Open shelving looks simple on a drawing. A frame, a few shelves, a wall fixing — and then it arrives on site with the wrong depth, a finish that does not match the joinery package, or a load rating nobody confirmed. If you are specifying Santerson Metal Frame Shelves for a bathroom, villa or hospitality fit-out, this guide walks through exactly what to verify before you place the order, and what SANTERSON's configuration process actually covers.

What the product actually is

Santerson Metal Frame Shelves sits in the Open Shelving collection. It is a configurable metal-frame shelving unit for residential bathroom projects, where finish, layout and dimensions are specified per space rather than chosen from a fixed catalogue size. That single sentence matters more than it sounds: you are buying a made-to-measure item, not an off-the-shelf one, so the quality of your enquiry determines the quality of what arrives.

The same configurable logic runs through the wider shelving range. Santerson Freestanding Open Shelves covers spaces where a wall fixing is not possible or not wanted, and Santerson Metal Frame Modular Systems extends the metal-frame approach into full wall systems when you need storage across an entire wall rather than a single unit. Deciding which of the three your drawing calls for is step one; the checks below apply to all of them.

Before you enquire: get your own numbers right

A made-to-measure quotation is only as good as the dimensions you send. Before contacting the supplier, confirm from the setting-out drawing:

  • the finished wall line — not the structural wall — including any tiling, waterproofing or plasterboard build-up
  • clear height and clear width at the fixing position, with the position of outlets, towel rails, shower screens and door swings marked
  • shelf depth you actually need for the items being stored, plus clearance in front for access
  • the intended load per shelf: glassware and light accessories behave differently from towels, linen or stone vessels
  • the substrate behind the finish — masonry, stud wall with noggins, or glass — because it dictates the fixing method

Send dimensions in a single unit system and state which are maximums and which are targets. Buyers who send both a drawing and photographs of the completed wall almost always get fewer clarification rounds than buyers who send a number alone.

The specification points to lock down

SANTERSON's product page lists made-to-measure sizing, material and finish options, and a layout tailored to the project. It does not publish a fixed frame profile, a shelf thickness or a load table for this item, so treat those as open questions to close in writing rather than assumptions. For each unit, ask the supplier to confirm:

  • frame material and finish, with a physical sample or a named finish reference matched to your joinery and ironmongery schedule
  • shelf material — glass, timber-look, lacquered board or metal — and the edge treatment on visible faces
  • span between supports and the load the shelf is rated for at that span
  • fixing method and whether any reinforcement is required in the wall before the unit is installed
  • how the unit behaves in a wet zone: bathroom shelving sits near splashing, so ask what finish is recommended for that exposure rather than assuming all finishes are equivalent

If your project mixes shelving types — for example glass shelves in one bathroom and metal-frame units in another — put every variant on one schedule with a unique reference per room. It keeps the quotation comparable and stops near-identical items being ordered twice.

Reading the quotation properly

Compare quotations line by line, not by headline total. Two quotations for "metal frame shelves, 900 mm" can differ in frame section, shelf thickness, whether wall reinforcement is included, and whether installation hardware is supplied or left to the site contractor. The points that most often move price on shelving are:

  • quantity across the project — shelving is usually ordered as part of a larger bathroom or fit-out package, which changes how it ships
  • finish consistency: matching one finish across wardrobes, vanities and shelving means one material run rather than several
  • packaging for shelf panels, which are large, flat and the first items to chip in transit
  • what is included at delivery — see the next section

SANTERSON describes itself as a China-based furniture and building materials manufacturer providing one-stop project supply, operating since 2008. Its service pages cover custom and OEM production, logistics with door-to-door delivery, and installation and after-sales support. Those services are relevant to shelving because open shelving rarely fails on its own — it fails at the interface with tiling, wall preparation and site timing.

Delivery, storage and installation sequencing

Decide the delivery term before you order, not after. The logistics pages describe freight by sea, air and rail with customs paperwork and door-to-door delivery; the exact term, transit window and who handles last-mile delivery should be confirmed for your destination and put in the proforma invoice. Shelving panels travelling with a mixed container need different crating from a furniture set, so say so when the packing list is drafted.

On site, sequence shelving after wet trades and finishes are complete. Store units flat, dry and unopened until the room is handed over, then install to the confirmed setting-out. The installation and after-sales pages list on-site installation, inspection and snags, spare parts and maintenance; warranty terms, response times and installer availability vary by project and country, so get the specific terms for your site in writing rather than relying on the marketing page.

A short pre-order checklist

CheckConfirmed by
Finished-wall dimensions, both directions plus depthYour setting-out drawing
Frame and shelf finish reference matched to joinery scheduleSupplier sample or named reference
Load per shelf at the specified spanWritten supplier confirmation
Fixing method and any wall reinforcement neededSupplier plus your site contractor
Finish recommended for the wet-zone exposureWritten supplier confirmation
Delivery term, packing method and delivery addressProforma invoice
Snag and after-sales terms for this projectWritten supplier confirmation

Getting a quotation

Send the room schedule, the dimensions listed above and your preferred finish reference to the SANTERSON contact page, together with the wider bathroom or fit-out package if you are buying more than shelving. A complete enquiry produces a firm, comparable quotation; a partial one produces a round of questions and a price you cannot benchmark against anyone else's.

Used well, made-to-measure metal-frame shelving is one of the easier items in a fit-out to get right — precisely because it is small enough to correct before production starts. Do the measuring, close the load and fixing questions in writing, and let the specification rather than the photograph drive the decision.