A wall-hung WC looks simple on a drawing: a bowl floating above the floor, a tank tucked behind the duct. The specification behind it is not simple at all. Rough-in depth, trap type, frame load rating, carrier compatibility and glaze quality are decided long before the tile goes up — and if they reach the factory as assumptions rather than numbers, the correction arrives after production. This guide sets out what to send us when you brief a manufacturer on the Wall Hung Toilet 1038W, Rimless Ceramic Wall Mounted WC for Modern Bathroom or an equivalent wall-mounted suite.
Start with the wall build-up, not the bowl
Send the finished wall dimension: structural substrate, framing or carrier, fixings, waterproofing, adhesive and tile thickness. That stack determines whether the waste connection lands at your set-out level and whether the actuator plate sits flush. For the 1038W we work to an 180 mm P-trap wall rough-in — so a duct built to a different depth is the single most common cause of rework, and it is worth confirming on site before you order.
- Finished face-to-finished-face dimension of the WC wall, plus stud or carrier make and model if one is fixed on site.
- Waste outlet type and height above finished floor level. The 1038W is a wall-outlet, P-trap design; where the waste is a floor outlet, tell us early so we can look at another model instead of forcing this one.
- Cistern and actuator plate plan: which plate, which face, and whether dual-flush operation is required.
State the usage profile, because that drives hardware
A guest powder room in a villa and a level of serviced apartments do not need the same specification. Tell us the fixture count per floor, expected daily use, and who cleans the rooms. That single paragraph changes seat material, hinge specification, flushing volume where your project calls for it, and how spare parts are packed into the shipment.
- Private villa or residence: finish consistency across bathrooms usually matters more than heavy-duty hardware. Our wall-hung range includes both the 1038W and the Wall Hung Toilet 1051W, Modern Wall Mounted Ceramic WC for Bathroom, which shares a clean floating profile with a compact body suited to smaller bathrooms.
- Hotel and serviced-apartment guest rooms: send the room count per bathroom type, plus replacement-part expectations. We supply matched sets so bowls, seats and plates across floors arrive as one coordinated order rather than separate lots.
- Commercial restrooms: send traffic levels and maintenance routine, and we will match hardware accordingly.
Send the ceramic and finish decision as a sample reference
The 1038W is produced in vitreous ceramic with a seamless glaze, and the rimless bowl geometry is what makes the inside face easy to wipe down on a daily housekeeping round. Colour and sheen are where briefs go wrong in text alone, so specify against a physical reference: send us a tile sample, a hardware finish chip or a RAL code, and we will match to it rather than to a description such as "matt white".
- Glaze sheen — bright gloss or a softer surface — and whether it must match basins and bathtubs in the same bathroom.
- Seat and cover specification: material, soft-close requirement, quick-release for cleaning.
- Whether the WC sits in a suite. The 1038 series pairs with the Wall Hung Basin 1038WB, Ceramic Wall Mounted Wash Basin for Bathroom, and matched sets keep lines, radii and glaze consistent across the room.
Cover installation and logistics in the same brief
Ceramics travel badly when they are packed as an afterthought. Tell us the delivery address, the receiving conditions at site, and who installs — your plumber or our site guidance. We handle custom/OEM work, packing for container loading, freight by sea, air or rail, and door-to-door delivery to project addresses, so the brief should read as a package rather than as a product line.
- Quantities by bathroom type, with a stated split between guest bathrooms and main bathrooms.
- Site access notes: lift dimensions, storage on site, and whether crates need to be broken down for the final carry.
- Spares policy: seats, seals and fixings held back per floor, so maintenance does not stall waiting for a part.
What we send back before production starts
Once the brief is in, you get a written confirmation of the rough-in and outlet geometry against your wall build-up, the specified seat and plate combination, packing and pallet detail for the shipment, and a technical sheet to circulate to the installing plumber. Nothing goes into production until those numbers come back signed off. If your drawings are still moving, send them as they stand — an early comment on duct depth and outlet position costs nothing, while the same comment after tiling is expensive.
To start a specification, send your fixture schedule, wall dimensions and finish references to our team. Browse the wider range under Bathroom Sanitary Fixtures, or read about how we coordinate fit-out packages for villas and hospitality projects on the Turnkey Solutions page.