A floor-to-ceiling modular system is one of the least forgiving items in an overseas project order. It is tall, it is made to your dimensions, and it has to arrive in panels that still line up square once the site team fixes them between a finished floor and a finished ceiling. When the same order also carries floor-to-ceiling shelving or a lighting-integrated unit, one badly packed crate can stall joinery, electrical and finishing work in the same week. The planning therefore starts long before production, at the point where drawings, measurements and shipping terms are agreed.
Start With the Room, Not the Catalogue
Santerson Floor to Ceiling Modular Systems are built to project-specific dimensions, with layout, material and finish selected per space. That flexibility is exactly what makes the measurement stage worth slow, careful work. Before a quotation is requested, record floor level across the whole run, ceiling height at several points along that run, and the position of skirting, architraves, switches, sockets, radiators and any services in the wall. Note obstructions such as beams and bulkheads, and state clearly which finishes are already installed and which are still to come.
Where the system carries integrated lighting, agree the driver position, cable routes and switch location at drawing stage rather than on site. Confirming dimensions, materials, hardware and electrical options for each configuration before production is what keeps a made-to-measure order predictable.
Split the Order Into Shipments That Match the Site Programme
Project orders rarely arrive in one drop, and they should not. Group items by when the site actually needs them: fixed joinery and wall systems first, loose furniture and soft furnishings later. A villa or hospitality fit-out that receives mattresses six weeks before the cabinetry is a storage problem, not a saving.
At quotation stage, ask for a packing list that shows every crate with its dimensions, gross weight, net weight and the items inside it, matched to the same item numbers used on the drawings. That single document lets you check whether the delivery fits through the site entrance and lift, plan the storage area, and reconcile the shipment when it lands.
Agree Freight Mode and Terms in Writing
SANTERSON's logistics service covers freight forwarding by sea, air and rail, with customs paperwork, packaging and container loading, shipment tracking and door-to-door delivery. For a modular wall order, the practical decisions are:
- Consolidation. Confirm which items share a container and which arrive separately, so nothing that belongs to one wall run is split across two shipments.
- Loading plan. Ask how tall panels are packed — upright or flat, protected at edges and faces — and how glass, mirrored and lit elements are separated from heavy carcasses.
- Documents. Commercial invoice, packing list and, where required, certificate of origin and import permits should be drafted before the container is gated in, not after it sails.
- Terms and insurance. Incoterms, who arranges marine cover, and who handles customs clearance at destination must be named on the purchase order. Import duty and local handling costs belong in your budget; confirm them for your own port and commodity rather than assuming a supplier figure.
- Tracking and contact. One named logistics coordinator per order, plus booking reference and vessel or flight details, keeps queries out of the production team's inbox.
Transit time, duty rates and clearance practice vary by destination and change between shipments. Treat any figure quoted in marketing material as a starting point for your own enquiry with the freight forwarder and customs broker.
Receive, Inspect, Then Install
Inspection works best when it is tied to the packing list. Open crates in delivery order, photograph any damage on the crate before opening it, check panel counts against the list, and keep all packaging until the last item is accounted for. Report shortages or damage with photographs and the crate mark, so replacement panels or spare parts can be identified without re-measuring the whole wall.
Installation follows a simple sequence: dry layout of modules on site, fixing of base and carcass units, alignment to a level and plumb line, then doors, shelves, trims and lighting last. Site conditions that changed after measurement — a re-laid floor, a new ceiling set-out — should be raised before fixing begins, not discovered behind the finished panel. SANTERSON's installation and after-sales service covers on-site fitting, inspection and snag lists, warranty handling, spare parts and ongoing maintenance; the applicable terms, response times and installer arrangements for your country should be confirmed in writing with the project contact.
A Pre-Dispatch Checklist Worth Insisting On
- Released drawings. Signed-off elevations with dimensions, finish codes and hardware schedule.
- Measurement sign-off. Who measured, when, and against which finished levels.
- Marked packing list. Crate marks matched to drawing numbers for every room.
- Spare parts. Extra shelf pins, hinges, handles and one spare panel per high-risk module where agreed.
- Handover file. Assembly notes, finish reference samples and the contact for after-sales support.
Coordinate these items through a single turnkey project solution, and the delivery stops being an event you react to. It becomes a scheduled stage of the programme, with the drawings, documents and site sequence already agreed before the container leaves.
For a made-to-measure wall system on a residential or hospitality project, send us the room dimensions, finish selection and target installation date, and we will confirm the configuration, packing plan and delivery options for your site.