A request for quote is where most door projects are won or delayed. Two buyers can ask for the same Santerson Flush Sliding Doors and receive very different answers, because one supplied an opening schedule and a finish decision while the other wrote "three sliding doors, grey". The second enquiry has to come back for another round of questions before anyone can price anything. This guide sets out what to put in your RFQ so the quotation you get is accurate the first time.

Start with the opening, not the door

Flush sliding doors are made to measure for each project, and the opening decides almost everything downstream. Send a dimensioned drawing or a marked-up plan for every opening you need quoted, and give us:

  • Structural opening width and height, stated in millimetres, with the unit written out so there is no guesswork.
  • Wall build-up: what the finished wall face is, whether the surrounding surface is plasterboard, panelling, stone or tile, and how thick that finish sits.
  • Floor level and threshold condition — a flush look depends on how the door meets the floor, so tell us whether the floor is already laid or still to come.
  • Clearance for the door leaf to slide into. If there is not enough wall run beside the opening, say so at this stage; it changes the configuration rather than being discovered on site.
  • Whether the opening is new build or a retrofit into an existing wall, and any constraint on demolition or structural work.

If your drawings are still developing, send what you have and mark which dimensions are provisional. A quotation based on provisional numbers is fine as long as both sides know which numbers those are.

State the configuration you actually need

"Sliding door" covers several arrangements, and price follows the arrangement rather than the size alone. In your RFQ, specify:

  • Single leaf or multiple leaves, and how many leaves travel in each direction.
  • Whether the leaf slides across the wall face or disappears into a pocket in the wall.
  • Track orientation — top-hung or floor-guided — and any restriction on what can be fixed into the floor.
  • Handleless or minimal-edge detail, if you want the surface left uninterrupted.

It helps to say what the door is doing for the space. A door that closes off a bedroom at night has different running requirements from one that stays open most of the week and simply acts as a wall when needed. If you are weighing sliding against another option, tell us; we supply Santerson Flush Hinged Doors and Santerson Flush Interior Doors in the same made-to-measure way, and an honest comparison is more useful to you than a quotation for the wrong product.

Name the finish and the surfaces around it

Finish is where a flush door either disappears into a wall or stands out as an object on it. Give us the finish you want in as concrete terms as you can: colour, sheen level, wood species or veneer, laminate, lacquer or paint. Where possible reference a sample, a project photograph or a standard colour code rather than a mood word such as "warm grey".

Then tell us what the door has to sit against. A leaf that must match adjoining panelling needs the panel specification too, so we can see whether the door and the wall are being made to the same surface. If your project also includes wall panel systems or integrated joinery, mention it in the RFQ — grouping doors with the panelling they meet usually produces a cleaner result and a simpler order to manage.

Give quantities and phasing

A quantity of one and a quantity of thirty are not quoted on the same basis. State how many leaves you need per opening type, and group identical openings together so we can price them as a set. Then say whether everything is required at once or in stages by floor, unit or building phase. Phasing affects production planning and shipping, and it is far cheaper to plan around it than to change mid-project.

For apartment blocks, villas and hospitality work, an opening schedule in a spreadsheet works well: one line per opening type, columns for width, height, wall condition, leaf count, direction of travel, finish reference and quantity. That single table answers most of what we would otherwise have to ask.

Set out delivery, access and installation

The commercial terms in your RFQ should cover:

  • Delivery address and the Incoterms you want quoted — factory, port or door-to-door.
  • Site access: lift size, stair width, turning radius, and whether large leaves can reach the opening at all. A door that cannot get into the building is a very expensive mistake.
  • Your required on-site date, working backwards from your programme rather than forwards from today.
  • Who installs. Tell us whether you have a local contractor or want installation support, and whether you need snagging and handover documented.

We handle freight, customs paperwork and door-to-door delivery as part of the project scope, so send the delivery address with the enquiry rather than waiting for a second email round.

Say what you have already decided — and what is still open

The most efficient RFQs separate firm decisions from open questions. Mark the dimensions, finishes and quantities that are locked, and list the points where you want input. We work with custom and OEM service, including bespoke finishes and prototyping, so an unresolved detail is not a reason to delay your enquiry — it is simply a line item for us to advise on.

If you are procuring doors as part of a wider fit-out, say so. Buying sliding doors alongside flooring, cabinetry and other interior fixtures from one supplier reduces the number of interfaces that have to be coordinated between trades.

What our quotation will contain

Once we have the above, you should expect a quotation that itemises each opening type with its confirmed dimensions and configuration, states the material and finish as specified, sets out packaging and shipping terms, and identifies anything still to be confirmed before production. We confirm dimensions and selected specifications for each project before manufacture begins — that confirmation step is yours to review, so read it carefully rather than signing it back unread.

Before you send the enquiry

Run this short check: every opening has a width and height in millimetres; every opening has a wall and floor condition noted; the leaf count and direction of travel are stated; the finish is referenced to something physical; quantities are grouped by type; the delivery address and access constraints are included; and your target on-site date is written down. If all seven lines are covered, we can quote accurately, and you can compare that quotation properly against any other supplier's.

Send your opening schedule and drawings to us through the SANTERSON contact page and we will come back with a specification-based quotation for Santerson Flush Sliding Doors.