A shaker panel wardrobe rarely fails because of the door profile. It fails because somebody measured one wall, guessed the ceiling height and left the fixing detail to the fitter on site. If you are specifying built-in wardrobes for a villa, apartment or hospitality room, the installation plan is where the money is either protected or wasted. Below is the checklist we work through with project buyers before our workshop releases a shaker panel wardrobe for production.
1. Verified site dimensions, taken twice
Made-to-measure joinery only works when the numbers come from the finished room, not from a drawing set. Record height, width and depth at several points on each wall — floor to ceiling in three places minimum — because slab, screed and plasterboard are rarely consistent across a run. Note skirting, architraves, cornices, radiators, downlights, air grilles and any door swing that will collide with a hinged wardrobe leaf.
For our shaker panel wardrobe range, sizing, layout and finish are specified per project, so the survey is the document that governs everything downstream. If a room is still in structural stage, mark the planned finished floor level and the planned ceiling finish on your drawing and confirm both before we cut.
2. Door type and clearance envelope
The plan must state how the wardrobe opens and what that opening needs in front of it. Hinged leaves need a clear swing; sliding leaves need track depth and no obstruction above the head rail; an open or walk-in layout changes the whole circulation question. Where a paneled look is required on hinged doors, paneled hinged wardrobes are usually the closer match, and the plan should show handle clearance against the opposite wall or bed.
Write the opening direction on the plan for every leaf. Fitters work from that drawing; a verbal instruction costs a return visit.
3. Interior layout agreed before production
Decide hanging lengths, drawer banks, shelf heights and any lighting while the carcass is still on the drawing board. A wardrobe for a guest room and a wardrobe for a main bedroom carry different proportions, and both are easier to change at the specification stage than with a saw on site. Where a project needs mixed storage across several rooms, combination modular wardrobes let you keep one carcass system and vary the internals room by room.
- Hanging zones: single or double hang, and the height of each rail.
- Drawers and pull-out trays: number, width and whether they sit above or beside hanging space.
- Shelves: fixed or adjustable, plus pin spacing if adjustable.
- Integrated lighting: sensor type, cable route and where the transformer is accessible.
4. Wall construction and fixing method
Tell us what the wardrobe is being fixed to. Masonry, timber stud, steel stud and plasterboard over a cavity all take different fixings and different load paths. The plan should record wall build-up, the position of noggins or blocking where heavy loads hang, and whether the unit is wall-supported, floor-supported or braced between two walls. Where the wall is uneven, decide on site whether to scribe, pack or build out — and show which.
5. Services, lighting and electrical coordination
Sockets, switches, data points, sprinkler heads and light switches that fall behind a carcass need relocating before the wardrobe arrives, not after. Confirm the finished positions with your electrician on the same drawing the joinery comes from, and mark any cable route for internal lighting so the fitter is not drilling blind.
6. Finish, material and edge detail sign-off
The shaker profile reads differently in a matte paint, a lacquer and a wood veneer, and it reads differently again under warm versus cool lighting. Approve the finish against a sample under the room's actual lighting before release. The plan should also fix the edge and panel detail — how the stile meets the rail, how panels return into a corner, and how the unit closes to an adjacent wall panel system or door reveal.
7. Delivery route and sequencing on site
A wardrobe that cannot reach the room is a wardrobe that gets cut on site. Check lift dimensions, stair turns, corridor widths and door leaves against the largest packaged component. Sequence the installation after wet trades have dried, after flooring is laid where the unit sits on the finished floor, and after painting is complete where the unit is scribed to a painted wall. Our logistics and door-to-door delivery service covers freight forwarding, packaging and container loading, customs paperwork and shipment tracking — your plan should say who receives the goods at the property and where they are stored in the meantime.
8. Installation method statement and handover
State who installs, in what order, and against which drawing. Our installation and after-sales support covers on-site fitting, inspection with a snag list, warranty coverage, spare parts and ongoing maintenance; the plan should name the site contact who signs off that snag list, and record the level tolerance and moisture condition of the room at handover. Photograph the completed run before the doors go on — it makes any later adjustment straightforward.
Frequently asked questions
When should the wardrobe survey happen? After the finished floor level and ceiling finish are fixed, and after services are in their final positions. Surveying earlier means re-measuring.
Can the shaker profile be used on sliding as well as hinged doors? The panel detail is specified per project. Tell us the door type you need and we will confirm how the profile carries through to that configuration, along with matching recessed panel wardrobes if other rooms in the same project use a different door style.
What if my walls are out of square? That is normal. Note the deviation on the survey, and the plan should record whether the unit is scribed to the wall or the wall is corrected first.
SANTERSON manufactures made-to-measure built-in wardrobes and cabinetry for villa, hospitality and office projects, with custom/OEM specification, door-to-door logistics and installation support. Send us your room dimensions, wall construction and preferred finish, and we will return a wardrobe specification and quotation for your review.