A request for quote for acoustic wall panels only becomes comparable once every supplier is pricing the same job. With made-to-measure Santerson Acoustic Panels, where finish, layout and dimensions are specified per space, the quality of your enquiry decides how accurate the price is and how few surprises appear after order confirmation. The checklist below is written for procurement officers, contractors and interior designers sending an RFQ to our wall paneling team, and it applies equally to Santerson Acoustic Sliding Panels and the other collections in our Paneling Systems and Sliding Panel Systems ranges.

1. Project context, quantities and delivery destination

Start with what the panels are for and where they are going. A residential feature wall, a villa media room and a hotel meeting room all drive different finish and hardware selections, and our project services cover production through door-to-door delivery, so the destination port or site address changes what we can quote.

  • Project type and room use (residential wall system, villa, hospitality, office).
  • Number of rooms or elevations involved, and total square metres per elevation if you already have measurements.
  • Country, city and delivery address, plus whether you need logistics and door-to-door delivery or collection at port.
  • Your target on-site date, so production and freight can be planned backwards from it.

2. Dimensions, layout drawings and opening conditions

These are configurable listings with made-to-measure sizing, so a dimensioned drawing is worth more than a room description. Send what you have at enquiry stage; if the space is still in design, say so and we can work from concept layout drawings under our interior design services.

Item to supplyWhy the factory needs it
Panel area width and height, in millimetres, per elevationSets panel module size, cutting waste and packaging plan
Floor-to-ceiling or partial height, plus skirting and cornice detailsDetermines top and bottom edge treatment and fixing method
Positions of sockets, switches, doors, windows and service runsCut-outs and access panels must be planned before production
For sliding systems: track length, clear opening, ceiling height and structural support above the openingDetermines track specification, panel count and hardware load
Wall flatness and substrate type (masonry, plasterboard, existing frame)Affects battening, fixing detail and on-site preparation you must allow for
CAD or PDF drawings, marked-up plans or photographs with a scale referenceReduces measurement error and avoids re-making panels after shipment

3. Acoustic intent, not just a word like "soundproof"

"Acoustic" means different things to different buyers, and an RFQ that only says acoustic invites vague pricing. State the outcome you are trying to achieve and let us confirm the configuration for it:

  • Are you reducing reverberation inside the room, or limiting sound passing through a wall or a sliding partition between spaces?
  • Which frequency range matters most — speech from an adjacent office, music and home cinema, or plant and mechanical noise?
  • Is there a performance target from a consultant, and if so what is the reference method and value? If there is no target, say "no stated target" rather than leaving it blank.
  • For sliding panels: how often the panels are moved, and whether they must seal acoustically when closed or simply divide the space visually.

Our product pages list configurable acoustic panels and acoustic sliding panels for residential wall system projects; materials, dimensions and finish selections are confirmed project by project, so treat any performance figure in a quotation as tied to the exact build-up being quoted. Ask us to state the composition of the quoted build-up — core, facing, edge detail and fixing method — so that quotes from different suppliers can be compared on the same basis.

4. Material, finish and colour selection

Finish is where a wall system either matches the rest of the fit-out or does not. Tell us which direction you want and we will price it within our Textured Panels, Matte Lacquer Panels and Stone & Marble Panels options, or match a sample you already hold.

  • Finish family: matte lacquer, textured, glass and glossy, wood veneer, stone or marble effect.
  • Colour reference — RAL, Pantone, a supplier swatch code, or a physical sample you can post.
  • Sheen level and whether the surface will be touched frequently in that room.
  • Grain direction and joint pattern for panels that repeat across an elevation.
  • Matching items elsewhere in the project — Wood Veneer Panels, doors, wardrobes or Wall Mounted Media Walls that must read as one joinery package.

If you are specifying to a design intent, attach the mood board or finish schedule. Our custom and OEM service covers bespoke finishes and textures, so an RFQ that names the intended look usually produces a closer price than one that asks us to guess.

5. Scope boundaries: what is included in the price

State clearly which side of the line each item falls on, and ask every supplier to do the same in writing. This is the single biggest cause of a quote looking cheap and then rising.

  • Site survey and re-measurement — by your team or by us.
  • Substrate preparation, battening and any structural work above sliding tracks.
  • Packaging for export, container loading plan and door-to-door delivery versus port delivery.
  • Import duties, customs clearance and who acts as importer of record.
  • On-site installation, snag inspection and making good, covered by our installation and after-sales support.
  • Spare panels held for future maintenance, and how replacement panels are matched later.

6. Samples, approvals and the decision path

Tell us how approvals work on your side so we can build them into the programme instead of arguing about them later:

  • Which samples you need before order — finish sample, corner section, or a mock-up elevation.
  • Who signs off the shop drawings: client, designer, main contractor or all three.
  • How long approval normally takes, and what happens to the production slot if it slips.
  • Whether one room should be completed first as a benchmark before the remaining panels are made.

Our stated cooperation steps run from project brief and design proposal to quotation and detail confirmation, then production, shipment and follow-up. An RFQ that already contains dimensions, finish intent and scope boundaries lets us move straight to a firm quotation with details attached.

7. Commercial terms worth locking down in the enquiry

Put your commercial expectations in the RFQ, not in a later email thread. Ask each supplier to price and confirm:

TermWhat to ask for
Pricing basisPrice per square metre with a clear statement of what the rate includes and excludes
Tooling and one-off costsCost of non-standard modules, special edge details or bespoke hardware, shown separately
Payment stagesDeposit, milestone before shipment, and balance terms tied to approved drawings
ValidityHow long the quotation stands, given material and freight movement
Packaging and loadingPanel-by-panel crate labelling keyed to a room schedule, so panels go to the right elevation on site
Warranty and sparesCoverage terms, exclusions and lead time for replacement panels

Before you send it: room and elevation labels on every drawing; dimensions in millimetres; finish reference attached; acoustic intent written as an outcome, not one adjective; delivery address and Incoterms stated; a clear list of what your team handles on site; and the same question set sent to each supplier so the returns are comparable. Missing any of these usually means a second round of pricing.

A short RFQ template you can copy

  • Project: name, location, room use, target on-site date.
  • Schedule: elevation references, panel area in mm, quantity of elevations, sliding or fixed.
  • Drawings: marked-up plans or CAD, service and opening positions, substrate notes.
  • Acoustic intent: reverberation control or sound separation, target if any, frequency concern.
  • Finish: family, colour reference, sheen, matching joinery elsewhere in the project.
  • Scope split: survey, preparation, delivery terms, installation, snagging, spares.
  • Approvals: sample needs, drawing sign-off chain, benchmark room.
  • Commercial: pricing basis, one-off costs, payment stages, quotation validity, packaging and labelling.

Send that package to our team through the contact page, naming the panel collection you are enquiring about, and we will come back with a quotation built on your drawings rather than assumptions. For related wall systems in the same joinery package, see Santerson Partition Sliding Systems and Santerson Glass & Glossy Panels.