that lands inside it instead of quoting one option and leaving you to guess. If you are comparing us against another quotation, send the competing specification — material build-up, glazing and hardware included or excluded — and we will compare like for like rather than argue about price.
9. Who signs off
Name the architect, builder and client representative who approve shop drawings, and confirm how approvals are returned. We release production on made-to-order joinery once a signed setting-out drawing is in hand, so an unclear approval route tends to be what pushes dates.
What you get back
With the above in one enquiry, expect a priced schedule per opening reference, a specification sheet stating frame build-up, glazing and hardware, packing and freight options, and a production plan tied to your dates. Anything still missing is listed as an assumption on the quotation rather than buried in it, so you can see exactly what would change the number.
Send your enquiry
If your project needs arched doors alongside other joinery — our Santerson Modern Slim Frame French Doors cover the slimmer sightline detail — send the schedule and drawings through our contact page. We quote from the documents you have; gaps come back as questions, not padded into the price.