A quotation for Black Matte Cabinets is rarely a single number. Because these cabinets are made to measure, the price follows the exact layout, materials and hardware you specify — which means an accurate quote depends entirely on how much usable information you send at the start. The steps below show what to prepare, what we ask in return, and how the specification is confirmed before production begins.
What makes a black matte cabinet quote project-specific
Black Matte Cabinets sit within our Matte Finish Kitchen Cabinets collection and are built for residential kitchen projects. The product page lists three configurable points: made-to-measure sizing, material and finish options, and a layout tailored to the project. Each of those moves the cost.
A run of straight wall units with standard carcass depths is not comparable to a kitchen that includes tall pantry columns, an island, integrated appliance housings or curved ends. Likewise, a laminate surface and a lacquered or acrylic surface are different requests at different price levels. If you send only "black matte kitchen, 4 metres", we can only return a rough range — and ranges are the least useful thing for a budget.
Information to include in your enquiry
Send what you already have. Drawings are welcome but not required; sketches and photographs work too. The items below are the ones that let us price the job rather than guess at it.
- Room dimensions and a layout. Wall lengths, ceiling height, window and door positions, and the position of existing plumbing, flues and switchboards. A marked-up floor plan or a measured sketch is enough to start.
- Runs and elevations. How many linear metres of base units, wall units and tall units, plus any island or breakfast bar, with the intended height of each run.
- Door style and profile. Flat slab, handleless, shaker or framed — this changes both the panel construction and the finish. If you are weighing up a handleless look, our Handleless Matte Cabinets page shows how the profile reads in the same matte family.
- Finish and substrate. Say whether you want a matte surface specifically, and which substrate or door construction you prefer. Tell us if fingerprint resistance, edge wrapping or a matched colour standard matters for the site.
- Internal fittings. Shelf-focused or drawer-focused interiors, corner solutions such as pull-out carousels, integrated laundry hampers, lighting inside glass-front sections, and any appliance you want housed.
- Countertops and splashback. State whether you want us to supply them or whether they are coming from another trade — this changes both the price and the delivery sequence.
- Quantity and site type. One house, a villa with several kitchens, or an apartment scheme. Repeat units change both production and packing.
- Delivery location and terms. City and port of entry, plus whether you want door-to-door delivery or collection at a port. This decides how freight is quoted alongside the cabinets.
- Target date. When the units need to be on site, so production can be sequenced around your programme.
How we turn that information into a quotation
Our design and project service follows a set sequence: a project brief and design proposal, then quotation and detail confirmation, then production, shipment and follow-up. Your enquiry enters at the first step.
- Brief review. We read your dimensions, layout notes and finish preference, and identify anything missing — usually an elevation, a ceiling height or an appliance schedule.
- Layout and proposal. Where you want help, our team works on space planning and 3D visual renderings so the run, heights and clearances are agreed before anyone prices them. This is part of our Interior Design Services.
- Specification sheet. The quote comes back itemised by unit module: door panel and finish, carcass material, hardware set, internal fittings, countertop supply or exclusion, and packing. You can change a line item instead of the whole job.
- Detail confirmation. Dimensions, finishes and hardware are confirmed with you in writing before production starts. This is the point at which a made-to-measure order becomes fixed.
- Production, logistics and handover. After your confirmation we manufacture, pack and arrange freight under our Logistics & Door-to-Door Delivery service, then coordinate installation and inspection on site through our Installation & After-sales Support.
If your kitchen needs non-standard sizes, a matched colour or a bespoke door construction, that goes through our Custom & OEM Service, which covers custom furniture design and prototyping alongside bespoke material finishes and textures.
Quote request checklist
| Item | What to send | Why it matters |
|---|---|---|
| Measured drawings or sketch | Plan plus elevations with heights and openings | Sets module widths and prevents on-site cutting |
| Door profile | Slab, handleless, shaker or framed | Determines panel construction and cost band |
| Finish reference | "Black matte" plus any colour code or sample photo | Avoids mismatched tones between batches |
| Appliance schedule | Models and dimensions of built-in units | Housing sizes must be fixed before production |
| Internal fittings | Drawers, corner units, lighting, hampers | Usually the largest variable after door panels |
| Countertop scope | Supplied by us or by another trade | Affects price and delivery order |
| Delivery address and terms | Site or port, preferred Incoterms | Determines how freight is quoted |
| Quantity | Number of kitchens or units | Repeat modules change production and packing |
A practical note on finishes: matte surfaces read very differently under task lighting and natural light, and black shows dust, water marks and fingerprints more readily than a mid-tone. If the kitchen is a high-traffic family space or a shared villa kitchen, ask us about surface options and edge treatment for that use rather than assuming one finish suits every room.
Questions that come up before an order is confirmed
Can I get a price from photos of a kitchen I like?
Photos help us understand the look you want, but they cannot give dimensions. Send the reference images together with your measurements and we will match the profile and finish as closely as our range allows.
Do you quote only complete kitchens?
No. We quote single runs, tall-unit banks, pantry walls or laundry and utility rooms as easily as a full kitchen. Where a project needs more than cabinetry — flooring, wall panelling, doors, wardrobes or bathroom fixtures — we can quote those in the same package so one specification covers the fit-out.
What if my measurements come from a builder and the room is not finished?
Tell us which surfaces are still being set out. We can quote against the current drawings and hold the final confirmation until levels, plaster lines and services are fixed — that step protects you from ordering modules to an opening that later moves.
Can I compare a matte finish with other options in the same quote?
Yes. Ask for alternates and we will price the same layout in another finish from our cabinet range, so you can see the cost difference between choices rather than guessing at it.
To request a quotation, send your drawings or measurements, door profile and finish preference to SANTERSON. We review the brief, return an itemised specification for confirmation, and take the order through production, delivery and installation as one coordinated package.