A single line in a design brief — "built-in storage wall with open and closed elements" — is enough to start a conversation, but not enough to start production. What separates a fast quotation from six weeks of email ping-pong is the quality of the information that arrives with the enquiry. This guide walks through exactly what we need to price and build a Santerson Mixed Open & Closed Storage wall, whether it is one unit in a Melbourne apartment or a full joinery package across a Sydney villa.
What the Product Actually Is — and Why It Sits at the Centre of Fit-Out Drawings
The Mixed Open & Closed Storage system belongs to our Integrated Storage Walls collection. Unlike a freestanding cabinet, it is designed as part of the architecture: the wall build-up, floor levels and ceiling heights all influence how the unit is detailed and installed. The configuration combines open elements — shelves, niches, display bays — with closed elements — doors, drawers and concealed compartments — in one continuous run.
Because it is made to measure rather than catalogue-sized, dimensions, layout and finish are all specified per project. That flexibility is exactly why an incomplete brief creates problems: two projects described with the same sentence can need completely different carcass construction, hardware schedules and fixing details.
If your drawings show a similar requirement in a living space rather than against a wall build-up, the related Santerson Mixed Open & Closed Systems range may be the better starting point. Our team will confirm which collection fits the detail on your drawings once we have seen them.
Stage 1: What a Useful Design Brief Looks Like
You do not need finished shop drawings to enquire. A workable first brief usually contains four things:
- The location and the wall. Which room, which wall, and whether the run stops at a corner, wraps around a doorway or meets a window reveal.
- Rough overall dimensions. Length, height and depth as shown on your architectural drawings — even indicative sizes are fine at this stage.
- The open-to-closed intention. For example: "display shelving at eye level, closed storage below, no visible handles."
- Finish direction. A reference to the joinery palette used elsewhere in the project — veneer, lacquer, matte laminate or a colour sample — so we are quoting the right surface from the start.
Where the storage wall has to coordinate with other built-in elements on the same project — kitchen cabinetry, wardrobes, media walls — send those drawings too. We manufacture across all of these categories, and reviewing them together avoids finish and profile mismatches between trades.
Stage 2: The Detail List We Work Through Together
Once we have the brief, our project team sends back a specification sheet covering the points that actually drive cost and production. Expect questions in these areas:
| Area | What we confirm before pricing |
|---|---|
| Dimensions & setting out | Overall length, height and depth; where the run starts and stops; floor and ceiling tolerances on site. |
| Internal layout | Shelf spans and adjustable heights, drawer bank positions, tall cupboard zones, any dedicated spots for appliances, TVs or safe boxes. |
| Open vs closed ratio | Which bays stay open, which are behind doors, and whether doors are hinged, sliding or lift-up. |
| Materials & finishes | Carcass board, door substrate, veneer / lacquer / laminate / acrylic finish, edge treatment and colour codes. |
| Hardware | Hinges, runners, handles or handleless profiles, integrated lighting where specified. |
| Fixing & interface details | Wall build-up behind the unit, skirting returns, cornices and how the unit meets plaster, stone or timber finishes. |
For projects in Australia and elsewhere, we recommend confirming these points against the final construction drawings before production is released. Site conditions such as out-of-plaster walls or changed floor levels are far cheaper to resolve on paper than on installation day.
Stage 3: From Specification to Quotation
With the specification sheet agreed, we issue an itemised quotation. Because the system is made to measure, pricing follows the actual configuration: a wall dominated by open shelving and simple carcasses prices differently from one with handleless door fronts, integrated lighting and drawer banks.
Our Custom & OEM Service covers bespoke finishes, prototyping and private labelling for contractors and developers who need the storage wall to match an established joinery programme rather than a standard range.
Stage 4: Production, Delivery and Installation Planning
SANTERSON operates as a China-based manufacturer and one-stop supplier for furniture and building materials, so the storage wall travels alongside everything else on your project rather than as an isolated purchase. Our Logistics & Door-to-Door Delivery service handles freight forwarding by sea, air and rail, packaging and container loading, customs paperwork and shipment tracking.
Before the units ship we agree the delivery sequence with your site team. Built-in joinery usually needs to arrive after wet trades and floor finishes are complete but before final soft furnishing — a timing point worth fixing in the programme at quotation stage, not at customs clearance.
Our Installation & After-sales Support covers on-site installation guidance, inspection and snag lists, spare parts and ongoing maintenance. For villa and hospitality projects we coordinate the storage wall install with adjacent cabinetry so reveals, shadow gaps and door alignments read consistently across the whole fit-out.
A Worked Example: Coordinating Storage Walls Across a Villa Package
Australian villa projects we have worked on — including references published on our Project Cases pages for Willoughby, North Turramurra, Perth, Melbourne and Sydney — rarely stop at one storage unit. A typical package links the entry storage wall, living-room media and display wall, bedroom wardrobes and kitchen cabinetry.
When these are ordered together from one manufacturer, three practical benefits follow: one finish schedule governs every door front; profiles and shadow gaps repeat consistently between rooms; and a single production and shipment programme replaces a dozen separate supplier deadlines. Related collections we frequently pair with the Mixed Open & Closed Storage system include Santerson Full Height Storage Walls for floor-to-ceiling runs and Santerson Integrated Media Storage where the wall also carries screens and equipment.
Common Questions Before You Send the Enquiry
Do I need detailed shop drawings before contacting you?
No. Architectural drawings with room dimensions and a finish direction are enough to start. We will come back with the specification questions listed above, and if needed our Interior Design Services team can develop layout and 3D visuals before production.
Can the open and closed elements be changed after production starts?
Changes are straightforward at specification stage and expensive once panels are cut. We recommend one consolidated review of the layout drawing — internal shelf positions, door swing directions and hardware schedule included — before release to production.
Is the system suitable for hospitality projects as well as private residences?
Yes. Guest-room and suite joinery typically uses a higher closed-storage ratio with durable laminate or lacquer finishes, while display bays stay in lower-traffic areas. Tell us the room type and expected use, and we will spec board edges, hardware cycles and finishes accordingly.
What minimum order applies?
Minimums are flexible and depend on the project scope; single villas through to multi-unit developments are handled under the same Turnkey Solutions workflow.
Send us your drawings, wall dimensions and finish references, and our project team will return a specification sheet and itemised quotation for your Mixed Open & Closed Storage enquiry. Contact PHILLIP via the Contact page — enquiries receive a response within 24 hours.
Start Your Enquiry