A tall mirror cabinet looks like a small line item on a bathroom schedule until it arrives on site and does not clear the window reveal, clashes with the vanity lighting or hides the pipework behind it. Because our Santerson Tall Mirror Cabinet is built to each project rather than picked from a stock shelf, the quality of what you receive depends almost entirely on how specific your enquiry is. The questions below are the ones our project team answers every day, and answering them before you place an order removes most of the rework that appears at handover.
1. What exactly goes on the wall behind it?
Send us a dimensioned drawing of the wall, not just the width you would like. We need the overall height and width you want the unit to occupy, the depth including the door when it stands open, the position of the basin centre line, the height of the mirror surface from finished floor level, and what sits above the unit — a window head, a bulkhead, a ceiling downlight or an existing tile set-out.
Tell us which wall finish you are installing over, whether the substrate is blockboard, brick, tile backer or plasterboard, and where the concealed water and waste pipes run. That single detail decides whether we build a fixed carcass, add a cut-out in the base, or shift the cabinet off the basin centre so it reads correctly against the mirror.
2. Which configuration do you actually need?
The tall format is specified with made-to-measure sizing and a choice of materials and finishes, so the same profile can be built several ways. Decide in advance whether you want:
- a full-height cabinet that reads as a fitted panel, or a tall unit that stops below the ceiling to keep the mirror line at eye level;
- mirrored doors on both faces, mirrored outside and finished panels inside, or mirrored only where you actually shave and style;
- shelving for towels and linen, an open niche for daily products, or a shallow pocket behind the door for tall bottles;
- handles or a handleless edge, which changes the clearance the door needs to swing.
If your scheme calls for integrated light in the mirror face, that is a different configuration and we confirm the lighting and electrical specification with you before production — tell us the supply voltage at site and where the driver should be reachable for maintenance. If a smaller footprint would serve better, compare it against the Standard Mirror Cabinet in the same collection.
3. How does it sit with the rest of the bathroom?
A mirror cabinet is only one part of a wet-room fit-out, and the finish has to travel across the whole room. Send us the vanity you are specifying, the wall tile, the tapware finish and any tall storage or wardrobe joinery nearby, so the carcass wrap, the door edge and the metal hardware can be matched rather than approximated later. Where a project mixes sanitaryware with joinery — basins, toilets, shower set, cabinetry — we coordinate those items in one production run, which keeps finishes consistent and cuts the number of separate deliveries landing on site.
4. How many rooms, and how are they repeated?
For apartments, serviced apartments and villas with identical bathrooms, tell us the quantity per room type and which room types differ. Repeat units are built to one approved configuration, so we produce a reference set first and hold it as the benchmark for the balance of the order. If the rooms vary — a main bathroom against an ensuite — send a separate marked-up drawing for each, because a change in mirror height or shelf layout is far cheaper to resolve on paper than on site.
5. What happens between order and installation?
Once the drawings and finish schedule are signed off, we produce the units in our factory and arrange freight to site by sea, air or rail, with the shipping paperwork handled on our side. Tell us the delivery address, whether it is a restricted city site, and the date your trades need the units on land, so production is planned backwards from that date rather than forwards from the order.
Before you commit, ask us to confirm three things in writing for your specific configuration: the final dimensioned drawing, the finish and material schedule, and what is included in the price — hardware, mirror glass, lighting driver, packaging and delivery terms. Anything left open at quotation stage becomes a variation later.
6. What should arrive with the crates?
Ask for the fixing detail for your wall build-up, the packing list keyed to each room number, and the handling notes for glazed fronts so the installation team knows which crates open first. Where a project needs on-site guidance or replacement parts after handover, we support that too — say so at the enquiry stage rather than after the units are installed.