A made-to-measure door set does not end its job at handover. In villa and hospitality work, the Santerson Modern Slim Frame French Doors will be opened, cleaned, adjusted and inspected for years after the container arrives. Before you place an order, the after-sales questions below are the ones that actually change your risk on site.
1. What is covered, and what counts as a defect versus normal wear?
Ask for the warranty scope in writing, item by item: leaf and frame, glazing beads and gaskets, hardware (hinges, handles, locks, closers), glass units and surface finish. Slim-profile frames leave little room to re-adjust, so hinge alignment and seal replacement matter more here than on a heavy traditional set.
- Which components carry the same warranty period, and which are treated as consumables?
- What is excluded — site damage, misuse, movement of the building, third-party modifications?
- Does the warranty follow the unit or the original purchaser, in case the asset is handed to a facility operator?
2. How are replacement parts supplied, and how long does it take?
A door that sits idle for six weeks waiting for one hinge becomes a snag list item and a cost entry. Ask specifically about spare glass beads, gaskets, matching hinges and handles, and whether the same profile section stays available after your project closes. If you are ordering Classic French Double Doors alongside slim frame sets for another part of the building, confirm which hardware is shared between them — shared parts reduce the spares you need to keep on site.
3. Who adjusts and re-hangs the doors after installation?
French doors drift: floors settle, thresholds get cleaned out, seals get pinched. Clarify who does the first post-handover adjustment and at what cost. The supplier's Furniture Installation and After-sales Support service covers on-site installation, inspection with a snag list, warranty coverage, spare parts or replacement, and ongoing maintenance. Ask which of these apply to your site, who attends, how quickly they attend, and what preparation you must provide — access, power, protection of finished floors.
4. What documentation comes with the order?
| Document | Why you need it later |
|---|---|
| Approved shop drawings with final sizes and opening direction | Basis for any replacement leaf or repair quote |
| Finish schedule — colour, sheen, grain, glass type | Matching a panel or bead years later without re-matching by eye |
| Hardware schedule with brand and model references | Sourcing hinges and locks locally if needed |
| Cleaning and maintenance note for the selected finish | Housekeeping teams use the wrong cleaner more often than they break anything else |
| Packing list keyed to door set numbers on the drawings | Finding one missing part in a full container |
5. How do you report a problem, and who answers?
Ask for one named contact and one channel for the whole after-sales period, plus the information they expect in a claim: door set number from the shop drawing, photograph of the issue, description of the setting (traffic level, exposure to water or sunlight), and what has already been tried. Claims written this way are resolved faster than claims that say "the door is not right".
- Response window for a reported snag, and how urgent cases are separated from routine ones
- Whether remote guidance (photos, video, a dimension check) is offered before anything is shipped
- Who pays freight on a replacement part, and under what condition
- How long your drawings, finish schedule and hardware schedule remain retrievable from the supplier
6. What happens when you order more doors later?
Phased villas and hotel refurbishments reorder doors months or years after the first batch. Ask how a repeat order is handled: are your original specifications kept, does the finish formula stay identical, and what sample would be produced before production resumes? If phase two also includes made-to-measure joinery from the same supplier — wardrobes, vanities, Santerson Flush Interior Doors in matching finish — a retained specification file is what keeps the new work visually consistent with what is already installed.
Before you sign: five questions to put in writing
- Send the warranty scope for frame, glass, seals and hardware separately, with exclusions listed.
- Provide a spares list with part references and prices for 10 door sets.
- State who performs post-handover adjustments, at what cost, and within what response time.
- Confirm the profile and hardware stay available for re-order, and for how long.
- Confirm that shop drawings, finish schedule and hardware schedule are archived and can be re-issued on request.
These answers cost a supplier an hour to write and save a project weeks of snags. Get them before production starts, not after the first door sticks.
SANTERSON manufactures and supplies furniture and building materials for villa, hospitality and office projects, with custom/OEM production, logistics and door-to-door delivery, installation and after-sales support. Enquiries: Contact SANTERSON.