A quotation for painted shaker cabinets often arrives as a two-page PDF: a set of elevations, a price, and a delivery window. Two manufacturers can quote the same kitchen plan and produce numbers that differ by a wide margin, while both look professional on paper. The difference is rarely the door profile itself. It is what sits behind the line items — how the paint system was specified, how the carcass was chosen, and which decisions were left open for later. The checklist below follows the order in which those gaps usually appear during evaluation.

Start With What the Proposal Leaves Unspecified

Before comparing any prices, mark every item in the document that reads as a category rather than a decision. “Painted MDF door” is a category. A paint system with a named primer, a named topcoat and a stated number of cured layers is a decision. The same applies to the carcass, the edge treatment, the hinge brand, and the drawer runner rating. Anything still expressed as a category at contract stage will be settled during production, when changing it costs more than it did at quotation stage.

A practical test: list the specification items you can defend to a site supervisor without referring back to the supplier. If any of them are missing from the proposal, send the gap back now rather than at the shop-drawing stage.

Read the Door Construction Before the Colour Schedule

A shaker door is a frame around a raised or flat centre panel, and that joint line is where painted finishes are judged years later. Ask how the frame and panel are joined, whether the panel is allowed to float in its groove, and how the substrate is sealed at the edges before any colour goes on. Paint failures on this style of door usually trace back to an unsealed edge or a rigidly fixed panel, not to the colour itself.

For grey shaker cabinets and other mid-tone colours, ask specifically how the finish behaves on a rebated edge. Mid greys show a thin or uneven coat far more quickly than either a deep charcoal or an off-white, which is why a sample of the actual door profile matters more than a flat spray-out card.

Check Whether the Quote Is Built to Your Space

Catalogue pricing and made-to-measure pricing arrive in the same format, so check which one you are being quoted. Made-to-measure work should show heights and widths that follow your ceiling lines, your appliance recesses and your service runs — not a grid of standard modules arranged to look close to the plan. If the proposal only lists module codes, request dimensioned elevations before signing.

  • Dimensioned elevations, with overall heights referenced to your finished floor levels.
  • Internal partition and drawer layout per unit, not a generic interior.
  • Named hardware for hinges, runners and legs, with the load rating stated.
  • The surface finish and door colour recorded as a code or sample reference, not an adjective.

Treat the Sample as a Contract Document

Ask for an approved door sample from the same production batch logic you are buying from, and sign it with a date. A signed sample settles three arguments at once: colour under your lighting, sheen level, and how the paint sits on the profile’s edges. Keep one spare sample in the project file; when a replacement door is needed later, that card is the fastest way to match the original batch instead of re-specifying from memory.

Where a project mixes painted shaker fronts with integrated appliances, glass display cabinets or lit niches, request those interfaces on the same drawing. A wine fridge housing, an oven stack and an LED-lit glass cabinet each change the ventilation and fixing detail, and all three are easier to resolve on paper than on site. That is how the run shown in our light grey shaker style kitchen cabinets project was set out before production, with the appliance housings and display units drawn into the same elevations as the painted doors.

Price the Scope, Not Just the Cabinets

Cabinetry that crosses an ocean arrives as more than a box of doors. A usable proposal states how the units are packed and loaded, which documents accompany the shipment, and who is responsible at each handover from factory to site. Compare those terms across quotes before comparing totals; a lower cabinet price paired with incomplete logistics terms usually costs more overall than a fuller quotation.

Our custom built-in kitchen cabinets are quoted with the supporting hardware identified — hinges, drawer slide rails, support legs and connecting brackets — because omitting those items from a quote is one of the most common sources of a mid-project variation. If a competing proposal does not list them, ask whether they are included or excluded before treating the prices as comparable.

Confirm What Happens After Delivery

Ask how the supplier handles snags, replacement doors and spare parts once the units are installed, and get that answer in writing rather than in a sales conversation. Painted components are the most likely part of a kitchen to need a later match, so the practical question is not whether support exists but how quickly an identically finished panel can be produced and shipped.

Our installation and after-sales support covers site inspection with the trades on the job, snag resolution and spare-part supply, coordinated with the same project contact who handled the order. For a single apartment fit-out or a multi-unit residential package, that continuity is what keeps replacement work tied to the original specification instead of becoming a fresh purchase.

A Short Evaluation Sheet to Take Into the Comparison

Score each proposal against six questions, and reject any quote that cannot answer all of them in writing:

  1. 1Is the paint system described as primer, topcoat and layer count?
  2. 2Are the frame-to-panel joint and edge sealing stated?
  3. 3Are the elevations dimensioned to your site, not a standard module grid?
  4. 4Is a dated, signed door sample part of the agreement?
  5. 5Are packing, loading and shipping documents named in the quote?
  6. 6Is replacement and spare-part supply described in writing?

Where a Single Supplier Simplifies the Package

Painted shaker fronts rarely stay alone on a purchase order. Flooring, wall panelling, doors, lighting and bathroom fixtures usually join the same programme, each with its own supplier and its own delivery window. Working with one manufacturer that handles cabinetry alongside those other categories keeps the finish references, the drawings and the shipment schedule in one place, which is where most coordination savings actually come from on a residential or hospitality fit-out.

SANTERSON has manufactured furniture and building materials in China since 2008, supplying residential kitchens, apartment fit-outs and hospitality projects. Every painted shaker quotation is confirmed against your drawings before production, so dimensions, door colour, finish and hardware are fixed on paper rather than decided during manufacture. Send us your floor plan or elevations and we will return dimensioned cabinet layouts with the paint system and hardware specified, so you can compare proposals on equal terms.

Send your kitchen drawings for a specification-level quotation Contact PHILLIP by phone or WhatsApp at +86 139 2821 4007, or by email at santerson@qq.com. Enquiries are answered within 24 hours, Monday to Saturday.

Product dimensions, finishes and hardware configurations are confirmed for each project before production. The after-sales arrangements described above apply to orders placed through SANTERSON; ask for the written terms that apply to your specific order.