A slim frame French door looks simple from a distance: two leaves, a run of glass, a narrow sightline. That simplicity is exactly why it is easy to specify badly. When the frame profile is thin, every undecided detail — where the opening dimensions came from, which leaf carries the lock, how the meeting stiles overlap, what the glass is doing — shows up later as a site problem rather than a drawing comment. Below is the specification route we follow on Santerson Modern Slim Frame French Doors, written so that a buyer, specifier or project manager can reuse it as a working checklist for any made-to-measure door opening in a villa or hospitality fit-out.
Start with the opening, not the catalogue size
Our French Doors collection is built to project-specific dimensions, so the first line of any specification is the opening itself and how it was measured. Record the width and height at three positions across each opening — left, centre, right for the width; top, centre, bottom for the height — and note the smallest reading as the reference, together with the variation between readings. A difference of only a few millimetres changes whether the frame packs evenly on one side or whether the head needs packing above the hinge stile.
Then state, in writing, three things that are usually left to the installer's judgement:
- The finished floor level at the threshold, and whether the floor build-up is already complete or still to come.
- The wall finish on both faces, including lining, plasterboard, tile or panel thickness at the reveal.
- Whether the opening is square and plumb, with the actual out-of-plumb reading if it is not.
Send these as a marked-up drawing rather than a table of numbers alone. A sketch that shows which side is tiled, where the skirting stops and where the ceiling line lands removes most of the guesswork before production starts.
Write down the leaf layout and the opening logic
Slim frame double doors fail most often on layout ambiguity. For each opening, specify:
- Active and inactive leaf. Which leaf opens first, which carries the lock and handles, and whether the inactive leaf is rebated with a flush bolt.
- Hinge hand. Left-hand and right-hand as seen from the side you stand on most often, stated once and used consistently across the whole schedule.
- Swing direction. Into or out of the room, checked against furniture layout, curtain positions, radiator locations and any adjacent door arc.
- Meeting stile detail. Whether astragals or rebates are required, and whether a mullion is wanted between paired openings.
If the doors will be used daily rather than for occasional access to a garden room or study, say so in the specification. Daily use drives heavier ironmongery, an active leaf sized for the traffic side, and a threshold detail that can take footfall.
Specify the glass separately from the frame
On a slim frame door the glazing is most of the area, so it deserves its own line in the specification rather than a phrase such as "clear glass". State:
- Glass configuration — single glazed, double glazed unit, or laminated — and the make-up you have asked for.
- Clear, low-iron, tinted, patterned or decorative interlayer, with a physical sample reference rather than a colour name alone.
- Whether glazing bars are structural or applied, their spacing and their finish.
- Glass retention method at the rebate, since this affects both appearance and how the unit is replaced later.
Where a door sits between rooms with different acoustic or privacy needs, flag it at specification stage. Retrofitting glazing after the frame is on site is slow and usually visible.
Name the finish and how it will be proved
The collection offers material and finish options, so a written finish name is not enough on its own. For each door set, record:
| Item to specify | What to write down |
|---|---|
| Frame and leaf material | The selected substrate and any veneer, lacquer or paint system, named per line item. |
| Colour or grain | Sample code plus a signed physical sample, retained on file for the whole order. |
| Sheen | Matte, satin or gloss, confirmed against a board under site lighting rather than in the showroom. |
| Ironmongery | Handle, lock, flush bolt and hinge model, finish, and who supplies each item — us or your supplier. |
| Architrave and arch detail | Profile, width, and whether architraves butt or are scotia-fixed; state the wall build-up they must sit proud of. |
Ask for a signed sample board before production release, and keep it. When a later order repeats the same door type in another villa or hotel wing, the retained sample is what keeps the two batches matching.
Match the door type to the job
Slim frame work usually sits alongside other joinery in the same schedule, and mixing types deliberately is often the right call. A modern apartment or villa extension pairs well with Modern Slim Frame French Doors, while a period property or a classical scheme may need Arched French Doors or Classic French Double Doors to carry the moulding language. Where a plain flush opening is wanted instead of glazed leaves, Decorative Interior Doors and Standard Interior Hinged Doors complete the same wall. Browse the full range under Windows and Doors when building a door schedule for a whole floor.
Build the specification into one document per opening
A workable door schedule has one row per opening, not one row per door type. Each row should carry: opening reference and mark; measured width and height with the variation noted; leaf layout and hinge hand; swing direction; glass build-up; frame material and finish code; ironmongery list with supplier; architrave detail; and delivery sequence relative to wet trades and flooring.
Then close the loop before release. Our Custom & OEM Service covers bespoke sizing, material and finish selection, prototyping and production coordination, while Interior Design Services supports layout planning, drawings and on-site guidance when the door schedule has to be resolved against a furniture plan. Under our Turnkey Solutions, doors are procured alongside the joinery, flooring and fixtures they meet, which is where most of the coordination value sits — one party holding the frame sizes, the floor levels and the architrave profiles removes the handover gaps between trades.
If you have a door schedule that needs checking — opening sizes, leaf layout, glazing or finish codes — send the drawings and the room-by-room list to SANTERSON, and we will return a specification with the gaps marked before anything goes into production.