A matte sliding door wardrobe rarely fails on the day it is installed. It fails in the weeks before, when somebody assumes the opening is square, the track length is obvious and the interior layout will "work itself out" on site. An installation plan is what removes those assumptions. Written before production starts, it fixes the dimensions, the finish, the hardware and the sequence of works, so the panels arrive on a level floor that is ready to take them.
1. Measured opening data, not nominal sizes
Start with the finished dimensions of the space, taken after the final floor covering, skirting and wall finish are in place. Record the width at high, middle and low points, and the height at the left, centre and right — walls and floors are seldom consistent across a whole run. Note the ceiling type, because a wardrobe that runs to a suspended ceiling needs a different head detail from one that meets a structural slab.
Our custom furniture design and prototyping service works from made-to-measure sizing, so the drawing pack should carry the measured figures rather than a rounded architectural dimension. State clearly which numbers are structural and which are finished-line dimensions, and flag any out-of-plumb wall before the carcass is cut.
2. Door layout, panel count and overlap
Decide how many panels the opening will carry and in what order they stack. Two panels on a narrow alcove behave differently from four panels across a full bedroom wall: the number of track lanes determines how much of the interior you can open at once, and the overlap between panels decides whether a sliver of the compartment stays hidden. Write down the clear opening width you actually get, not just the overall width.
Where the run turns a corner or wraps around an obstruction, check that every panel can still travel its full path. Our closet sliding panels are configured per project for layout and finish, which is the point — the plan should show the layout as a dimensioned elevation, with the travel direction of each panel marked.
3. Track, runners and the load they carry
Specify the track type and where it sits: top-hung or floor-guided, recessed or surface-mounted, single or double lane. A matte door leaf is heavier than it looks, so the runner rating has to match the panel weight and the daily cycle count of the room. Note the threshold detail at the floor track, particularly where the wardrobe crosses a change of flooring, and confirm the load capacity of the head rail fixing with the ceiling construction on site.
Confirm hardware requirements in writing — runner type, soft-close or plain stop, handle or edge pull, lock if the project calls for one. On apartment work this is also where a specification substitution gets caught before it becomes a variation.
4. Finish schedule and sight lines
A matte surface shows fingerprints and directional marking far more readily than a gloss one, so the finish schedule should name the panel material, the colour or grain reference, and which face is visible from the bed or doorway. Record edge banding and profile colour as separate line items; a mismatched edge on a matte leaf is visible from across the room. If the elevation sits opposite a window, say so in the plan, because raking light exposes surface texture that flat light hides.
Where the wardrobe forms part of a wider joinery package, check the matte door finish against adjacent built-in furniture and any wall panelling in the same sight line, so tones are approved together rather than one at a time.
5. Interior configuration and clearances
The doors only earn their keep if the interior is planned to the same level of detail. Set hanging heights, shelf spans, drawer positions and any lighting before production, and check that drawers and pull-out rails clear the door frame when extended. Note where a panel will permanently cover a compartment — that bay should hold seasonal or low-use storage, not everyday items.
6. Site conditions and the sequence of works
Fix the order in which the room is completed: flooring laid and protected, wall finishes cured, skirting fitted, electrical and air grilles set out, and the opening cleared before delivery. A sliding wardrobe installed against freshly painted plaster or an unfinished floor line will need rework. Record access for the delivery route as well — panel length, lift dimensions, stair turns and corridor widths all affect how a made-to-measure unit reaches the room.
Our logistics and door-to-door delivery service covers freight and packaging for project consignments, and the plan should state who receives the goods, where they are stored on site, and which trade signs off the opening before installation begins.
7. Installation method and handover checks
State who installs and to what drawing revision. Allow for the adjustment range built into the hangers, so an installer can level a panel without shimming beyond its designed tolerance, and note fixings for masonry, timber stud or steel framing as applicable. Finish the plan with a handover checklist: panels running freely along the full track, no rub at the stops, doors aligned at the overlap, interior hardware working, and any snag list signed off on the day.
Our installation and after-sales support covers on-site fitting and inspection, so agreeing the checklist in advance protects both the site team and the client at handover.
8. Approvals before production is released
Close the plan with a sign-off block: measured dimensions confirmed on site, elevation and layout approved, finish samples approved by name, hardware schedule agreed, and installation date fixed against the site programme. Made-to-measure joinery cannot be shortened or re-finished cheaply once it leaves the factory, so this page is the cheapest place in the whole job to change your mind.
If you are coordinating wardrobes alongside other joinery and finishes for a villa or apartment package, send us the drawings and the room schedule through our contact page and we will return a dimensioned proposal against your programme.