Specifying a swim spa for a villa terrace, a resort pool deck or a residential development is rarely a catalogue purchase. Deck dimensions differ, the available power supply differs, and the cabinet finish has to match the rest of the outdoor specification. That is why project buyers and brand owners often approach us about OEM sourcing instead of ordering a standard unit off the shelf. Below we set out how an OEM order for the Outdoor Swim Spa WS-115AⅢ-U runs, stage by stage, and what to have ready before you send an enquiry.

What OEM sourcing covers on this model

The WS-115AⅢ-U is a compact plunge-and-massage unit in our configurable outdoor swim and hydrotherapy range, not a long swim channel. That footprint suits tight terraces, villa courtyards and resort plots where a full-length lap pool would not fit.

Catalogue specification for the WS-115AⅢ-U
Shell size: 3880 × 2200 × 1250 mm · Control system: 1 set · Water pumps: 4 pcs · Filter pump: 1 pc · Jet total: 23 pcs · LED lights: 1 pc · Total power: 11.85 kW · Features shown: water jets, LED lighting, ozone.

An OEM order starts from that base specification and then adjusts what the project needs: cabinet and cladding finish, jet layout, lighting colour, control package, insulation grade, steps, and whether options such as a heat pump, UV sterilisation or sand filtration are fitted. Our Custom & OEM Service also covers private labelling and flexible order quantities, so the same shell can leave the factory carrying your brand on the fascia, documentation and packaging.

The figures above are catalogue values. Confirm the equipment included and the electrical requirements for the configuration you select before ordering. A swim training system is not listed for the WS-115AⅢ-U, although other models in the same range offer one.

Stage 1: brief, site data and feasibility

Send the deck or slab drawing, the finished water level you want, the access route to the site, and your local power supply (phase, voltage, available circuit capacity). Installed power is a real constraint on an 11.85 kW unit, so we check it against your supply at the outset rather than after production has started. Tell us the intended use — private villa, hotel guest suite, resort or development showroom — because that drives jet arrangement, seating and how much insulation is worth specifying.

Stage 2: configuration and quotation

We return a specification sheet for the WS-115AⅢ-U with your selected options priced line by line: pumps, jets, control system, LED package, ozone or UV sterilisation, heat pump, sand filtration, insulation and steps. Because we are a one-stop furniture and building materials supplier, the same enquiry can also pick up the poolside loungers, dining set, pergola and sun-shade structures around the spa, so one package covers the whole outdoor area instead of three separate suppliers.

Stage 3: sampling and drawing sign-off

For branded or repeat programmes we confirm finishes, colour samples and the branding method — engraving, embossing or applied logos — before series production. This is where OEM buyers normally lock the drawing set. Any change to jet positions, cabinet cladding or control placement should be made at this stage, not after tooling.

Stage 4: production and quality control

Units are built to the approved configuration at our factory in China. We agree inspection points and packing detail with project buyers, since a swim spa ships as a shell plus plant set, and pumps, panels and controls must arrive undamaged.

Stage 5: freight, installation and support

We arrange door-to-door delivery through our logistics service, covering sea, air and rail freight, export paperwork and container loading, with tracking through to site. Our installation and after-sales support covers on-site installation, inspection and snag lists, spare parts and maintenance guidance. Import terms, duties and local electrical requirements are confirmed case by case with your own clearing agent and electrician; we do not write territory-specific compliance assumptions into the quotation.

What to have ready before you enquire

  • Deck or slab plan with dimensions and a note of the delivery access route.
  • Power supply details: phase, voltage and available circuit capacity.
  • Quantities and programme dates, including when units must be on site.
  • Branding requirements: logo artwork, packaging, and any labelling you will supply yourself.
  • The option list you want priced — heat pump, insulation grade, UV sterilisation, sand filtration, steps, LED colour scheme.

A practical way to start the enquiry

Enquiries on this model move fastest when the buyer sends the site drawing and power data first and lets us come back with a configuration sheet to review. If one project includes several outdoor water features, group them in a single enquiry: we can compare the WS-115AⅢ-U against longer units in the same range so each site gets the right footprint instead of forcing one model across the whole development.

To discuss OEM sourcing for the Outdoor Swim Spa WS-115AⅢ-U, contact PHILLIP on +86-13928214007 (phone/WhatsApp) or email santerson@qq.com. Include your site drawing, power supply details and required quantities, and we will prepare a configuration sheet for your project.