Specifying a custom washdown one piece toilet looks simple on a schedule of rates: pick a model, confirm the quantity, place the order. On site, the rework usually comes from something that was never written down — a drain that sits in the wrong place, a cistern lid that does not match the approved tile line, or a seat that arrives three weeks after the tiler has finished. Model 1004A is our modern square-rounded washdown one piece ceramic toilet, and it is a good example of how much detail needs to be closed out before production starts. Below is the checklist we work through with buyers on villa, apartment and hotel projects.
1. Trap type and rough-in distance
This is the first decision, because it cannot be corrected after the waste pipe is laid. The 1004A supports two plumbing arrangements: a P-trap wall drain with an 180 mm rough-in, and an S-trap floor drain with a 250 mm rough-in. Both options exist on the same bowl design, so you are choosing to suit the pipework rather than changing the product.
Before we schedule production, ask your plumbing consultant to confirm three numbers on the setting-out drawing: which outlet direction the waste takes, the distance from the finished wall face to the centre of the drain, and the finished floor level. Rough-in is measured to the finished surface, not the structural slab. A tolerance of a few millimetres sounds harmless, but with a one-piece unit the pan sits hard against the wall and there is no adjustable bracket to absorb the error.
2. One-piece or two-piece construction
The 1004A uses a one-piece integrated structure, which removes the gap between tank and bowl where dirt and bacteria collect in a two-piece unit. For housekeeping-driven environments such as hotels and serviced apartments, that single joint-free surface shortens daily cleaning time and keeps the appearance neat for longer.
If your project mixes fixture types deliberately, we also supply a two-piece option with the same dual 180 mm P-trap and 250 mm S-trap rough-in range, so guest bathrooms and back-of-house restrooms can be specified consistently while the bowl style changes. The choice is one of cleaning routine, replacement access and budget per room — not a difference in flushing principle.
3. Flushing performance and water use
The 1004A uses a washdown flushing mechanism, which delivers strong flushing performance while maintaining good water efficiency. Two things need to be confirmed at the specification stage rather than left to the installer:
- The flush volume your project standard or rating tool requires, and the matching cistern configuration.
- The incoming water pressure and supply line size at each fixture. A washdown pan on a weak or undersized supply will not perform the way the sample in your showroom did.
For multi-storey buildings, we suggest checking pressure at the highest fixtures, not at the ground-floor plant room. If your project has a defined water-efficiency scheme, send us the target figure with the enquiry and we will confirm which configuration meets it before any tooling is committed.
4. Glaze, colour and surface consistency
The 1004A is made from vitreous ceramic with a dense glossy glaze that resists stains, limescale and yellowing. For a project ordering hundreds of pieces across several production batches, the item to lock down is colour consistency between those batches.
Practical steps: approve a physical sample piece rather than a colour code on paper; agree the batch quantity for each delivery so that one bathroom floor is not tiled with pans from two different firings; and keep the approved sample in your site office as the reference for snagging. White is not one colour — it shifts visibly under warm hospitality lighting.
5. Seat, lid and hardware
The seat is usually quoted separately, and it is where most specification gaps appear. Confirm the seat type (standard or soft-close), the hinge material and fixing method, the finish if anything other than white is required, and whether the seat is shipped assembled in the same carton or packed loose. Loose packing means an extra step for the installer at handover; assembled packing means more packaging volume per container.
Also confirm spare-seat supply at the same time as the main order. Two years into operation, a hotel will replace seats far more often than pans, and matching a discontinued hinge profile is avoidable work.
6. Customisation and OEM options
Where a project needs something beyond the catalogue, our Custom & OEM Service covers bespoke material finishes and textures, OEM manufacturing, flexible minimum order quantities and brand customisation such as engraving or private labelling. For sanitaryware this typically means confirming the marking to be applied, its position on the product, and whether branding appears on the carton as well as the piece.
One caution: customisation changes lead time and affects how spares are ordered later. Decide at the outset whether guest-facing fixtures carry branding and back-of-house fixtures do not — that split keeps future replacements simple.
7. Packaging, container loading and delivery
Ceramics are heavy, fragile and awkward to stack, so packaging is a production decision, not a shipping afterthought. Confirm the protective packing standard, the carton count per pallet, and how the load will be braced in the container. Our logistics and door-to-door delivery service covers freight forwarding by sea, air and rail, customs paperwork including commercial invoices, packing lists and certificates of origin, packaging and container loading, shipment tracking and delivery to site.
Tell us the delivery address and access conditions early. A villa site with narrow access and no lifting equipment needs a different carton size from a hotel tower with a goods lift, and this affects how we pack long before the containers are booked.
8. Coordinated bathroom fit-out
A WC is rarely ordered alone. Basins, shower systems, vanities, mirror cabinets and vanity lighting from the same range simplify both design consistency and site coordination. The 1004A sits in a wider sanitaryware catalogue that includes wall-hung basins, freestanding pedestal basins, bidets and shower sets, so matching pieces can be specified under one purchase order and shipped together.
Coordinating these items at specification stage also prevents the common sequence problem: tiling completed, then a basin discovered to need a different waste position. As part of our turnkey solutions for villa and hospitality projects, we handle material selection and product specification alongside production and site coordination.
9. Installation, snagging and spares
Before the first pan is fixed, agree who supplies the sealant and wax-ring equivalent, who is responsible for protecting the glaze during remaining trades, and what the acceptance criteria are for handover. Our installation and after-sales support covers on-site installation, inspection and snags, warranty coverage, spare parts and replacement, and ongoing maintenance.
Warranty terms and response arrangements vary by project and region. Ask for them in writing with the quotation, and confirm which items are treated as consumables — seats and hinges usually are.
The pre-production sign-off list
Before we release a 1004A order to production, these items should be confirmed on one document, signed by the buyer and checked against the setting-out drawings:
- Trap type per room type, with rough-in measured to finished surfaces.
- Flush volume target and supply pressure at the relevant fixtures.
- Approved physical colour sample and batch quantities per shipment.
- Seat specification, hinge finish, packing method and spare-seat quantity.
- Any OEM marking, its position, and minimum order implications.
- Delivery address, access conditions and container loading plan.
- Installation responsibility, snag list format and spares holding.
Close these out once and the fixture becomes a non-event on site. Leave them open and each one resurfaces as a variation. As a China-based furniture and building materials manufacturer working on residential, villa and hospitality projects internationally, we would rather resolve all of it on paper before the first mould is loaded.
Send us your room-by-room schedule, setting-out drawings and target flush volume, and we will confirm configuration, batch plan and landed delivery for your project.