A shower set quotation rarely fails on price alone. It fails when the supplier is left to guess. Send us the wall condition, the water supply arrangement and the room drawings, and the quotation for our Gun Grey Digital Display Rain Shower System, Wall Mounted Bathroom Shower Set with Handheld Sprayer comes back with the right valves, the right rough-in and a realistic landed cost. Below is exactly what we need from you, and why each item changes the number.
Start with the product page, then tell us what you are changing
Our gun grey digital display rain shower system is a wall-mounted set built around three working parts: a wide square overhead head for full-coverage rainfall flow, a multi-function handheld sprayer on a slide bar that raises and lowers for users of different heights, and a digital screen that shows water temperature in real time so the first person in avoids scalding. The matte gun grey finish is chosen because it hides water marks and fingerprints in daily use, which matters in a hotel or a rental where the bathroom is cleaned every day. Standard installation accessories are included with the set.
If you are ordering the set as published, say so and we price it as it stands. If you are adapting it — different spout reach, a diverter arrangement that also feeds a bath, a handheld with fewer modes for a public or gym bathroom, a finish other than gun grey — list those changes up front. Customisation and OEM work on finishes and configurations is part of how we supply projects, and the earlier we know, the fewer revision rounds you pay for in time.
The eight items that make a quotation accurate
1. Quantity, split by location
Give us the total number of sets and how they fall across rooms or buildings: 40 guest bathrooms in one tower is a different production and packing plan from 8 sets across four villas. Where a project mixes bathroom types, tell us which type each room uses — our Modern Rainfall Shower System with Handheld Sprayer may suit the standard rooms while suites take the digital display set.
2. Wall build-up and what is behind it
Wall-mounted sets depend on the wall. Tell us the substrate — brick, block, stud with ply lining, or a tiled cavity — and the finished wall thickness at shower height. A set fixed into a lightweight partition needs different fixings and sometimes a backing frame; that is an accessory decision, not a surprise on site.
3. Water supply and pressure
Send the incoming supply type (mains pressure, tank and pump, or a booster set) and the measured static and flowing pressure at the shower node if you have it. A large overhead rainfall head performs very differently under low pressure, and this is the single most common cause of a project changing specification after installation.
4. Hot water source and mixing
State the heat source — storage cylinder, continuous flow, heat pump, solar with boost — and whether temperature is controlled at the set or upstream. The digital display reports water temperature at the set; it does not replace a thermostatic control valve, so confirm which control you intend to use and whether you want us to supply it.
5. Drawings, even rough ones
A bathroom elevation or a marked-up plan showing tile set-out, the shower niche and the position of the supply outlets lets us confirm outlet centres before production rather than after tiling. Sketches photographed on site are acceptable at enquiry stage.
6. Delivery terms and destination
Give the delivery city or port, your preferred Incoterm, and whether you want door-to-door delivery handled for you. We arrange freight by sea, air and rail with the customs paperwork — commercial invoice, packing list, certificate of origin — so the term you choose decides what we quote and what your team clears locally.
7. Programme dates
Tell us when the bathroom needs to be watertight and when the sets must arrive, working backwards from handover. Production sequencing for a multi-room order follows the site programme, so a real date prevents stock sitting in a warehouse or a trade being held up.
8. Documentation you have to submit
Tell us which documents your consultant, certifier or client requires with the submittal — dimensional drawings, material and finish schedules, spare-parts lists for the maintenance file. We prepare product documentation to match your submittal format so approval does not stall on paperwork.
What we send back, and how it is priced
With those inputs you receive an itemised quotation: each set with its included accessories listed separately from anything added for your wall or supply condition, packing and cube so your freight forwarder can quote against the same figures we used, and the lead time for that quantity. Where a change is genuinely not possible on this model, we say so plainly and offer the closest alternative instead of promising it.
As a China-based furniture and building materials manufacturer working on villa, hotel and apartment projects, we normally supply shower sets as part of a wider bathroom package — vanities, basins, toilets, mirrors and lighting from the same order. Bundling does not force you into one finish or one supplier's design language; it means one packing list, one shipment and one point of contact when something needs replacing later.
Common gaps that delay a quotation
- Quantity left open. "About 30, maybe more" cannot be costed. Send the current room count and mark which rooms are provisional.
- No pressure data. If nobody has measured it, say so — we will ask for a simple reading instead of quoting a head that underperforms.
- Finish decided late. Gun grey matte is the published finish. A different colour or surface is usually possible but changes production routing and packing.
- Local plumbing assumed identical to ours. Outlet centres, trap arrangements and valve threads follow your local standards; send the standard your plumber works to.
A short enquiry template you can copy
Product: Gun Grey Digital Display Rain Shower System, wall mounted, with handheld sprayer — or the alternative model reference.
Quantity: total sets, split by room type or building.
Project type: villa, hotel, apartment, serviced residence, gym or public amenity.
Wall: substrate and finished thickness at shower height; tiled cavity yes or no.
Supply: pressure source and any measured readings; hot water source and where temperature is controlled.
Drawings: bathroom elevations or marked-up plan, plus required submittal documents.
Delivery: destination city or port, preferred Incoterm, door-to-door wanted or not.
Dates: required on-site date and any staged release quantities.
Contact: name, company, phone or WhatsApp, email.
Send that and we can return a usable quotation rather than a list of questions. If you would like samples for a bathroom mock-up before committing to a full order, ask — sample quantities are handled differently from production runs, and it is cheaper to test one set against your pressure than to replace forty after handover.
Send your drawings and room counts through our contact page, or reach us on WhatsApp at +86-13928214007 (PHILLIP) to talk through the wall and supply conditions first.