A good design brief gets you a wardrobe that fits the room. A complete enquiry gets you that wardrobe quoted, specified and built without six rounds of guesswork. If your project calls for Mirror Sliding Door Wardrobes, the difference between a rough idea and a firm quotation usually comes down to five pieces of information. Here is what to gather before you send it.
1. Start with the room, not the product page
Product galleries show styling; they do not tell your fabricator anything. Before you write the enquiry, measure the wall the wardrobe will run along: overall length, floor-to-ceiling height at both ends (older villas are rarely level), and the depth available once skirting boards and architraves are accounted for.
- Wall length and usable height, measured at two or three points, not just one
- Available depth, noting radiators, downlights, air-conditioning returns or door swings that cut into it
- Photos of the wall from straight on and from each end, plus a phone sketch with dimensions written on it
2. Define the door span and how the doors will move
Mirror sliding doors need clear run for the panels to overlap. Tell the supplier how many doors you have in mind and what is obstructing the run — a window on the return wall, a bedside table, an en-suite doorway. Slab span matters too: very wide mirror panels are heavy on the track and awkward through doorways on site.
If the room will not support a full sliding run, say so in the enquiry. A good supplier will propose an alternative rather than quote something that binds on the track — Glass Sliding Door Wardrobes for a lighter front, or Matte Sliding Door Wardrobes where reflections are unwanted near a bed or vanity.
3. Specify the mirror and the frame finish together
A mirror front is not one decision but three: the glass itself, the framing around it, and how the edge is finished where two panels meet. Note whether you want plain mirror, tinted or bronze-toned glass, and whether the frame should read as a visible line or sit almost flush. Finish samples photograph badly; describe the reference instead — a joinery detail from another room, a hardware finish already used in the project, or a RAL/brand colour name if one exists.
State which surfaces must match existing work: bedroom doors, skirting, a vanity unit. Matching to something already installed is far easier when the supplier sees a photo of it than when they hear a colour name over email.
4. Give the internal layout as a list, not an adjective
"Lots of storage" is not a specification. Count what actually goes in: hanging garments short and long, drawers, shelves for folded linen, a shelf above the doors, lighting inside the carcass, a safe or an ironing bay. A short list lets the supplier convert it into a drawing and flag anything that will not fit before production starts.
| Item to state | Why it changes the quote |
|---|---|
| Hanging lengths (short / long / double rail) | Sets rail heights and panel divisions |
| Number and depth of drawers | Drawer banks are the largest internal cost line |
| Shelf count and adjustable vs fixed | Affects carcass build and interior finish grade |
| Interior lighting and switch type | Needs wiring provision decided before panels go on |
| Room access route to the installation point | Determines whether panels ship as one piece or are split for site assembly |
5. Close the brief with project and delivery facts
For an order crossing borders, the last part of the brief is logistics. Give the site address, the floor and lift dimensions if it is an apartment, the date the room needs to be finished, and who will receive the shipment. If your programme has other trades waiting — electricians for internal lighting, painters before installation — name those dependencies now so the production schedule is built around them rather than against them.
SANTERSON's workflow follows consultation, design and planning, production, logistics, installation and after-sales, so a complete enquiry lets each stage start on time. The same applies to wider fit-outs: when wardrobe joinery, bedroom cabinetry and flooring come from one supplier, finishes get specified against a single drawing set instead of three.
What the supplier should send back
A competent response to a complete brief contains marked-up drawings with dimensions, a specification sheet naming the mirror glass and frame finish, a quotation broken into carcass, doors and ironmongery, and a stated production and delivery window. If any of those four are missing, ask for them before you commit — that document set is what protects you at handover.